Loading...
HomeMy WebLinkAboutWQ0015515_Response to Notice_20221010=IRPB SXems Construction Services • Contract Operations • Maintenance October 10, 2022 Mr. Jennifer Graznak Division of Water Resources, NCDEQ-WSRO Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Re: Notice of Violation (NOV-2022-PC-0554) WQ0015515/Watauga County Ms. Graxnak, This letter is in response to compliance evaluation inspection on 8-30-22 and NOV-2022- PC-0554 letter dated 9-23-22 to Bear Pen Village attached. Per your outline letter we will respond as well: 1. Wet spot - The wet spot next to the effluent storage tank was not present or noticeable when we started operation of this system. Since we observed the wet spot within the past few months, we have been trying to lower the tank to be able to inspect the inside of the tankage. Now the wet spot has stopped. We will continue to lower the tank and have the inside inspected for possible repairs. 2. Concerns listed: a. We will check the calibration of the irrigation equipment this month as noted. b. We have ordered a rain or moisture sensor and will install when received. c. We will order signs for the irrigation field and have installed when received. d. We have started the change ORC forms and will submit the changes when completed. Please note since taking over the operation the owners have approved us to upgraded the air headers, drop diffusers, sludge returns, blower assemblies, and the irrigation control panel and interface. If you have any questions, please call anytime. T�./� 15" Robert Barr P.O. Box 1325 Asheville, N.C. 28802 (828)-251-1900 (828)-251-1945