Loading...
HomeMy WebLinkAboutNCS000246_Corrected NOC_20221010ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality October 10, 2022 CERTIFIED MAIL 7022 0410 0002 1249 5384 RETURN RECEIPT REQUESTED City of Fayetteville Attn: Douglas Hewett, City Manager 433 Hay Street Fayetteville, North Carolina 28301 Subject: NOTICE OF COMPLIANCE (NOC-2023-PC-0930) City of Fayetteville NPDES MS4 Permit No. NCS000246 Cumberland County Dear Mr. Hewett: On September 20ih, 2022 through September 22nd, 2022, staff from the North Carolina Department of Environmental Quality (DEQ) conducted a compliance audit of subject National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit. The audit identified minor deficiencies with the specific components of the MS4 permit that were reviewed, as provided in the attached DEQ MS4 Permit Compliance Audit Report. In accordance with Part VI of the permit and DEQ policy, a new 5-year MS4 permit will be issued in response to the audit. As such, the permittee is required to complete the following actions: (1) Respond in writing within thirty (30) calendar days from the date of receipt of this notice to acknowledge these requirements and the intent to comply. (2) Develop a Stormwater Management Plan (SWMP) which details specific actions, measurable goals, and implementation timelines for the stormwater management program over the new 5-year permit term. The permittee shall submit the SWMP to DEQ for review and comment within one hundred twenty (120) calendar days from the date of receipt of this letter. (3) Submit an NPDES MS4 permit application for whichever comes first: a. At least one hundred eighty (180) days prior to permit expiration, or b. Within thirty (30) days of receiving written DEQ concurrence that the submitted SWMP documents a compliant stormwater management program and the MS4 should submit the application including a signed Final Draft SWMP. A new 5-year NPDES MS4 permit will be public noticed along with the Draft Final SWMP. (4) Respond to comments on the Draft Final SWMP and submit a signed Final SWMP for DEQ approval and final permit issuance. The final DEQ-approved SWMP shall become an enforceable component of the NPDES MS4 permit. D_E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvovry curouw, oeoe,uMmmE,e,��m.�uianin 828.296.4800 Required documentation shall be submitted via e-mail to Isaiah.Reed@ncdem gov Or to: DEQ-DEMLR Stormwater Program Attn: Isaiah Reed 1612 Mail Service Center Raleigh, NC 27699-1612 Thank you for your attention to this matter. Should you have any questions, please contact me at Isaiah.Reed@ncdenr.gov. Sincerely, Isaiah Reed, PE, CPSWQ, MS4CECI MS4 Program Coordinator Enclosures: DEQ MS4 Permit Compliance Audit Repot CC: Byron Reeves byronreeves0fayettevillenc.gov Sheila Thomas-Ambat sheilathomasambat0fayettevillenc gov DEMLR Stormwater Program Supervisor DEMLR NPDES MS4 Permit Laserfiche File If D_E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 701 Swannanoa, North Carolina 28778 o �:m.m�r,J.�eo ma��i"11h 828.296.4500 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PROGRAM AUDIT REPORT NPDES PERMIT NO. NCS000246 FAYETTEVILLE, NORTH CAROLINA 433 Hay Street Fayetteville, North Carolina 28301 Audit Date: September 20-22 2022 Report Date: September 30, 2022 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 9' floor 1612 Mail Service Center Raleigh, NC 27699-1612 (This page intentionally left blank) NCs000246_Fayetteville Ms4 Audit_20220930 TABLE OF CONTENTS AuditDetails..................................................................................................................................................1 PermitteeInformation..................................................................................................................................2 List of Supporting Documents.......................................................................................................................3 Program Implementation, Documentation & Assessment...........................................................................4 Illicit Discharge Detection and Elimination(IDDE)........................................................................................5 Site Visit Evaluation: Municipal Facility No. 1...............................................................................................6 Site Visit Evaluation: Municipal Facility No. 2...............................................................................................7 Site Visit Evaluation: Post -Construction Stormwater Measure No. 1...........................................................8 Site Visit Evaluation: MS4 Outfall No. 1........................................................................................................9 DISCLAIMER This audit consists of an evaluation of program compliance with the issued permit and implementation of the approved Stormwater Management Plan. This audit report does not include a review of all program components, and program deficiencies in addition to those noted may be present. The permittee is required to assess program progress and permit compliance, and to implement the approved Stormwater Management Plan in accordance with the issued permit. NCS000246_Fayetteville MS4 Audit_20220930 ii This page intentionally left blank NCS000246_Fayetteville MS4 Audit_20220930 Audit Details Audit ID Number: Audit Date(s): NCS000246_Fayetteville M54 Audit_20220930 7 September 20, 21, and 22 2022 Minimum Control Measures Evaluated: ® Program Implementation, Documentation & Assessment ❑ Public Education & Outreach ❑ Public Involvement & Participation ® Illicit Discharge Detection & Elimination ❑ Construction Site Runoff Controls — No delegated Sediment and Erosion Control Program ❑ Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program ❑ Post -Construction Site Runoff Controls ❑ Pollution Prevention and Good Housekeeping for Municipal Operations ❑ Total Maximum Daily Loads (TMDLs) Field Site Visits: ® Municipal Facilities. Number visited: 2 M MS4Outfalls. Number visited: 1 ❑ Construction Sites. Number visited: Choose an item. ® Post -Construction Stormwater Runoff Controls. Number visited: 1 ❑ Other: Number visited: Choose an item. ❑ Other: Number visited: Choose an item. Inspector(s) Conducting Audit Name Organization Isaiah Reed, Environmental Engineer NCDEQ Mike Lawyer, Environmental Program Consultant NCDEQ Bailey Taylor, Environmental Specialist NCDEQ Audit Report Auth Date: Signature iz2Z10/1:)470 z NCS000246_Fayetteville MS4 Audit_20220930 Page 1 of 9 Permittee Information MS4 Permittee Name: Permit Effective Date: Permit Expiration Date: City of Fayetteville October 10, 2018 October 9, 2023 Mailing Address: Date of Last MS4lnspection/Audit: 433 Hay Street. Fayetteville, North Carolina 28301 February 19, 2015 Co-permittee(s), if applicable: N/A Permit Owner of Record: Douglas Hewett, City Manager Primary MS4 Representatives Participating in Audit Name, Title Organization Day 1(9/20/2022) Byron Reeves, Assistant Public Services City of Fayetteville Director Nick Baggett, Stormwater Inspections City of Fayetteville Supervisor Shauna Haslem, Public Information City of Fayetteville Specialist Sheila Thomas, Public Services Director City of Fayetteville Mitch Colvin, Mayor City of Fayetteville Ben Stout, SWAB Chair City of Fayetteville Deno Hondros, City Council/SW Committee City of Fayetteville Chair Day 2 (9/21/2022) Byron Reeves, Assistant Public Services City of Fayetteville Director Nick Beggett, Stormwater Inspections City of Fayetteville Supervisor Sheila Thomas, Public Services Director City of Fayetteville Shauna Haslem, Public Information City of Fayetteville Specialist. NCS000246_FayetteviIle MS4 Audit_20220930 Page 2 of 9 List of Supporting Documents Item Number Document Title When Provided (Prior to/During/After) 1 Chapter23 Ordinance Prior 2 2021 Annual Report Prior 3 Stormwater Plan Final July 21 Prior 4 Field Screening SOP Prior 5 2015 Impaired Stream SOP Prior 6 2015 Industrial SOP Prior 7 2015 Water Quality Monitoring SOP Prior 8 IDDE Training PDF Prior NCS000246_Fayetteville MS4 Audit_20220930 Page 3 of 9 Program Implementation, Documentation & Assessment Staff Interviewed: All in attendance Day 1 (Name, Title, Role) Permit Citation Program Requirement Status supporting Doc No. II.A.1 The Permittee Maintained adequate legal mechanisms to implement all provisions of Adequate Legal the of the Stormwater Management Plan. Yes 1 Mechanism The permittee is current on payment of invoiced administering and compliance monitoring fees (see stormwater e-payments on DEMLR M54 web page). Yes BIMS II.A.2 Stormwater Plan The permittee evaluated the performance and effectiveness of the program Implementation components at least annually. Yes 2 and Evaluation II.A.3 Keeping the The permittee kept the Stormwater Plan up to date. Partial 3 Stormwater Plan Up to Date The permittee notified DEMLR of any updates to the Stormwater Plan. No Did DEMLR require a modification to the Stormwater Plan? No II.A.4 Written The permittee maintained written procedures for implementing the six minimum Procedures control measures. Partial 4,5,6,7 Comments., The Stormwater Management Plan has not been signed by the Permit Owner. Submittal process is not documented. SOPS have been created to function as Written Programs. However, SOPS do not exist for all MCMs. NCS000246_Fayetteville MS4 Audit_20220930 Page 4 of 9 Illicit Discharge Detection and Elimination (IDDE) Staff Interviewed: All in attendance Day 2 (Name, Title, Role) Permit Citation Program Requirement Statu supporting Doc s No. II.D.2.a Maintain The permittee maintained appropriate legal Authorities. Yes 1 appropriate legal authorities Ordinance does not contain violation fees. Fees outline is in a separate document (Fee schedule). II.D.2.b Maintain a Storm Software Sewer System The permittee maintained a map system including major outfalls. Partial demonstrate Base Ma of p d during the Major MS4 audit. Outfal Is. System map did not include the ability to quantify major outfalls and industrial areas specifically. II.D.2.c Maintain written The permittee maintained written procedures and SOPS for detecting and tracing procedures and/or Illicit discharges. Yes q SOPS for IDDE. II.D.2.c The permittee maintained written procedures or SOPS for dry weather flow Dry weather flow Yes 4 inspections. inspections II.D.2.d The permittee conducted IDDE training for appropriate municipal staff. Yes g Employee Training II.D.2.e Website Maintain a public The permittee and publicized a reporting mechanism for the public to report illicit examined reporting connections and discharges. Yes duringthe mechanism audit. Fay -Fix -It App. Hotline. Brochures, Fayettevillenc.gov II.D.2.f Investigation Documentation tracking The permittee documented dates of investigations Yes software was examined during the audit. Documentati The permittee documented enforcement actions Yes on examined during the audit. Cityworks tracking software and methods were discussed during the audit. Additional Documentation of several IDDE Investigations were examined during the audit. No major issues with Comments: documentation methods were observed. NCS000246_Fayettevilie MS4 Audit_20220930 Page 5 of 9 Site Visit Evaluation: Municipal Facility No. 1 Facility Name: Date and Time of Site Visit: Fayetteville Airport September 22, 2022 Facility Address: Facility Type (Vehicle Maintenance, Landscaping, etc.): 400 Airport Road Airport Name of MS4 inspector(s) evaluated: Most Recent MS4 Inspection (Date and Entity): Josh Robbins Not Evaluated Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit: Name Title Patricia Campbell Airport Manager Observations Facility Documentation/Training Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific? Yes What type of stormwater training do facility employees receive? How often? Annual Stormwater training. Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Annual Stormwater training. Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping? Yes Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping? Yes Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? Yes Does the MS4 inspector's process include taking photos? Yes Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)? Yes Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? Yes Did the MS4 inspector miss any obvious areas of concern? If so, explain: No Does the MS4 inspector's process include presenting the inspection findings to the facility contact? Yes Inspection Results Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)? Modifications to PM&GH practices relating to the NCG080000 requirements. Comments: During the site visit, secondary containment status of generators on site was discussed. As well as spill prevention measures in the fueling areas. NCS000246_Fayetteville MS4 Audit_20220930 Page 6 of 9 Site Visit Evaluation: Municipal Facility No. 1 Site Visit Evaluation: Municipal Facility No. 2 Facility Name: Fayetteville Area System of Transit Bus Garage Date and Time of Site visit: September 22, 2022 Facility Address: 455 Grave Street Fayetteville, NC 28301 Facility Type (Vehicle Maintenance, Landscaping, etc.): Vehicle Maintenance Name of MS4 inspector(s) evaluated: Josh Robbins Most Recent MS4 Inspection (List date and name of inspector): No evaluated Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit: Name Title Sidney Small and Daniel Edwards Bus Maintenance and Solid Waste Observations Facility Documentation/Training Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific? Yes. What type of stormwater training do facility employees receive? How often? Annual Stormwater training. Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Annual Stormwater Training. Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping? Yes Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping? Yes Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? Yes Does the MS4 inspector's process include taking photos? Yes Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)? Yes Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? Yes Did the MS4 inspector miss any obvious areas of concern? If so, explain: No Does the MS4 inspector's process include presenting the inspection findings to the facility contact? Yes Inspection Results Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)? No Comments: SWPPP contents and monitoring documentation was discussed. NCS000246_Fayetteville MS4 Audit_20220930 Page 7 of 9 Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1 Site Name: Date and Time of Site Visit: Airborne and Special Operations Museum (ASOM) Bio- September 22, 2022 retention 1 Site Address: SCM Type: Hillsboro Street Bio-retention Most Recent MS4 Inspection (Include Date and Entity): Not reviewed Name of MS4lnspector(s) evaluated: Most Recent MS4 Enforcement Activity (Include Date): Danielle Quick Not reviewed Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title None None Observations Site Documentation Does the site have an operation and maintenance plan? Yes Does the site have records of annual inspections? Are they performed by a qualified individual? Yes Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Annual stormwater training. Did the MS4 inspector appear knowledgeable about M54 requirements for post -construction site runoff controls? Yes Did the MS4 inspector appear knowledgeable about post -construction BMPs (general purpose/function, components, 0&M requirements, etc.)? Yes Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? What format? Yes Does the MS4 inspector's process include taking photos? Yes Does the MS4 inspector's process include reviewing the site's operation and maintenance plan and records of annual inspections? Yes Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Yes Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain: No Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Not evaluated on site. Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? Inspector reports that the inspection report will be followed by verbal inquiry concerning the landscaping practices. If compliance issues were identified, what timeline for correction/follow-up was provided? Landscaping activity has rendered the detention ineffective due to damage to the "cleanout pipes". Landscaping practices were discussed on site. NCS000246_Fayetteville MS4 Audit_20220930 Page 8 of 9 Site Visit Evaluation: MS4 Outfall No. 1 Outfall ID Number: HW6547 Date and Time of Site Visit: September 22, 2022 Outfall Location: Hillsboro Street Outfall Description (Pipe Material/Diameter, Culvert, etc.): RCP Receiving Water: Cross Creek Is Flow Present? If So, Describe (Color, Approximate Flow Rate, Sheen, Odor, Floatables/Debris, etc.): Outfall was submerged. Most Recent Outfall Inspection/Screening (Date): Not Reviewed Days Since Last Rainfall: Not evaluated Inches: I N/A Name of MS4lnspector(s) evaluated: Carl Almarode Observations Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Annual Stormwater training. Did the MS4 inspector appear knowledgeable about illicit discharge indicators and investigations? Yes Inspection Procedures Does the inspector's process include the use of a checklist or other standardized form? Yes Does the inspector's process include taking photos? Yes Did the MS4 inspector miss any obvious potential illicit discharge indicators or maintenance issues? If so, what were they? No Inspection Results Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)? No Will a follow-up outfall inspection be conducted? If so, for what reason? Yes. Routine. Notes/Comments/Recommendations Further investigation showed that the stormwater infrastructure near the outfall may be incorrect on incomplete. Follow-up evaluation is planned by the permittee. NCS000246_FayetteviIle MS4 Audit_20220930 Page 9 of 9