HomeMy WebLinkAboutNC0065099_Site Visit_20221004United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 IL I 3 I NC0065099 111 121 22/10/04 117
Type
181 p I
IIIIIIIIIII
Inspector Fac Type
191 S I 2011
21IIIIII IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 70I I 711 172 I N I 73I 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Southport Power Plant
1281 Power House Dr SE
Southport NC 28461
Entry Time/Date
09:45AM 22/10/04
Permit Effective Date
20/04/01
Exit Time/Date
10:30AM 22/10/04
Permit Expiration Date
25/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jeremy R Watkins,1281 Powerhouse Dr Southport NC 28461/Operations
Manager/910-343-6732/ No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Brian S West DWR/WIRO WQ/910-796-7341/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N C 0065099 111 121 22/10/04
117
Inspection Type
18[j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Site demolition is mostly complete. Wastewater settling basins have been emptied and are ready for
demolition. Outfall pump house is still intact, but discharge line was observed to be physically
disconnected. CPI plans to request permit rescission soon
Page# 2
Permit: NC0065099
Inspection Date: 10/04/2022
Owner - Facility: Southport Power Plant
Inspection Type: Reconnaissance
Yes No NA NE
Page# 3