HomeMy WebLinkAboutSW1221001_Supplement-EZ Form_20221004WET POND 11 Drainage area number 1 2 Minimum required treatment volume cu ft 21939 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? No 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 31 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 151 Is there an O&M Plan that complies with General MDC (12)? Yes 161 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned by an NC licensedprofessional? Yes WET POND MDC FROM 02H .1053 18 Sizing method used SAIDA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 2572.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 2572.50 22 Elevation of the bottom of the vegetated shelf (fmsl) 2576.50 231 Elevation of the permanent pool (fmsl) 2576.50 24 Elevation of the top of the vegetated shelf (fmsl) 2577.50 25 Elevation of the temporary pool fmsl 2577.90 26 Surface area of the main permanent pool (square feet) 10869 27 Volume of the main permanent pool (cubic feet) 36447 cf 28 Average depth of the main pool (feet) 3.35 ft 29 Avera e depth euation used Equation 2 30 If using equation 3, main pool perimeter (feet) 311 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 6447 cf 33 Is this 15-20 % of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 6 in 35 Design volume of SCM cu ft 36447 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter inches 8 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 401 Drawdown time for the temporary pool (days) 3.6 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 54 in 44 Depth of forebay at exit (inches) 42 in 45 Does waterflow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 471 SloiDe of ve etated shelf H:V 61 48 Does the orifice drawdown from below the top surface of the ermanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hrstorm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met. No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment NCDEQ Mix 1M 54 Hasa plantinq plan been rovided for the v ietated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 10:46 AM 9/29/2022