Loading...
HomeMy WebLinkAboutNCS000601_Sawmills 2022 Annual Report_20220830Reporting Line Year BMP Measurable Goal Reporting Comments No. (July 1 - Ref. Metric June 30) Did Sawmills submit the Annual Self -Assessment to NCDEQ prior 1 1 1 to August 31 each year? YES Did Sawmills develop and distribute new fliers to raise 9 1 3.B.1. general stormwater awareness? YES If so, how many general stormwater awareness fliers were 10 1 3.B.1. distributed? 40 Did Sawmills attend the annual Fall Festival and Tractor Treat to disperse stormwater outreach materials/awareness through the use of interactive educational Festival did not 19 1 4.B.1. games and activities? No take place If so, how many event attendees were engaged in stormwater outreach/received stormwater 20 1 4.B.1. information? Farmer's Did Sawmills provide additional Markets and outreach supplement or Stream Clean - alternative outreach opportunities Up with if the annual Fall Festival was Supplemental 29 1 4.B.2. canceled? Yes Activity If so, how many attendees were 30 1 4.B.2. engaged in stormwater outreach? 35 Did Sawmills have WPCOG provide instruction and stormwater 39 1 5.B.1. educational activities to youth? Yes If so, how many WPCOG youth education activities/events were 40 1 5.B.1. provided? 2 If so, how many WPCOG youth 41 1 5.B.1. event participants were reached? 10 How many storm drains were 54 1 5.B.2. stenciled? 0 Did Sawmills create a presentation covering stormwater topics to be Presentation is presented in digital classrooms being 59 1 5.B.3. and/or provided to teachers? No developed. If so, how many classroom presentations were provided by 60 1 5.B.3. teachers or staff? If so, how many students were reached by classroom 61 1 5.B.3. presentations? Did Sawmills develop printed stormwater best practices materials for local government 74 1 6.B.1. distribution? Yes Did Sawmills provide one presentation about one of the six NPDES Minimum Control Measures at each annual WPCOG 75 1 7.B.1. Water Quality Conference? Yes If so, how many attendees were reached during the annual WPCOG Water Quality Conference 76 1 7.B.1. stormwater presentation? 137 Did Sawmills evaluate the target pollutants and audiences to Changes were identify where outreach can be not required at 85 1 8.B.1. improved? YES this time. If so, were any revisions made to 86 1 8.B.1. target pollutants? NO If so, were any revisions made to 87 1 8.B.2. target audiences? NO Did Sawmills maintain and update the stormwater program web 100 1 10.13.1. page? YES Was the annual selfassessment 101 1 10.13.2. uploaded to stormwater website? YES Did any links, contact information, or documents on the stormwater 102 1 10.13.2. web page need to be updated? YES How many hits did the 103 1 10.13.3. stormwater web page receive? Did Sawmills provide citizen education as part of the enforcement process for illicit discharges, illegal dumping and 116 1 11.13.3. improper disposl of waste? YES If so, how many educational citizen interactions were completed as part of the illicit discharge and illegal dumping 117 1 11.13.3. enforcement process? 2 Did Sawmills establish a hotline for stormwater complaints and 126 1 12.B.1. information? YES Did Sawmills identify specific staff who will serve as the hotline 127 1 12.13.2. contact(s)? YES How many stormwater hotline 128 1 12.13.3. calls were received? 6 Did Sawmills stormwater hotline staff receive training in general stormwater awareness, complaint call protocols, appropriate contacts for referral, and typical 133 1 12.13.4. stormwater issues? YES Did Sawmills publicize contact information on the municipal Facebook page, and the stormwater program and WPCOG 138 1 12.13.5. webpages? YES Did Sawmills establish a web based complaint/ reporting/input 143 1 15.13.1. form? YES Did Sawmills maintain a Facebook 152 1 16.13.1. page for stormwater messaging? YES Did Sawmills utilize the Facebook page to promote public involvement in stormwater programs, events and projects and provide outreach/general 153 1 16.13.2. stormwater awareness messages? YEs If so, how many posts were made on the Facebook page related to 154 1 16.13.2. the stormwater program? 1 Did Sawmills participate in quarterly Water Resource 167 1 17.13.1. Committee meetings? YES If so, how many quarterly Water Resource Committee meetings did 168 1 17.13.1. Sawmills participate in? 2 If so, how many attendees (total of all meetings) were at quarterly Water Resource Committee meetings that Sawmills 169 1 17.13.1. participated in? 38 Did Sawmills provide a survey to engage the public and gauge 182 1 18.B.1. public interest in stormwater YES issues and the stormwater program? Survey is available but none have If so, how many surveys were been received 183 1 18.13.1. completed? 0 at this time Did Sawmills provide and promote volunteer stream cleanup Cleanup at 192 1 19.13.1. activities? YES Veteran's Park If so, how many stream cleanup 193 1 19.B.1. events were held? 1 If so, how many stream cleanup 194 1 19.13.1. participants were there? 13 If so, how many trash bags were filled during stream cleanup 195 1 19.B.1. events? 8 Did Sawmills provide materials for volunteer stream cleanup activities hosted by Sawmills and 212 1 19.13.2. WPCOG? YES Did Sawmills supplement or replace stream clean-up time with outdoor educational activities if streams do not have adequate 217 1 19.13.4. litter available for cleanup? YES If so, how many supplemental or replacement outdoor educational 218 1 19.13.4. activities were held? 1 If so, how many supplemental or replacement outdoor educational 219 1 19.13.4. activity participants were there? 13 Did Sawmills update the existing MS4 map to include open channels, storm drain information Mapping is in 232 1 20.13.1. and flow direction? YES progress Prior to this year Sawmills did not have many outfalls mapped. Currently they are being inspected as If so, was at least 20% of the MS4 they are 233 1 20.13.1. area mapped? Yes mapped Mapping is on Did Sawmills add newly going and constructed infrastructure to the progressing 242 1 20.13.2. existing MS4 map? YES well Updates to the ordinance have been provided and are in progress Did Sawmills review the IDDE of being 247 1 21.13.1. ordinance and update if needed? YES adopted Did Sawmills develop a written 252 1 22.13.1. IDDE Plan? YES Template for IDDE plan and What date did Sawmills submit O&M plan was the written IDDE Plan to DEQ for provided to JP 253 1 22.13.1. approval? ##### on 11/3/2020 Without repeat discharges priority IDDE areas were not applicable. Currently working with WM site maps and NPDES permit locations to generate priority areas. High pollution potential areas Did Sawmills use the MS4 map to (such as locate priority areas likely to have industrial) are 254 1 23.B.1. illicit discharges? YES prioritized Did Sawmills establish dry weather inspection procedures and a 259 1 24.B.1. schedule? YES Did Sawmills establish procedures to track and document illicit 272 1 25.B.1. discharge investigations? YES Did Sawmills screen priority areas 273 1 26.B.1. likely to have illicit discharges? YES A discharge was reported in an auto recycling yard but upon investigation no discharge was found and they were maintaining If so, how many illicit discharges NPDES 274 1 26.13.1. were identified in priority areas? 0 documentation Did Sawmills evaluate and assess the IDDE plan/program and revise 283 1 26.13.3. if necessary? YES Did Sawmills develop the IDDE 288 1 27.13.1. tracking sheet? YES How many verified IDDE issues 289 1 27.13.2. were identified? 2 Did Sawmills enforce illicit discharge and illegal dumping 294 1 27.13.3. violations? YES How many illicit discharge and illegal dumping Dumping of violations/enforcement actions grey water into 295 1 27.13.3. were issued? 1 a storm drain How many illicit discharge and illegal dumping violations/enforcement actions 296 1 27.13.3. were resolved? 1 Tracking tool is in place, but no chronic violators were determined Did Sawmills establish and within this maintain a list of chronic reporting 309 1 27.13.4. violators? YES period If so, how many chronic violators 310 1 27.13.4. were identified? 0 Did Sawmills identify staff and contractors likely to observe and identify illicit discharges, illicit connections, illegal dumping and 327 1 28.13.1. spills? YES Full staff training still Did Sawmills train identified staff needs to be and contractors to identify and done for some report illicit discharges, illicit Town of connections, illegal dumping and Sawmills Public 328 1 28.13.2. spills? PARTIAL Works Staff How many staff and contractors were trained to identify and report illicit discharges, illicit connections, illegal dumping and 329 1 28.13.2. spills? 5 Did Sawmills utilize social media and the stormwater webpage(s) to publicize contact information for 338 1 29.13.2. IDDE reporting? YES Did Sawmills evaluate the IDDE 343 1 32.13.2. complaint response time? YES Sawmills has overall not had <24 Hour many illicit If so, what was the average response, discharges response time for IDDE complaints <2 days during this 344 1 32.13.2. / reports? resolved permit cycle Full staff training still needs to be Did Sawmills train municipal staff done for some on proper handling of Town of construction site runoff Sawmills Public 353 1 33.13.1. complaints? PARTIAL Works Staff How many staff were trained on proper handling of construction 354 1 33.13.1. site runoff complaints? 5 No construction How many construction site runoff site runoff complaints were received from discharges 355 1 33.13.2. municipal staff? 0 were reported Did Sawmills administer a public survey to receive perspective on 368 1 34.13.1. construction site runoff? YES Did Sawmills publicize the ability to report concerns about construction runoff issues via the 369 1 1 1 34.13.4. online form on the Sawmills and YES WPCOG websites and social media? Updates to the ordinance have been provided and Did Sawmills develop an are in progress ordinance that addresses of being 378 1 35.13.1. construction site waste? PARTIAL adopted Updated ordinance has been provided to the Town, in progress of Did Sawmills adopt an ordinance being adopted that addresses construction site at time of 379 1 35.13.2. waste? NO report Did Sawmills train municipal staff on identifying and reporting 384 1 35.13.3. construction site waste violations? YES How many staff were trained on identifying and reporting 385 1 35.13.3. construction site waste violations? 3 No projects requiring Phase II Did Sawmills track the number of permitting low -density and high -density plan were submited 406 1 36 reviews performed? YES to the Town If so, how many low density 407 1 36 project reviews were performed? 0 If so, how many high density 408 1 36 project reviews were performed? 0 If so, how many low density 409 1 36 project reviews were approved? 0 If so, how many high density 410 1 36 project reviews were approved? 0 Did Sawmills maintain a current inventory of low -density projects and constructed SCMs, including SCM type or low -density acreage, location, last inspection date and type of enforcement action (if 431 1 36 any)? YES No SCMs are How many high density non- present in the municipally owned SCM Town of 436 1 36 inspections were performed? 0 Sawmills The town only has only issued a single low density permit which was How many low -density inspections several years 441 1 36 were performed? 1 ago How many post -construction 446 1 36 enforcement actions were issued? 0 Did Sawmills train field and office staff in Stormwater Ordinance procedures and enforcement 451 1 38.13.1. actions? YES How many staff were trained in Stormwater Ordinance procedures 452 1 38.13.1. and enforcement actions? 5 No post construction projects were approved How many post -construction during this 461 1 38.13.2. notices of violation were issued? 0 permit period How many post -construction Civil 462 1 38.13.2. Citations were issued? 0 How many post -construction violations are still in process of 463 1 38.13.2. abatement? 0 Did Sawmills review post - construction procedures and documents and update as 476 1 39.13.1. needed? YES No SCMS have been permitted in How many pre -CO SCM Sawmills at 481 1 42.B.1. inspections were completed? 0 this time How many repeat pre -CO SCM 482 1 42.B.1. inspections were completed? 0 How many permitted projects with 0&M Plans received their 483 1 40.B.1. CO? 0 How many SCM inspections were 484 1 42.13.2. completed by municipal staff? 0 How many SCM inspections performed by municipal staff were 485 1 42.13.2. failed? 0 How many qualified licensed professional SCM inspections completed with documentation 486 1 42.13.3. received? 0 How many SCMs are under annual 487 1 42.13.3. inspection enforcement? 0 Did Sawmills conduct inspections of 20% of low -density projects this 488 1 42.13.4. year? YES Educational materials have been created, but with a lack of Did Sawmills provide educational developments materials about low density distribution developments during the issuance was not of zoning permits, distributed applicable through mailings, posted on social during this 521 1 43.13.3. media, and handed out at events? PARTIAL permit cycle. How many low density educational materials were 522 1 43.13.3. distributed? 0 Educational materials have been created, but with a lack Did Sawmills provide educational of materials to developers about developments high density development during distribution the issuance of zoning permits, was not distributed through mailings, applicable posted on social media, and during this 531 1 44.13.2. handed out at events? PARTIAL permit cycle. How many high density educational materials were 532 1 44.13.2. distributed? 0 Did Sawmills establish/maintain links to all post -construction ordinances, manuals, policies, checklists, design standards, and/or other materials on the 541 1 44.13.3. website? YES Did Sawmills maintain a Pet Waste 546 1 45.13.1. Ordinance? YES Did Sawmills implement and 547 1 45.13.1. enforce the Pet Waste Ordinance? YES Did Sawmills develop educational awareness materials on fecal coliform pollution associated with 556 1 45.13.2. maintenance of septic systems? No How many educational awareness materials on fecal coliform pollution associated with maintenance of septic systems 557 1 45.13.2. were distributed? 0 How many municipal facilities 562 1 46.13.2. have O&M Plans? 1 Did Sawmills verify the municipal 563 1 47.13.1. facility list is complete? YES How many municipal facilities were identified to have stormwater pollution potential / 564 1 47.13.2. spill risk? 1 How many municipal facilities were inspected to ensure good housekeeping / spill prevention and control measures are 565 1 47.13.3. implemented? 3 How many municipal facilities Minor erosion implemented corrective action(s) and drain 570 1 47.13.4. following inspection? 1 repairs Did Sawmills develop a written Included in spill response procedure plan for municipal 575 1 48.13.1 each facility that requires one? YES plans How many municipal facilities implemented spill response 576 1 48.13.2. procedure plans? 1 How many non -reportable spills were documented according to 585 1 48.13.5. the spill response SOP? 0 How many reportable spills were documented according to the spill 586 1 48.13.5. response SOP? 0 Did Sawmills develop an MS4 O&M Plan to define required procedures, inspections, schedules, documentation, and MS4 maintenance and 595 1 49.13.1. evaluations? YES Submitted When did Sawmills submit the alongside IDDE 596 1 49.13.2. MS4 O&M Plan to DEQ? ##### plan template Staff training still needs to Did Sawmills provide be done for comprehensive stormwater some Town of training to municipal staff and Sawmills Public 605 1 50.13.1. contractors? PARTIAL Works Staff How many comprehensive stormwater training sessions were 606 1 50.13.1. held? 1 How many municipal and contractor staff received comprehensive stormwater 607 1 50.B.1. training? 5 Did Sawmills inspect the MS4 616 1 51.13.1. infrastructure? YES How many MS4 catch basins were 617 1 51.13.1. inspected? 11 How many MS4 conveyances were 618 1 51.13.1. inspected? 11 How many MS4 issues were 619 1 51.13.1. documented? 0 How many MS4 cleanings/maintenance actions 636 1 52.13.2. were performed? 16 Did Sawmills maintain an inventory of municipally -owned Sawmills does SCMs with information including not own any type, year built, date of last municipal inspection and maintenance SCMs at the 641 1 53.13.1. actions? YES time of report How many municipally -owned 642 1 53.13.1. SCMs are in the inventory? 0 O&Ms will be Did Sawmills develop/maintain a put in place if SCM Operation and Maintenance any municipal Plan for each muncipally-owned SCMs are 643 1 53.13.2. SCM? YES constructed Sawmills does not own any municipal How many municipally -owned SCMs at the 656 1 54.13.3. SCM inspections were performed? 0 time of report How many municipally -owned 661 1 54.13.4. SCMs had documented 0 deficiencies/required maintenance? How many municipally -owned SCM corrective actions/repairs 662 1 54.13.4. were performed? 0 Did Sawmills ensure that only certified landscapers/applicators are applying pesticides, herbicides 671 1 56.13.1. and fertilizers? YES How many certified landscapers/applicators are applying pesticides, herbicides and 672 1 56.13.1. fertilizers? 4 Did Sawmills establish standard operating procedures for vehicle 681 1 57.13.1. and equipment washing? YES Did Sawmills implement standard operating procedures for vehicle 682 1 57.13.3. and equipment washing? YES Did Sawmills ensure all municipal facilities have appropriate industrial stormwater permit 687 1 58.13.1. coverage? PARTIAL How many municipal facilities have industrial stormwater permit 688 1 58.13.1. coverage? 0 Did Sawmills perform annual municipal street/curb and gutter 689 1 59.13.1. sweeping? NO 690 1 59.13.1. How many lane miles were swept? Did Sawmills track conveyances/infrastructure that have frequent problems with pollution to prioritize their 691 1 59.13.2. maintenance? NO Did Sawmills distribute educational flyers regarding street 704 1 59.13.3. runoff pollution? YES How many educational flyers regarding street ruoff pollution 705 1 59.13.3. were distributed? 30 Did Sawmills service public waste 714 1 60.B.1. receptacles? YES How many trash bags were 715 1 60.B.1. used/collected? 120 Did Sawmills collect litter on an as- 724 1 60.13.2. needed basis? YES How much trash was collected 725 1 60.13.2. (pounds)? 4,080 Did Sawmills perform bagged leaf 734 1 61.13.1. collections? NO How many bags of leaves were 735 1 61.13.1. collected? Did Sawmills train first responders on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 744 1 62.13.1. accident? NO How many first responders were trained on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 745 1 62.13.1. accident? Did Sawmills equip and maintain spill kits in first responder 754 1 62.13.2. vehicles? NO How many first responder spill kits 755 1 62.13.2. were maintained / refilled? How many public education materials about vehicle leaks / pollution potential were 764 1 62.13.3. distributed? 0 Did Sawmills enforce significant No signifigant vehicle leaks from parked cars vehicle leaks 769 1 62.13.4. under the IDDE ordinance? NO were reported How many enforcement actions were issued for significant vehicle 770 1 62.13.4. leaks from parked cars? 0