Loading...
HomeMy WebLinkAboutWQ0035280_Application (FTSE)_20110316I ` AECOM AECOM 701 Corporate Center Drtve, Suite 475, Raleigh, NC 27607 T +919.854.6200 F +919.854.6259 www.aecom.com March 16, 2011 Mr. Tom Edgerton North Carolina Department of Environment and Natural Resources Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 Subject: Fast -Track Application for Gravity Sewers, Pump Stations and Force Mains Radar Approach Control (RAPCON) Complex Wayne County, North Carolina AECOM Project No. 60163916 Dear Mr. Edgerton: Please find enclosed one (1) original plus one (1) copy of the "Fast -Track Application for Gravity Sewers, Pump Stations and Force Mains", along with a color section of the SE`' Goldsboro, N.C. 7.5 minute quadrangle map, Form FTSE 10/07, a project description and a check for the amount of $480 for the application fee for the referenced project. Please review the submitted materials at your earliest convenience. Upon approval, please send us a copy of the approval document for our files. If you have any questions or require further information, please do not hesitate to call. Very truly yours, AECOM Technical Services of North Carolina, Inc. Ef6. Beth Steffens, P.E. Enclosures cc: Sean Gleason, P.E. Project file Water \NA State of North Carolina QC. Department of Environment and Natural Resources Division of Water Quality y_w� -mac FAST -TRACK APPLICATION (F1'A 12/07 ver5) for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS (Pressure & Vacuum sewer systems are not to be included es part of this application package) INSTRUCTIONS: Indicate that you have Included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. Forms am available from the web site or by calling the Regional Office serving your county: http://h2o.enr.state.nc.us perrslCollek ion%20Systems collectionSystemApplications.html ® A. Application Form - Submit one original and one copy of the completed and appropriately executed application form. The application should indude a project narrative describing the final build -out design (1.e. system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, dearly explain the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project Information that has already been included in the original permit. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable Items addressed. You do not Reed to submit detailed plans and specifications unless you respond NO to Item B(13). Separate applications should be made for non-contiguous sewer systems. ® B. Application Fee - Submit a check in the amount of $480 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. El C. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility Is authorized to hold the ditty franchise for the area to be served by the sewer extension. If a CPCN has not been Issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area Is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name In the CPCN or letter must match that provided in Item A(2)a of this application. ❑ D. Operation I Agreements — Submit one original and two copies of a properly executed operational agreement, as per 15A NCCAC 02T .0115, if the application is submitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, toymhomes,_outpercels, etc.)_that will be sold to another entity.. tf the applicant is a home or property owner's association, use Form HOA 02/03. If the applicant is a developer, use Forth DEV 02/03. EVEN IF THE PROJECT MAY BE TURNED OVER TO A MUNICIPALITY UPON COMPLETION, FORM DEV 02/03 IS REQUIRED. ® E. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance — FORM FTSE 10/07 (Flow Tracking/Acceptance for Sewer Extension Permit Applications) Is required with every application. The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting FORM FTSE-10/07) certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this protect will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant Where the applicant is not the owner of the downstream sewer, submit two copies of FORM FTSE 10/07 from the owner of the downstream sewer and owner of the WWTF, If different. The flow acceptance Indicated in FORM FTSE-10/07 must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and FORM FTSE-10/07 Indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). Intergovernmental agreements or other contracts will not be accepted in lieu of project -specific FTSE 10/07. F Map — Submit an 8.5-Inch by 11-Inch COLOR copy of a USGS Topographic Map of sufficient scale to identify the entire project area and the closest surface waters. Each map or maps must show the location of the sewer line and pump stations and be of reproducible quality. Include a street level map showing the downstream connection point, and the permit number for the downstream sewer, if known. FTA12/07 ❑ G. Stream Classifications — Watershed Classification Attachment (Form WSCAS-12/07) If any portion of the sewer system project is within 100 feet of any surface water or wetlands, the Watershed Classification Attachment may need to be completed. A variance must be requested for encroachment within required setbacks or buffers pursuant to 2T .0305 (f) and be indicated in Item B-13 with supporting documentation/justification provided. ❑ H Environmental Assessments — If thls project Is subject to an Environmental Assessment (EA) [16A NCAC 01C], this application cannot be used. Send the project application on the most current version of Form PSFMGSA to the Design Management Unit, 1633 Mail Service Center, Raleigh, NC 27699-1633. Applications cannot be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. 0 I. Flow. Direction — Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with this project, please indicate in B(12) and give the permit number of the second treatment facility. ® J. Certifications — Section C The application must be certified by both the applicant and the design engineer who Is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. THE COMPLETED FTA 12/07 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $480 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778 (828) 296-4500 (828) 299-7043 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5094 (910) 433-3300 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Mooresville Regional Office 610 E. Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabamus,,Catawba, Cleveland, Gaston, Iredell Linboln, Mecklenburg, Rowan, Stanly, Union Ralelgh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 791-4200 (919) 788-7159 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 798-7215 (910) 350-2004 Fax • Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 (336) 771-5000 (336) 771-4630 Fax Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Gultford, Rockingham, Randolph, Stokes, Surry, Watauga, Wiles, Yadkin For more Information, please visit our web site at htipJ/h2o.enr.state.nc. us/pems/Collectlon%20Systems/CollectlonSystemsHome.hbnl or contact the Regional Office serving your county. FTA12J07 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: `� C;) co V Z- S 0 (to be completed by DWQ) 1. OwneNPemlittee: la. Seymour Johnson Air Force Base MC E[D Full Legal Name (company, municipality, HOA, utility, etc.) (� E Z 11b. Mr. Dennis Goodson, P.E., Deputy Base Civil Engineer Signing Official Name and Title Q 1a The legal e i who will own this (Please system review 15A NCAC 2T .0106 (b) for authorized is: �p� ?Lill signing offit l) 17 � �l�tittu ,'=OI !.•r (- Johnson AFB a • Individual ►� Federal ■ Municipality ■ State/County ■ Private Partnership ■ Corpo Et O '1d. 1095 Peterson Ave. le. Seymour LL Mailing Address City Z in. NC ;lg. 27531 Z State• Zip Code 1h. 919.722.5142 .11. 1j. Telephone Facsimile Complex 2b. E-mail Q V 12. Protect (Facility) Information; J ,2a. Radar Approach Control (RAPCON) Wayne dBrief Project Name (permit will refer to this name) County Where Project Is Located Q 13. contact Person; 3a. Beth Steffens, P.E. <• Name and Affiliation of Someone 3b. 919-256-5311 Who Can Answer Questions About this Application 3c. beth.steffens@aecom.com ' Phone Number E-mail 11. Project is 0 New ■ Modification (of an existing permit) If Modification, Permit No.: 8(3)) (go to Item 2(a)) 2. Owner is 0 Public (slip to Item • Private 2a. If private, applicant will be: 2b. church, single office, etc.) or , etc. - skip to item B(3)) etc. -go to Item B(2b)) If sold, facilities owned by a (must choose one) (Instruction C) Assoc./Developer (Instruction D) • Retaining Ownership (i.e. store, I Public Utility • Leasing units (lots, townhomes, • Homeowner • Selling units (lots, townhomes, 3. City of Goldsboro �, Z Owner of Was tewater_lreatment Facility (VWVTF) Treating Wastewater From This Project 0 4a. Goldsboro WNr 4b. NC 0023949 I— Name of WWTF - - - - - UWVTF Permit No. - - - •- +gg` 5a. Seymour Johnson AFB b. $° Gravity Force Main (Stores, shopping Home (specify): 5a Owner of Downstream Sewer tecelving (check Sewer Size all that apply)_ Permit # of centers) Downstream Sewer (Instruction E) 100 % Domest 1Commerciai LL 6. The origin of this wastewater is Z I,,,,, , • Residential Subdivision ■ Retail % Industrial (attach ■ Apartments/Condominiums 2 • ■ Mobile Home Park ■ Institution ■ Hospital description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): ■ School • Church a• Restaurant • Nursing 0Office m • Other or Permitted for this particular allocations will be permitted project: 2750 gallons per day Volume of wastewater to be allocated ,7. 'Do not include future flows 8. If the permirir flow Is zero, indicate or previously why. In of existing permitted Line where flow Permit No. in subsequent permits that connect to this line NCAC 02T .0303 to determine if a • Pump Station, Outfall or Interceptor • Flow has already been allocated ■ Rehabilitation or replacement permit is required) sewer with no new flow expected (see 15A FTA12/07 B..PERMIT INFORMATION (CONTINUED) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance wtth 15A NCAC 2T .0114 for the value in Item B(7) mom the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data In accordance with 15A NCAC 2T .0114 (f). General Business and office facilities: 55 employees, 2 shift, 25 gal/employee/shift = 2750 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (Inches) Length (feet) t) New Gravity or Additional Force Main ll Ott N(O on l. R2rrv� 6 TS f'-'14' c S V6111` l-a.! 3114 r 1 alilffiliiiiima 8 391 Gravity 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow (MOD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator g 2 - portable generator w/MTS , Force Main Size Force Main Length Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Power Reliability Option lI (MGD) OperationalPI M @TDH � 1 - permanent generator w/ATS; 1 2 - portable generator wANTS 1 Force Main Slze j Force Main Length i Pump StationCocation lb - - -z - - - --(se-If chosen :as shown on'plans i/`nap for reference) Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 1 - permanent generatorw/ATS; ` 2 - portable generator w/MTS Force Main Sine Force Main Length I. 12. VAII the wastewater flow In the proposed sewer lines or pump stations be able to be directed to another treatment facility? ■ Yes 0 No If Yes, permit number of 2nd treatment facility (RO - If `yes' to 6,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply wtth the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? 0 Yes • No if No, please reference the pertinent minimum design criteria or regulation and Indicate why a variance Is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA12/07 14. Have the following pemiits/certlfications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? Sedimentation and Erosion Control Plan? Stormwater? ❑ Yes ❑ No ® Yes ❑ No ® Yes ❑ No ® N/A ❑ N/A ❑ N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These Tines will be considered high priority and must be checked once every six months Check tf Yes: ❑ and provide details I . O+wner/Permittee's Certification: (Signature of Signing Official and Protect Name) 1 a. 1, Mr. Dennis Goodson. PE, attest that this application for RAPCON Complex has been reviewed by me and Is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments am not Included, this application package is subject to being returned as incomplete. Note: In accordance with North CamOna General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as.civil penalties up to $25, 000 per violation. I ,e' Signing Official Signature Date 4 /1 NGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS PLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY 0 OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 Professional Engineers Certification: (signature of Design Engineer and Project Name) 1, Elizabeth 5 Steffens, P.E. , attest that this application for RAPCON Complex has been reviewed by me and Is accurate, complete and consistent with the Information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted Februa►r12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed Certain portions of this submittal package, inclusion of these -materials under my signature and seal signifies that I have reviewed this material and have Judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement representation, or certification in any application shall be guilty of a Class 2 misdemeanor vthlch may include a fine not to exceed $10, 000 as well as civil penalties up to $25,000 per violation. rti 11I/I/ a. Elizabeth B. Steffens, PE Professional Engineer Name AECOM Technical Services of NC, Inc. Engineering Firm 2c. 701 Corporate Center Drive, Suite 475 Mailing Address 2d. Raleigh 2e. NC 2f. 27607 City State I Zip 2g. (919) 256-6311 12h. 919-854-625.9 12i. beth.steffensfgaecom.com Telephone I Facsimile ( E-mail �\ H CAR // \\ 1 41L's S o9C'4 SEAL I-: 3098 • $','ii NC PE Seal, Signature & Date FTA12/07 W ATF9 State of North Carolina �pG Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Seymour Johnson Air Force Base Project Name for which flow is being requested: RAPCON Complex More than one P 1 SE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Goldsboro Water Reclamation Facility b. WWTP Facility Permit #: NC0023949 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 14.2 0.2596 8.35 0.00275 8.61235 60.65% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD Westbrook Road PS 18.0 8.35 III. Certification Statement: I, Tasha D. Logan , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed abo a in Sections I and II for which I am the responsible party. Signature of this form indicates accepts of wastew e o 71Z 3 8 ,r Date Signing Official Si 1 SCALE 1:24,000 0 !MILE 1029 - ..Q 10Q0 20Q0 3090 4090 5090 6O90 lopo FEET 9 SOURCE: USGS Topographic Maps, Southeast Goldsboro NC Quad, 2010 IKLOMETER 1 AECOM FIGURE I TOPO MAP RADAR APPROACH CONTROL (RAPCON) COMPLEX WAYNE COUNTY, NORTH CAROLINA DECEMBER 2010 PROJECT DESCRIPTION SEWER SERVICES RADAR CONTROL APPROACH (RAPCON) COMPLEX SEYMOUR JOHNSON AIR FORCE BASE, NC December 22, 2010 By: Beth Steffens, P.E. AECOM Technical Services of North Carolina, Inc. 701 Corporate Center Drive, Suite 475 Raleigh, N.C. 27607 AECOM Project No. 60163916 The average daily flow from the proposed RAPCON building is estimated to be 2,750 gallons per day (gpd). The daily flow is based on 55 personnel per shift (2 shifts total) with each employee contributing 25 gpd. The daily flow rates are in accordance with Section 15A NCAC 02T .0114 of the North Carolina's Division of Water Quality's regulations. PROJECT DESCRIPTION SEWER SERVICES SEYMOUR JOHNSON AIR FORCE BASE RADAR CONTROL APPROACH (RAPCON) COMPLEX Seymour Johnson Air Force Base (AFB) proposes to extend their sewer collection system to provide sewer services to the proposed Radar Control Approach (RAPCON) Complex. The proposed facility is located in the southwest corner of intersection of Jabara Street and Humphreys Street. The project will consist of the installation of approximately 391 feet of 8- inch sewer mains and 65 feet of 4-inch sewer service. Dr. l y pibt- by 'v.1Q 4-0,4 311-,Iti The existing 8-inch gravity sewer main is located approximately 60 feet west of the project site, flows east to west, and crosses Humphreys Street. The proposed RAPCON sewer service will tie into a new sewer manhole that is located approximately 100 feet east of the edge of the road. Approximately 65 feet of 4-inch gravity sewer service will be installed from the new manhole to the western edge of the proposed building. Currently the 8-inch sewer main servicing Building 4601 immediately east of the lies under the proposed RAPCON building site; therefore, the sewer servicing Building 4601 will be rerouted. A new 8-inch sewer main will be installed to replace the existing 8-inch sewer main servicing Building 4601. The new sewer main will discharge into the existing 8-inch gravity sewer main via the new manhole 100 feet east of the edge of Humphrey's Street. There is no additional flow or new service connections associated with the rerouting and replacement of the 8-inch sewer main servicing Building 4601. The proposed sewer will be constructed of SDR 35 PVC and ductile iron, and be laid at a slope of 0.4%. Three precast concrete manholes will be installed. Between Manhole No. 2 and 3, the sewer main must cross over existing storm drainage pipes. The sewer has been designed to go over the drainage pipes with a minimum separation of 18 inches, in accordance with 15A NCAC 02T .0305(f) of the North Carolina's Division of Water Quality's regulations. A note has been added to the plans requiring the Contractor to field verify the location and depth of the storm drainage pipes prior to ordering manholes and beginning construction. If the minimum separation of 18 inches cannot be provided, then the Contractor shall contact the Engineer and the depths of the sewer mains shall be adjusted.