HomeMy WebLinkAboutNCC223428_ESC Approval Submitted_20221004ROY COOPER 5TA7� "3'µ^ 4 >, Governorft ELIZABETH S. BISER 1 Secretary � t BRIAN WRENN Director o�`su rh,•:'� September 22, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Davidson County Airport Authority Attention: Mr. Rick Phillips P.O. Box 1067 Lexington, NC 27292 RE: Project Name: DAVIDSON COUNTY AIRPORT AUTHORITY -SKY AVIATION HANGAR SITE Project ID: DAVID-2023-009 Acres Approved: 5.69 County: Davidson City: Lexington Address: Aviation Way River Basin: Yadkin Pee -Dee Stream Classification: Swearing Creek — Class C Submitted By: Davis -Martin -Powell Engineers & Surveyors — Mr. Ben Palmer, PE Date Received by LQS: August 30, 2022 Plan Type: Hangar Addition Dear Mr. Phillips: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNO1 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Qaality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-9800 ' �r�'rii.NrrwlUalO..r'rr� �~ Letter of Approval with Modifications Davidson County Airport Authority September 22, 2022 Page 2 of 3 Title 15A NCAC 413 .011 S(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Fred Walker, PE Engineer III Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval ec: Mr. Ben Palmer, PE (bpalmer@dmp-inc.com) Letter of Approval with Modifications Davidson County Airport Authority September 22, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: DAVIDSON COUNTY AIRPORT AUTHORITY -SKY AVIATION HANGAR SITE Project ID: DAVID-2023-009 County: Davidson Modifications pursuant to applicable North Carolina General Statutes and/or Regulations; 1. Include all E&SC measures and land disturbing activities within the Limits of Disturbance (LOD). An outlet protection pad is located outside of the LOD. [G.S. 113A-57.(4)] 2. Provide stabilized inlets into the sediment basin for each inlet. Stone pad should extend into basin floor. [G.S. 113A-57.(3)] 3. Geotechnical engineer stamp or sign off for wall design over 4 ft., check with county building permitting to verify any county requirements. [G.S. 113A-57.(4)] 4. If discharging onto slope 5% or greater increase stone apron length and width and potentially stone size to account for discharge onto grade (Tables 8.06 a&b assume discharges onto flat ground per drawing detail). [15A NCAC 04B .0108] 5. Revise the construction sequence to include the following language: no major grading activities or basin construction are to take place during wet weather or periods of predicted wet weather i.e. Hurricanes; notify NCDEQ LQS inspector when project is ready for a close out inspection; file for NPDES NCGO10000 e-Notice of Termination when final close out inspection report is received from NCDEQ LQS; install inlet protection by the end of the workday for all constructed SW inlets; sediment basin and trap embankments shall be provided with adequate groundcover immediately upon construction; after the drainage areas to the basins and traps have been permanently stabilized, dewater the basins. Fill the basins using stockpiled soil and bring to finish grade in compacted lifts. Smooth the basin sites to blend with the surrounding area, ensuring the basin sites will not pond water, and immediately permanently stabilize; dewatering operations must be discharged into adequate stilling basin or comparable measure to prevent the discharge of sediment; site must be "storm ready" before any extended breaks in construction activities including weekends. [15A NCAC 04B .0106(a)(2)] 6. Hatch all areas on the plan required to meet 7-day stabilization requirement in NPDES NCGO10000. [NPDES NCGO10000] 7. Remove S. lespedeza from seeding lists. [G.S. I I3A-57.(3)] 8. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities nolz w n AD w-� CD O `�' � GZ. O CfQ CD ow as ► N ow P* ( + CD • CD cC Cp n ram+ H CD N CD M f-- H y o CD CD r4 CD REAT s� O n r°-+CD n � �• °� J J ¢ Y n .� CDCD CD ¢: Cf4 11 C O Frr� CD CD CD ^ CD L � , ¢ CD ° 0 � � 9 UG • O 10 a, A� ' $ ro a. CD CD