Loading...
HomeMy WebLinkAboutWQCS00054_NOV-2022-DV-0264 Response_20220923Union County Water UNIQN COUNTY WATER E R September 23, 2022 Mr. Andrew H. Pitner, P.G., Assistant Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 500 North Main Street Suite # 600 Monroe, NC 28112 T. 704-296-4210 Subject: Notice of Violation Tracking #: NOV-2022-DV-0264 Sanitary Sewer Overflows — August 2022 Collection System Permit — WQCS00054 Union County Water Dear Mr. Pitner: Union County Water has received the NOV referenced above for collection system overflows. Explanations of the overflows were on the BIMS Overflow Reporting Forms submitted by Union County Water to the NCDEQ. However, we have added a few additional facts in the explanations below. Incident # Date Location 202201343 8/23/2022 2017 Stallings Road The SSO listed in this section was due to rag accumulation that backed up the sewer main at a manhole. Staff responded within 30 minutes of the call and began to jet the sewer main. Once SSO was resolved, our staff including our system protection team, inspected all upstream sources. Inspections of all motels in the area are being conducted as a high priority and businesses are being educated accordingly. The spill site was cleaned and flow restored to normal operations. Union County Water also has an aggressive Capital Improvement Program throughout the next 5 years. The projects include: *- Crooked Creek Basin Improvements - $47,000,000 ➢ Waxhaw Interceptor —$6,300,000 (Project is in active construction) ➢ WW PS Improvements - $5,800,000 Union County Water's current CIP projects are also ongoing with projects including: Y Forest Park PS Replacement & Interceptor Improvements —Phase 1- $3,900,000 y Crooked Creek I&I Study & Remediation - $633,000 Union County Water continues to invest funds into SSES work, capital improvements, maintenance, FOG, and operations to improve the wastewater collection system. If further information or details regarding the CCWRF Improvements, as well as, the CIP projects listed above are required, please feel free to contact Greg Morgan, Superintendent/ORC, at 704-289- 3288 or myself at 704-296-4215. Thank you for your consideration on this issue. Sincerely, 4„4.4 Andrew Neff, PE Water/Wastewater Division Director cc: Hyong Yi, Public Works Administrator Josh Brooks, Assistant Director, Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/OR