Loading...
HomeMy WebLinkAboutGW1-2022-09096_Well Construction - GW1_20220906 WELL CONSTRUCTION RECORD For Imerna►Use ONLY: This form can be used for single or multiple wells GI 1.Well Contractor Information: Billy Kennedy 1RwATERZONEs FROM TO DESCRIPTION Well Contractor Name ft es—rt ,,, 2834-A " ft, NC Well Contractor Certification Number 15.Ob1'ER CASING for multi-cased we11s OR LINER if a livable FROM TO DIAMETER THICKNESS MATERIAL Kennedy Well Drilling 0 rL rt 6.25 In SDR-21 PVC Company Name ^ tt 16.INNER CASING OR TUBING eothermal closed-too FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: 02—(,t//�DD N��`` - ft. ft. in. List all applicable wellpermits(i.e.County,State,Variance,Injection,etc.) fL ft. in. 3.Well Use(check well use): 17.'SCREEN Water Supply Well: FROM TO DIAMETER SLOT SITE THICKNESS MATERLAL fG ft. IM ❑Agricultural ❑Municipal/Public ft. ft. In. ❑Geothermal(Heating/Cooling Supply) 21te'sidential Water Supply(single) ❑Industrial/Commercial ❑Residential Water Supply(shared) 19.GROUT FROM I TO MATERUAL EMPLACEMENT METHOD&AMOUNT DItrigation 0 ft. 20+ fL. Bentonite Hydrate chips in place Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ft. fL ❑Aquifer Recharge []Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier It. ft. ❑Aquifer Test ❑Stormwater Drainage ft. ft ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG fattach additional sheets if necessary) ❑Geothermal(Closed Loop) ❑Tracer FROM I TO DESCRIPTION color,hardness,wittreck type,grain size etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks ft• ft• rL as� rL h 4.Date Well(s)Completed: :2co_aa Well ID# tt ft /b n 5aa..Well Location: ft fL _ ft. ft Facility/Owner Na4 Facility ID#(if applicable) ft. 7-610 Q"e r G/e4k fL it. "7 Physical Address,City,and Zip 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one lat/long is sufficient) N W �. � -9 & i h Certified Well Contractor Date 6.Is(are)the well(s): ermanent or ❑Temporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or affo copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 1 You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can SUBMITTAL INSTUCTIONS submit one form. 9.Total well depth below land surface: 117J (ft.) 24a. For Ali Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdderent(example-3@200'and 2@100) construction to the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing,use"+ 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b.For Infection Wells ONLY: In addition to sending the form to the address in rota 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: rotary construction to the following: (Le.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 Air 24c.For Water Supply&Injection Wells: 13a.Yield(gpm) Method of test: Also submit one copy of this fom'within 30 days of completion of 13b.Disinfection type: granular hypocholdte Amount: well construction to the county Health department of the county where f�ff� constructed. Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013