HomeMy WebLinkAbout20061245 Ver 4_DCM Permit_20140825Permit Class
TRANSFER
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
�, Imo" � "i �� � .,
X Major Development in an Area of En
pursuant to NCGS 113A -118
Permit Number
126-09
Excavation and/or filling pursuant to NCGS 113 -229
Issued to Yeopim Partners, LLC., 19421-A Liverpool Parkway, Cornelius, NC 28031
Authorizing development in Chowan County at adj. to the Yeol2im River, off of Drummond's
Point Rd. Riversound Subdivision as requested in the permittee's application dated revised 4/18/09, including
the attached drawings (4), 1 dated 4/29/09 and 2 dated revised 2/23/09, and I dated revised 5/5/09
This permit, issued on August 20, 2014 , is subject to compliance with the application (where consistent
with the pen-nit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) In accordance with commitments made by the authorized agent in an email dated 8/25/09 the no wake
buoys are hereby removed from this project. Any references to the no wake buoys in the attached
permit application are hereby null and void.
Marina
2) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal
facility shall be installed in an easily accessible location. The pumpout facility shall be operable and
maintained for the life of the marina.
3) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on-site with a
representative of the Division of Coastal Management to ensure that the required pumpout facility is in
place and operable.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
April 11, 2015
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Braxton'C= ',bavis, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the
permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence
of the permitted structure.
6) Unless specifically altered. herein, this permit authorizes only the docks, piers, and other structures and
uses located in or over the water that are expressly and specifically set forth in. the permit application.
No other structure, whether floating or stationary, shall become a permanent part of this marina facility
without permit modification. No non-water dependent uses of structures may be conducted on, in or
over public trust waters without permit modification.
7) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft.
and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the
decking.
8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
9) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
10) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
that may be caused from existing or future operations undertaken by the United States in the public
interest.
11) This permit authorizes a maximum of 130 formalized docking spaces.
12) Should lots 439, 440, 464, or 465 be sold to the initation of construction, the permittee shall be required
to obtain a signed riparian corridor waiver from the new property owners prior to the placement of any
structure within the 15 foot riparian corridor,
Yeopini Partners, LLC.
I'll, f I I
Im"FAIUMMUM,
13) The permittee may be required to apply for a submerged land lease from the Department of
Administration's State Property Office. Contact the Department of Administration's State Property
Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is
required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of
the Easement.
LR!And Develop ent
15)
z
Sedimentation and Erosion Control
Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion
within thirty days of project completion.
NOTE: A modified Erosion and Sedimentation Control Plan shall be required for this project. This plan
shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity.
Submit this plan to the Department of Environment and Natural Resources, Land Quality
Section, 943 Washington Square Mall, Washington, NC 27889.
A, 1*1111 1 04, MI-RUM,
17) The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of Stormwater Permit No. SW7080105
MOD. Any violation of the pen-nit approved by the DWQ will be considered a violation of this CAMA
permit.
Yeopim Partners, LLC,
ADDITIONAL CONDITIONS
Permit # 126-09
Page 4 of 5
20) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed
restrictions shall be place on waterfront lots within the Riversound Subdivision prohibiting shoreline
stabilization. This deed restrictions shall be recorded with the Chowan County Register of Deeds, and
copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of
any development activities authorized by this permit.
� K
22) No Coastal Wetlands shall be excavated or filled, even temporarily,
23) Any mitigative measures or environmental commitments specifically made by the applicant in the
Environmental Assessment for this project should be implemented, regardless of whether or not such
commitments are addressed by individual conditions of this permit.
24) The permittee and/or his contractor shall meet with a representative of the Division prior to project
initiation in order to discuss the conditions set forth in this pen-nit,