HomeMy WebLinkAboutSW1220301_Supplement-EZ Form (Cover Page)_20220610"ll nPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION _
1 Project Name �.-
2 Project Area (ac)
3 Coastal Wetland Area (ac)
4 Surface Water Area (ac)
5 Is this project High or Low Density?
6 Does this project use an off -site SCM?
Terminal Expansion Project -contractor Staging Area
1.85
-O -
-0
High
- No
,OMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
N/A
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
N/A
10
Is streambank stabilization proposed on this project?
No
VUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
1
13
Wet Pond
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond
23
Storm Filter
24
Silva Cell
25
113ayfilter
26
IFilterra
FORMS LOADED
)ESIGNER CERTIFICATION
27 Name and Title:
29 Street address:
30 City, State, Zip:
31 Phone number(
32 Email:
Dave Skurky, Chief Stormwater f
Aulick Engineering, LLC
600 Park Offices Dr.
Durham, INC, 27709
919-819-4242
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
\��p11111111I11/Iq
NGINE`�`
.............
� ....,�
Seal
�S
Signa ure of Designer
uate
31Tlzt