Loading...
HomeMy WebLinkAboutRE_ _External_ Project BR-0102 Stokes County Start of Study Notification Wanucha, Dave From:McHenry, David G Sent:Friday, September 23, 2022 12:05 PM To:Dagenhart, Daniel R; Joanna Salvucci Cc:Euliss, Amy; Wanucha, Dave; andrew.e.williams@usace.army.mil; Wilson, Lauren B Subject:RE: \[External\] Project BR-0102 Stokes County Start of Study Notification Attachments:BR-0102_84037_Stokes_NCWRC comments.pdf Mr. Dagenhart and Ms. Salvucci, Please accept the attached comments. Thanks for the advisement and opportunity to offer comment. The NCWRC looks forward to future assistance with the project. Dave McHenry NCWRC Western DOT Coordinator 828-476-1966 From: Joanna Salvucci <joanna.salvucci@threeoaksengineering.com> Sent: Monday, August 29, 2022 5:31 PM To: Shaver, Shannon B <sshaver@co.stokes.nc.us>; Sudderth, David <dsudderth@co.stokes.nc.us>; GENTRY, BRANDON <BGENTRY@CO.STOKES.NC.US>; Perkins, Andrew M <bot-amperkins@ncdot.gov>; Aaron, Scott <saaron@co.stokes.nc.us>; Lemons, Joseph M <jmlemons@co.stokes.nc.us>; Lemons, Joseph M <jmlemons@co.stokes.nc.us>; cspradling@ptrc.org; admin@townofdanbury1957.org; janet.whitt2014@gmail.com; cgdfivebridges@uscg.mil; Pitts, Hal R CIV USCG D5 (USA) <Hal.R.Pitts@uscg.mil>; McHenry, David G <david.mchenry@ncwildlife.org>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; andrew.e.williams@usace.army.mil; holland_youngman@fws.gov Cc: Dagenhart, Daniel R <drdagenhart@ncdot.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Brandon Johnson <brandon.johnson@summitde.net>; Karen Taylor <karen.taylor@threeoaksengineering.com> Subject: \[External\] Project BR-0102 Stokes County Start of Study Notification CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, On behalf of the NCDOT Division 9 Bridge Program Manager, Daniel Dagenhart, I am sending you the Start of Study notification letter for project BR-0102. This project proposes to replace Bridge No. 37 on NC 268 (Lynchburg Road) over Big Creek in Stokes County on new alignment, west of the existing bridge. ROW acquisition and construction are scheduled for 2023 and 2024, respectively. 1 Please refer to the attachment for the Start of Study letter, project maps, and project data sheet. We welcome your input. If you have any specific or time-critical concerns that the Department should be aware of, please respond by October 1, 2022. If you have any issues opening the attachments, please let me know. Thank you, Joanna Salvucci Environmental Planner Three Oaks Engineering (919) 867-6052 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2