Loading...
HomeMy WebLinkAboutGW1-2022-09028_Well Construction - GW1_20220923 WELL CONSTRUCTION RECORD (GW-1) For internal Use Only: 1.Wel Contractor Information: Z( 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION Vov I '--� :Well Contractor Certification Number rl F = /n 1n1 15.OUTER CASING for multi-cased wells OR LINER if a licable Cascade Drilling, LP SEP 202 FROM TO DIAMETER THICKNESS MATERIAL rt. ft- in. Company Name c 1{1r'Uf"rTv��"'1 ,iry° ,P�•::',J (�ili 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State. Variance,etc.) 44 3 ft. ft. ! in. 3.Well Use(check well use): ft. ft. in. tA Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS .MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in• ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. ft. 'in• ❑industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 43 ft- '> ft. 'ie.11 S-,-Vs 3 OJ5� p0mar';tl Monitoring ❑Recovery ft. ft. Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM To DESCRIPTION(color,hardness,soil rock e, rain size,etc. ft. ft. 4.Date Well(s)Completed: Well ID# 5a.Well Location: Duke Energy ility/Owner Name Facility iD#(if applicable) ft. ft. 306 Dunnaway Road, Semora, NC 27343 rt. tt. Physical Address,City,and Zip ft. ft. Gaston 21.REMARKS County Parcel identification No.(PiN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification' e N W 1-41 6.Is(are)the well(s)• ❑Permanent or '?gemporary Signature of Certified Well Contracto Date By signing this form.I herebv certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ONo 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,Jill out known well construction information and explain the nature oJ'the oJ'this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if d(/Jerent(example-3@200'and 2@100') i 24a. For All Wells: Original form to Division of Water Resources (DWR), (ft.) 10.Static water level below top of casing: Lz� Information Processing Unit, 16117 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 11.Borehole diameter: (in,) 24b. For injection Wells: Copy,to DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed t )R WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: I i 13b.Disinfection type: Amount: j. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resour ces Revised 6-6-2018 l