Loading...
HomeMy WebLinkAboutNCC223378_ESC Approval Submitted (3)_20220928PUBLIC WORKS CONDITIONS OF APPROVAL 1. The designing professional (a NCPE, NCPLS OR NCRLA - as required) shall submit three (3) sets of construction drawings to the Public Works Department - Development Review for review and approval. Construction drawing approval is required prior to commencing construction (see Construction Plan Approval Process). The approval of construction drawings is separate from site plan approval. City officials shall review all sizes, materials, slopes, locations, extensions and depths for all proposed utilities (waterlines, sanitary sewer lines and storm drainage conveyance systems) for compliance with all applicable regulatory standards, specifications and best management practices. 2. The designing professional (a NCPE, NCPLE or NCRLA - as required) shall submit one (1) set of as -built drawings to the Public Works Department - Development Review for review and approval. As -Built drawing approval is required prior to water meter installation and/or sanitary sewer service connection and prior to issuance of a certificate of occupancy. 3. Fire flow analysis required for review and approval as part of the construction drawing approval process. To schedule flow test or to obtain current system data, complete the online application (http://durhamnc.gov/ich/op/pwd/Pages/fire_flow.aspx) 4. If a meter 2" or larger is proposed, contact Water Management at 560-4381 prior to the construction of the meter vault to verify the type and dimensions of the meter. 5. Water permit required after construction drawing approval and prior to commencing water main installation. 6. Sewer permit required after construction drawing approval and prior to commencing sanitary sewer main installation. 7. An NCDOT or City of Durham Driveway Permit is required. 8. If Construction drawings are not required after site plan approval, provide the following notes instead of note 1 above: i. Provide two (2) sets of approved Site Plan documents to Engineering Inspections, 3rd floor, 101 City Hall Plaza, Durham, NC 27701 at least 5 days prior to beginning construction and contact Engineering Inspections at 919-560-4326 at least 48 hours prior to beginning construction. ii. A Construction on City Right-Of-Way/Private Property Permit may be required. Contact the Public works Customer Service Desk at 919-560-4326. iii. An encroachment agreement may be required. Contact Engineering Services at 919-560-4326. 10. At a minimum, the Stormwater design details for this project shall be governed by the minimum standards of the most recent edition of the city of Durham (City) Reference guide for development (RGD) and any letters to industry (posted on the city's web site) that are in effect the date construction drawings are first received for review by the city. 11. Final design calculations for the stormwater control measure(s) (SCM[s]) require the use of storage indication routing methodology such as TR-20 or HEC-1 models. For each SCM, as applicable, stage -storage relationship and inflow and outflow hydrographs are required. All tabulated data including calculations showing the limiting discharge, whether orifice, weir, barrel or outlet control as appropriate is required. HydroCad, Hydraflow, Hydrographs AND PondPack are commonly used and recognized software programs which incorporate routing methodology accepted by the city. 12. Stormwater control measure(s) (SCM[s]) permit fee(s), the executed stormwater facility agreement and covenants (prepared by the city of Durham stormwater development review section) and either a payment into the stormwater replacement fund or the provision of an alternate security are required for all SCM(s) associated with this development. Construction of the development is not allowed to commence until these items are provided in accordance with the terms and conditions outlined in the stormwater facility agreement and covenants or in accordance with written policy. the designer shall submit a sealed engineer's construction cost estimate for every SCM proposed in the development prior to approval of the construction drawings if a financial guarantee in the form of payment into the stormwater replacement fund is utilized. 13. An As -Built certification for the stormwater control measures (SCM[s]), provided b the BMP certifying engineer O( [ 1).p Y Y 9 9 (BCE), is required. The As -Built certification shall be submitted in accordance with the city of Durham BCE program, refer to section 8.6, BMP certifying engineer program for stormwater BMP's in the City of Durham, of the reference guide for development. the SCM As -Built certification(s) shall be approved by the stormwater development review section prior to issuance of any final certificates of occupancy/compliance for development, with the exception of when an appropriate construction security has been provided for single family or townhome development. with this provided construction security, certificates of occupancy/compliance can be issued for a percentage of single family lots in accordance with City requirements. 14. Stormwater control measure(s) (SCM[s]) design calculations will not be reviewed or approved with the site plan/preliminary plat submittal. All SCM designs will be reviewed and approved during the construction drawing submittal process. If, at the time of construction drawing submittal, it is found that the proposed SCM(s) is undersized, not properly accessible , or otherwise insufficient or unsuitable for the site, it is the responsibility of the applicant to insure that the applicable stormwater ordinance requirements are met. A revised site plan or preliminary plat may be required if the originally proposed SCM(s) are found insufficient, not properly accessible, or unsuitable and alternative SCM(s) with associated easements are required. 15. The developer/contractor shall schedule a pre -construction meeting with the stormwater development review section prior to commencing work on any stormwater control measure (SCM). If the SCM will be constructed initially as a sedimentation and erosion control (S&EC) device, to be converted to a permanent SCM at a later time, The pre -construction meeting should be scheduled prior to construction of the S&EC device. Call 919-560-4326 Ext. 30238 to schedule the required meeting date. This is in addition to other pre -construction meeting requirements for erosion control, engineering inspections, etc. 16. To receive site plan/preliminary plat approval for developments other than single family detached, townhome and duplex residential developments that are making use of nutrient banks of NCEEP, the approval of the site plan/preliminary plat is contingent upon the purchase of nutrient credits. If a revised site plan/preliminary plat is submitted for this development, the revised site plan/preliminary plat will be subject to any ordinances in place at the time of the revised site plan/preliminary plat submission. Prior to the approval of the site plan/preliminary plat, a letter/reciept showing the purchase of the nutrient credits for this development and a copy of the nutrient bank ledger if applicable, showing the total nutrient credits available minus any and all deductions, is to be provided to the stormwater development review section. SPECIAL CONDITIONS OF APPROVAL 1. For developments required to have a stormwater BMP facility: "Final design calculations for the stormwater BMP facility will require the use of storage indication routing methodology such as TR-20 or HEC-1 models. For the BMP facility, provide stage -storage relationship and inflow and outflow hydrographs. Provide all tabulated data including calculations showing the outlet under orifice control, barrel control and weir control, as appropriate, to show how the routing was developed." 2. For Developments required to have a stormwater BMP facility: "An executed stormwater facility operation and maintenance permit agreement (prepared by Stormwater Services, City of Durham), payment of stormwater facility permit fee per BMP facility and perpetual surety for the continued operation and maintenance of the facility is required prior to construction plan approval." 3. For Developments required to have a stormwater BMP facility: "An As -Built certification for the stormwater BMP(s), provided by the design engineer, is required. The as - built shall be submitted per the Reference Guide for Developoment, approved by the Stormwater Services Division and the BMP(s) shall be inspected and approved by the Stormwater Services Division prior to issuance of any certificates of occupancy or certificates of compliance for the project. 4. For Developments required to have a stormwater BMP facility: "A completed City of Durham Design Summary is required for each stormwater BMP facility no later than at the first construction drawing submittal. 5. For Developments required to have a stormwater BMP facility: "Stormwater BMP facility design calculations will not be reviewed or approved with the Site Plan/Preliminary Plat submittal. All stormwater BMP facility designs will be reviewed and approved during the construction drawing submittal process. REVISIONS TO APPROVED PLANS FOR SITES WITHOUT FLOODPLAIN MEASURES SHALL BE PROVIDED TO PREVENT LIGHT SPILLOVER ONTO ADJACENT PROPERTIES AND GLARE TOWARD MOTOR VEHICLE OPERATORS AND SHALL BE INDICATED ON THE SITE PLAN. EXTERIOR LIGHTS SHALL BE SHIELDED SO THAT THEY DO NOT CAST DIRECT LIGHT BEYOND THE PROPERTY LINE. IN ACCORDANCE WITH THESE STANDARDS: a. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO RESIDENTIAL ZONING IS 0.5 FOOT CANDLES. b. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO NONRESIDENTIAL ZONING IS 5.0 FOOT CANDLES. c. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO A STREET IS 5.0 FOOT CANDLES. d. THE LEVEL OF ILLUMINATION AS MEASURED IN FOOT CANDLES AT ANY ONE POINT SHALL MEET THE STANDARDS IN THE TABLE IN UDO SECTION 7.4 WITH MIMIMUM LEVELS MEASURED ON THE PAVEMENT WITHIN THE LIGHTED AREA. e. THE MAXIMUM HEIGHT FOR DIRECTIONAL OF FULL CUT-OFF LIGHTING FIXTURES (FIXTURES DESIGNED TO INSURE THAT NO LIGHT IS EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 30 FEET ABOVE GRADE, MEASURED TO THE TOP OF THE FIXTURE. f. THE MAXIMUM HEIGHT FOR NON -DIRECTIONAL LIGHTING FIXTURES, WHICH ARE DEFINED AS FIXTURES DESIGNED TO ALLOW LIGHT TO BE EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 15 FEET ABOVE GRADE, MEASURED TO THE TOP OF THE FIXTURE. g. THESE STANDARDS MUST BE VERIFIED BY FIELD SURVEY (BY USE OF PHOTOMETRIC SURVEY) PRIOR TO THE CERTIFICATE OF COMPLIANCE BEING ISSUED. ALL OF THIS INFORMATION, INCLUDING DETAILS, WILL BE REQUIRED ON BUILDING PLANS PRIOR TO ISSUANCE OF BUILDING PERMIT. BUFFER AUTHORIZATION BY THE NORTH CAROLINA DIVISION OF WATER QUALITY (NCDWQ) IS REQUIRED PRIOR TO CONSTRUCTION DRAWING APPROVAL. SITE PLAN CHANGES OCCURRING AS A RESULT OF ALTERATIONS NEEDED TO RECEIVE BUFFER AUTHORIZATION MAY RESULT IN THE NEED FOR A SITE PLAN AMENDMENT OR A NEW SITE PLAN BASED ON THE SCOPE OF THE REQUIRED CHANGES. IF A SITE PLAN AMENDMENT OR NEW SITE PLAN IS REQUIRED IT MUST BE APPROVED PRIOR TO CONSTRUCTION DRAWING APPROVAL. CONTACT THE DURHAM CITY -COUNTY PLANNING DEPARTMENT AT 919-560-4137 TO DETERMINE IF A SITE PLAN AMENDMENT OR A NEW SITE PLAN WILL BE REQUIRED. EACH LANDSCAPING COMPLIANCE INSPECTION AFTER THE INITIAL INSPECTION WILL INCUR A RE -INSPECTION FEE. PAYMENT MUST BE RECEIVED BY THE DURHAM CITY COUNTY PLANNING DEPARTMENT PRIOR TO RE -INSPECTION. FOOT WIDE UNDISTURBED LANDSCAPE BUFFER. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED. a. PRESERVED TREE COVERAGE AREAS SHALL NOT BE USED FOR ACTIVE RECREATIONAL PURPOSES, EXCEPT FOR WALKING PATHS AND FOOT TRAILS CONSTRUCTED WITH MINIMAL DISTURBANCE OF TREE ROOTS AND EXISTING VEGETATION PROVIDED A REGISTERED ARBORIST HAS CERTIFIED THAT THE CONSTRUCTION OF THE TRAIL HAS BEEN DESIGNED TO MINIMIZE IMPACT TO THE EXISTING TREES. NO TREE OVER 10 INCHES SHALL BE REMOVED FOR THE CONSTRUCTION OF TRAILS. SITE PLAN APPROVAL IS REQUIRED FOR CONSTRUCTION OF TRAILS IN PRESERVED TREE COVERAGE AREAS. b. ALL BUILDINGS SHALL BE SET BACK AT LEAST 10 FEET FROM THE EDGE OF ANY PRESERVED TREE COVERAGE AREA. c. UTILITY LINES AND DRAINAGE CHANNELS SHALL BE MINIMIZED WITHIN THE ROOT PROTECTION ZONES OF THE TREES TO BE SAVED. PREFERABLY, SUCH FACILITIES SHOULD BE LOCATED ADJACENT TO DRIVEWAYS AND IN GROUPINGS ALLOWED BY SOUND ENGINEERING PRACTICES. THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 0729 DATED 10/19/2018 . A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO THE INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 1. IF MORE THAN 12,000 SQ. FT. IS DISTURBED, A LAND -DISTURBING PERMIT WILL BE REQUIRED PRIOR TO THE COMMENCEMENT OF ANY LAND -DISTURBING ACTIVITIES. 2. IF MORE THAN 20,000 SQ. FT. IS DISTURBED, A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND -DISTURBANCE PERMIT. 3. TREE PROTECTION IS REQUIRED BY THE CITY/COUNTY PLANNING DEPARTMENT, TREE PROTECTION CERTIFICATION MUST BE SUBMITTED TO THE DURHAM COUNTY EROSION CONTROL DIVISION AND TREE PROTECTION INSPECTION COMPLETED PRIOR TO A LAND -DISTURBANCE PERMIT ISSUANCE. 4. IF AN OFFSITE SPOIL OR BORROW SITE IS UTILIZED, THE DISTURBED AREA MUST BE INCLUDED IN THE LAND DISTURBANCE PLAN AND PERMIT UNLESS ALREADY PERMITTED. 5. IF THE DISTURBED AREA EXCEEDS FIVE ACRES, AN IMPROVEMENT SECURITY WILL BE REQUIRED PRIOR TO LAND -DISTURBING PERMIT ISSUANCE. N 0�00�0 S� U Z 0 W Sl TE 0 Of Y 0 0 U JULIETTE DR. VICINITY MAP NTS U17,FA�� �1��I�Ct7��►Til�� 3901 S ROXBORO ST. DURHAM, NC 27713 SHEET INDEX: C000 COVER SHEET C100 EX.CONDITIONS/DEMOLITION PLAN C101 EX.CONDITIONS/DEMOLITION PLAN C102 EX.CONDITIONS/DEMOLITION PLAN C200 GRADING PLAN C201 GRADING PLAN C202 GRADING PLAN C300 EROSION CONTROL PLAN(PHASE 1) C301 EROSION CONTROL PLAN PHASE I C302 EROSION CONTROL PLAN PHASE I C304 EROSION CONTROL PLAN PHASE II C305 EROSION CONTROL PLAN PHASE II C306 EROSION CONTROL PLAN PHASE II C400 DETAILS C401 DETAILS C500 DRAINAGE AREA EROSION CONTROL PHASE I C501 DRAINAGE AREA (EROSION CONTROL PHASE 11) if Waller & Associates, PC SITE DEVELOPMENT - INFRASTRUCTURE- PLANNERS- SURVEYORS A MINORITY OWNED ENGINEERING AND SURVEYING FIRM 7-L DUNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT 421-026-274 a. TEMPORARY OR PERMANENT ROADWAYS OF ALL-WEATHER DRIVING SURFACE, CAPABLE OF SUPPORTING A 75,000 POUND VEHICLE WEIGHT, SHALL BE ESTABLISHED PRIOR TO THE COMMENCEMENT OF BUILDING CONSTRUCTION ACTIVITIES. THESE ROADWAYS SHALL BE EXTENDED WITH THE PROGRESS OF CONSTRUCTION SO THAT: 1. ALL POINTS AROUND THE PERIMETER OF A BUILDING UNDER CONSTRUCTION IS NO GREATER THAN 150 FEET TRAVEL DISTANCE FROM A ROADWAY. 2. FIRE DEPARTMENT CONNECTIONS (FDC), EITHER TEMPORARY OR PERMANENT, ARE NO GREATER THAN 100 FEET TRAVEL DISTANCE FROM A ROADWAY. b. TEMPORARY WEATHER -RESISTANT STREET SIGNS OF STANDARD SIZE AND LETTERING SHALL BE PROVIDED AT THE INTERSECTIONS OF TEMPORARY OR PERMANENT ROADWAYS AND SHALL REMAIN IN PLACE UNTIL REPLACED BY PERMANENT SIGNS. c. FIRE HYDRANTS, AS SHOWN ON THE APPROVED SITE PLAN, SHALL BE PLACED IN SERVICE AND MADE AVAILABLE TO THE FIRE DEPARTMENT AS SOON AS COMBUSTIBLE MATERIAL ARRIVES ON SITE. NO CONSTRUCTION FENCING OR OTHER BARRIERS ARE TO BE PLACED BETWEEN THE ROADWAY AND THE HYDRANTS, WITH MINIMUM 3 FEET WORKING CLEARANCE AROUND HYDRANTS. HYDRANT SERVICE SHALL BE EXTENDED WITH THE PROGRESS OF CONSTRUCTION SO THAT: 1. ALL POINTS AROUND THE PERIMETER OF A BUILDING UNDER CONSTRUCTION IS NO GREATER THAN 500 FEET TRAVEL DISTANCE FROM A HYDRANT. 2. FIRE DEPARTMENT CONNECTIONS (FDC), EITHER TEMPORARY OR PERMANENT, ARE NO GREATER THAN 50 FEET TRAVEL DISTANCE FROM A HYDRANT. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THE CITY OF DURHAM, DURHAM COUNTY AND/OR NCDOT STANDARDS AND SPECIFICATIONS. a) A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND -DISTURBANCE PERMIT. b) IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND -DISTURBANCE PERMIT. AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OF STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. GENERAL CONDITIONS OF APPROVAL 1. Stormwater Drainage Easement Note (Width determined at construction drawings): "Centerline of foot wide public storm water drainage easement. Ownership of and responsibility for improvement and maintenance of storm water facilities in this easement remains with the current owner. If the property is within or becomes a part of the City, the easement and access points to the easement are subject to the terms and restrictions stated in the "Revised Declaration of Rights and Privileges of the City of Durham in Storm Water Management Facility Easements" recorded in Real Estate Book 2298, Page 208, which document is incorporated herein. This easement and Revised Declaration do not create the obligation to provide public maintenance. No building, structures, fills embankments or obstructions permitted within the easement except according to those terms". 2. Stream Buffer Notes (Width determined at Rezoning or Site Plan): 11 foot wide undisturbed stream buffer each side of stream, measured from top of bank. No clearing or grading other than selective thinning and ordinary maintenance of existing vegetation permitted." 3. Floodplain Notes: "All development within the floodway and floodway fringe, including fill, new construction, substantial improvements, manufactured housing, storage of materials and storage of toxic or flammable substances, is prohibited except as provided by applicable Flood Hazard Regulations." 4. General Notes: "State and federal permit authorization may be required from the DEHNR and the U.S. Corps of Engineers prior to the commencement of any land disturbing activities in or near a lake, stream, creek, tributary or any unnamed body of water and it's adjacent wetlands." ROOT PROTECTION NOTE (UDO SEC 8.3) EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IE GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. TREE PROTECTION NOTE (UDO SEC 8.3) TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESSPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR/ZONA PROTECTORA PARA LOS ARBOLES". APPROVALS: EVO KE STUDIO I ARCHITECTURE COVER SHEET Ian ` I c6 . � =LM GROVE TOWNHOME ASSOCIATION, If 4024 S. Roxboro St.(Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 325.53 INV IN (S): 318.78 INV OUT (N): 318.76 GPS#2 ELEV=327.14 U z o � zo 1 c a 0 E' n N 00 Cf) j 0 � w=o_oco0 z� I �� O oz�Lo LLI XO N Om_ O t0m _ a- Z �•`1 O O O a `c' TOP: 340.08 24" INV OUT (W): 332.43 & c TOP: 335.78 INV OUT (E): 330.23 TOP: 338.06 INV IN (E): 330.09 INV IN (NW): 330.04 INV OUT (N): 330.04 TOP: 339.26 INV IN (E): 331.41 INV OUT (W): 331.06 24" CUBe - & cur THAXTON HOMEOWNERS ASSOCIATION, INC. 5002 Thaxton PL(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0988 w of a U Lo 0 DB 5856 PG 853 w PB 156 PG 289-297 0 U Co 4" HOLLY 8" SYCAMOIF�_ J "I9 \ 'I3�1 � J I R 22 I o_ a 00 - 323 - I- - a- a - I324 I � � - 325 �25 /a- m -I326 330 - 327 w D _J o a -L28 - 329 _ -�30 V D ,. If - 331 - i w J nj 00 / m / D� / I < F /3 , /co 3 , m 3 ' �Ij / w / 3�m < 0-0 I3 EL OD THAXTON HOMEOWNERS ASSOCIATION, INC. 4305 Brynwood Ave.(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0526 GPS#1 DB 5856 PG 853 �ELEV=347.97 PB 156 PG 289-297 / I I 1 j l II 11 Ir�l�11 J /11 l/ \I���U II MATCH -LINE SHEET 101 I 1 \ l//l /// I'1/1// j,/I I I / // l Jj ��✓�;��/l ��/ , // ►�� I' v I 1 / Is / ///// / YIq)I SYLAI�10f2E �5/ / / / l ll/ ln// lI 111/40 111/�lI l l A�8 � // /' //� // // / / MAP /'15" LE(# l# / / J / / 1 ''PINEMt-23) Ill v,Y C/A ,/ / j9%8) 3`3�,' / �)11(/ , // /0\"f - /// I �/1 �qv / �0"/ DBL MP(PL�(10 / / / / / / / // / III I \(I� I I� -�(/ -;// / / / / �// / / / / / / / / lIJI p /j% 9/A K�#)� / / / / l l l / 1 //mil' / j� / 'iC M�RV(#/12� 1.1 , �I \MY1 \R\E�1 ( \I � 3 r\1 �Ai(#A 4 3 ' ,309 Q IIMI I I �\ //�r - ��J� / I I / / / / / J / / J 1 I 1 / IL111 I;`'i w l `/! \�// �\�✓ \ ( / � / / / / / / / / / / 1 1 1 l l l I l l ( / % / � ll 4111 l l I IMII ^\ , I l/ l/ l J / J/ / / 1 I 1 I 1 I I 1 I I I I 1 1 1 , �(l/ l I l I 1 1 I 1 I N Z u, I 121 \� �l// / / i' �\ I 1 I I I I I I l/ ( I 1 (( I I I\ \ I I I 1�111 Icj��'Z )) // /� / / / / / / / / l J 1 / / /I I 1 I 1 1 \\ 1 IIh /( \ \ \ \ \ \ \ 1" pI�E�#11oJ) _ /d � / / / / / / � I / � l l / I 1 1 / III /,•�\,� / \ \ \� \ � III I \ I1 1 Ills 1'I I I ! E s I`\\ I l cv \ IN, \ \ 1 \ \ \'GIs O'AK1 5)\ \ \ / o �`'� M��'1m#9/ j/ / ///--_\ I I I 1 1 I l {�/��j�/// / l/ 1( 360 'o / I I ' 11 SAW10 / �� / �3tin' /----,� / ) \\ \ \\� / 1�3 GIhM( ) �� 50' STREAM BUFFER \13" bAK(t68) MEASURED FROM TOP OF BANK - ) II / / / / 3ti� /' � � 14'/OAK' ;'. (# (II II / LI / / -- / ✓ / / / / / / I I / / I / /„lJ 4 w ll/ \\\` ` 5CY` TREAKAUFER _ - - - _ - - - a 1�13`GYM (#�65 a, I /���\(M�SS�1 D FF�OM/ ,ZO/ � �- _--_-- / 'I MAUL 2 / s INE \I II ' 1001' /Bf(N / _ - - -46= RGP-LP )' / (Iul, 1111/I/322 - / l jJ/l .-I-2" TR�(#9� - \ 12' OAK 6 l///� 15"CIAK(#61\�I//�(/ r /0",MrPL5#.74j `�114( I YiCKQRYt%#7- / 0 14IN #155) I \I I EN11 I / 14/ O�K(#I6�)»IGUMk#56(k� 221" TRkE(ff I 1 5 I// 5" Ob,K(I#7Q) 1 I 4» �jAKJ#771l) / 6" P1N�#�� BE I I l I ECH(#57�F � y I I I 1 \ \ \ I / f qAN(#f 3) l � n�(#i9 j2, // I I » I 1 I I l I I 15' POPLAR71) 1\5 AK�#7) I I I I I I! I l l l l 1 4" OAK(# I loss 6AK0 6 ) \ \\ \I I I I I \ 1 1 1 ( I I 1 I g'I 1V1A 'L N Ef / I l I I I I I r KI 0Y(l-?\2\ b\"\\ 40 „1i1AP I2/ PL 0 rn 45'_B1P�N(8 \s\)b\#5\> I \ I \ \ / 65' MASS 1229 / ./ �/ ► / / 1/ I/€#3�/ �0/ /P/EAw =349.471 GRADING 2d$$ PIJA �4) (#48� 00 G ✓NETLED X%w Co24" POPLAR(#54)MA'L #40) I \ \V BUFFER PINE(#34 ZOK(M 9)1 I / IPF 0.75" AOA �� \ \ \\ \ \ \ \ \ \2( C�MUNII 11 N CAPIN S�J\ \ � \� \ / � ° �5\' 0 1i �85� \ \ \ �d jRgjfEA9 / // / / \ \\\\ \` 2 /F' NE(# l 13" OA1�(# 0) _ MEHDI MOHAMMAD G. A. ADELI \ - �. s+�� \\\\� / /I3"/P06'LAF (#41�j rr \i \ g� �IWN \ N�6° „ \� ��S\\ \\ p< / / e° /i� I o0 0 4401 Dolwick Dr. / \ 1 \ o �/ '3�2 / �h l F B NT �17 27 -469 _ \ 34 \\\`�Rp\\ \\\\ \\\\ \ / 2 / �j ZONE: PDR 3.44 `�/ v \\ U / / / �h�'/ / / CYNDI CHADILI \ \\ \\ \\\�1\1 ( / ;a� go PIN 0729-01-17-9723 / c� °Ua / �,/// / 4401 Nightfall Ct. `�'� \\\af \ �",� / ^\\J DB 5302 PG 789 s ='= z r� F \ \\ I ^_ o PB 141 PG 171-175 (LOT 30) o - cn / ///, // ZONE: PDR 3.44 O \\\ \1 I I I III a' 1 NE # 2) i Z 'n PIN 0729-01-17-4762 I 1 I II i 15" GUv1WIPF 0.75" GEOFFREY C. ORME-EVANS - z �t N ANN W. HARRIS \ I I I I I I I I I �o Q`� I U I DB 5111 PG 570 II /III II III HOPE VALLEY FARMS NORTH � - RYAN S. HARRIS KAEBAH ORME-EVANS o Q Alt - o't CINDY H. NG PB 143 PG 40-43 (LOT 58) 4403 Nightfall Ct. I I III I III 1 OWNERS ASSOCIATION, INC. 4402 Dolwick Dr. ' LL o 0 0 I a- o GODOGREDO T. NG ZONE: PDR 3.44 IIII I I I � I 1 1 652 Edenberry Dr. (Open Space) ZONE: PDR 3.44 DANIEL BIRMINGHAM a- o q- a_ 4402 Nightfall Ct. PIN 0729-01-17-5649 III I I 1 ZONE: PDR 3.44 PIN 0729-01-17-8740 DEBORAH BIRMINGHAM ZONE: PDR 3.44 DB 7511 PG 47 J w N N PIN 0729-01-17-3699 DB 6228 PG 965 111 PIN 0729-01-17-6598 4403 Dolwick Dr. 22" PIN j cn oz PB 143 PG 40-43 (LOT 57) DB 2644 PG 595 PB 141 PG 171-175 (LOT 31) ZONE: PDR 3.44 s w N o om m DB 2780 PG 271 PB 143 PG 40-43 PIN 0729-01-27-0609 U z w _z o PB 143 PG 40-43 (LOT 59) DB 6458 PG 879 it = 00 ° PB 141 PG 171-175 (LOT 29) O SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. DEMOLITION LEGEND CONTRACTOR SHALL DEMOLISH AND PROPERLY DISPOSE OF SURFACE ITEMS OFF -SITE TP TREE PROTECTION FENCING PER DETAIL 5/C400 � CL � CONSTRUCTION LIMITS 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS DEMOLITION NOTES EXISTING CONDITIONS LEGEND VJTR WrR GAS GAS UG-PWR UG-TEL STSWR UG-FO - --cry--- cry- - -cTv- EX. WATER LINE EX. GAS LINE EX. UNDERGROUND ELECTRIC EX. UNDERGROUND TELEPHONE EX. STORM SEWER EX. UNDERGROUND FIBER OPTIC EX. UNDERGROUND CABLE TV N S U 0? 0 SI TE 0 Y O U JULIETTE DR. Vl CI NI T Y MAP SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Waller SL Associates, PC SITE DEVELOPMENT -INFRASTRUCTURE -PLANNERS -SURVEYORS A MrNORFLY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DITNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1 " = 40' 0 40' 80' 1. THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES WITHIN THE PROJECT LIMITS PRIOR TO THE START OF ANY EXCAVATION. 2. ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED FROM SITE AS DEMOLITION PROGRESSES (DAILY). ALL DEMOLITION DEBRIS SHALL BE PROPERLY TRANSPORTED AND DISPOSED OF OFF -SITE. 3. CONTRACTOR SHALL DEMOLISH ALL CONCRETE PAVEMENT, SIDEWALK AND CURBING TO THE NEAREST JOINT. 4. UPON COMPLETION OF DEMOLITION, CONTRACTOR SHALL REMOVE ALL TOOLS, EQUIPMENT, AND DEMOLITION MATERIALS FROM THE SITE. 5. CONTRACTOR SHALL PROTECT UTILITIES WITHIN THE DEMOLITION AREA THAT ARE TO REMAIN IN SERVICE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY DAMAGE TO THOSE UTILITIES. 6. CONTRACTOR SHALL PROVIDE ALL BARRICADES, CONES, SIGNS, FLAGMAN ETC. TO PROTECT PEDESTRIANS AND VEHICLES. 7. CONTRACTOR SHALL BACKFILL ALL VOIDS CREATED BY THE REMOVAL OF THE UNDERGROUND UTILITIES WITH SUITABLE FILL AS DETERMINED BY THE ON -SITE GEOTECHINICAL ENGINEER. KI TUDIO I ARCHITECTU EX. CONDITIONS/ DEMOLITION PLAN MATCH -LINE SEE SHEET 102 ELM GROVE TOWNHOME ASSOCIATION, INC. 4024 S. Roxboro St. (Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 Iry gi 47 r A- OVA 00A IF FAR V-0020 MEN NO 0—, OAF pop 1, 14401 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. DEMOLITION LEGEND CONTRACTOR SHALL DEMOLISH AND PROPERLY DISPOSE OF SURFACE ITEMS OFF -SITE TP TREE PROTECTION FENCING PER DETAIL 5/C400 CL CONSTRUCTION LIMITS GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS DEMOLITION NOTES MATCH -LINE SEE SHEET 100 EXISTING CONDITIONS LEGEND WTR WrR GAS GAS UG-PWR UG-TEL STSWR UG-FO — — CN — — — CN — — — CTV — EX. WATER LINE EX. GAS LINE EX. UNDERGROUND ELECTRIC EX. UNDERGROUND TELEPHONE EX. STORM SEWER EX. UNDERGROUND FIBER OPTIC EX. UNDERGROUND CABLE 1V N S U 2 �o W SI TE 0 0 U JULIETTE DR. Vl CI NI T Y MAP- N. T.S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: 1174 1198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDINGS) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES OF THE 97 PROVIDED PARKING SPACES 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PAN EL#.............................0729 EFFECTIVE DATE................10/19/2018 if Waller SL Associates, PC SITE DEVELOPMENT -INFRASTRUCTURE -PLANNERS -SURVEYORS A MINORITY OWNED ENGINEERING AND SURVEYING FIRM 7-L DtJNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1 " = 40' NOR 0 40' 80' 1. THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES WITHIN THE PROJECT LIMITS PRIOR TO THE START OF ANY EXCAVATION. 2. ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED FROM SITE AS DEMOLITION PROGRESSES (DAILY). ALL DEMOLITION DEBRIS SHALL BE PROPERLY TRANSPORTED AND DISPOSED OF OFF -SITE. 3. CONTRACTOR SHALL DEMOLISH ALL CONCRETE PAVEMENT, SIDEWALK AND CURBING TO THE NEAREST JOINT. 4. UPON COMPLETION OF DEMOLITION, CONTRACTOR SHALL REMOVE ALL TOOLS, EQUIPMENT, AND DEMOLITION MATERIALS FROM THE SITE. 5. CONTRACTOR SHALL PROTECT UTILITIES WITHIN THE DEMOLITION AREA THAT ARE TO REMAIN IN SERVICE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY DAMAGE TO THOSE UTILITIES. 6. CONTRACTOR SHALL PROVIDE ALL BARRICADES, CONES, SIGNS, FLAGMAN ETC. TO PROTECT PEDESTRIANS AND VEHICLES. 7. CONTRACTOR SHALL BACKFILL ALL VOIDS CREATED BY THE REMOVAL OF THE UNDERGROUND UTILITIES WITH SUITABLE FILL AS DETERMINED BY THE ON -SITE GEOTECHINICAL ENGINEER. KI TUDIO I ARCHITECTU ARCHITECT EVOKE STUDIO I ARCHITECTURE 401 FOSTER STREET, SUITE B1 DURHAM, NC 27701 T: 919.495.6079 CIVIL ENGINEER JC WALLER & ASSOCIATES, PC 7-L DUNDAS CIR GREENSBORO, NC 27407 T: 336.697.2637 LANDSCAPE ARCHITECT REVINGTON REAVES 1250 REVOLUTION MILL DRIVE, SUITE 143 GREENSBORO, NC 27405 T: 978.793.2297 STRUCTURAL ENGINEER MMSA, INC. 30 PATEVVOOD DR. SUITE 100 GREENVILLE, SC 29615 T: 864.331.1201 MEP ENGINEER DEWBERRY ENGINEERING 2610 WYCLIFF RD, SUITE 410 RALEIGH, NC 27607.3073 T: 919.881.9939 F: 919.881.9923 NC LICENSE: F-0929 AUDIO VISUAL KONTEK 318 HOLLAND ST DURHAM, NC 27701 T: 919.680.4321 LIGHTING GLIMMER & GLOW ARCHITECTURAL LIGHTING 4711 HOPE VALLEY RD, SUITE 4F-611 DURHAM, NC 27707 T: 919.425.8945 FOOD SERVICE KRM FOOD SERVICE DESIGN & CONSULTING 9116 LANIGAN STREET CHARLOTTE, NC 28277 T: 704.724.1045 SPECIFICATIONS G2 SPECS, INC. 3301 N HAMMOCK DUNES VILLAGE POINT LECANTO, FL 34461 T:104.609.2174 COST ESTIMATING HARRISCOST PO BOX 14979 SURFSIDE BEACH, SC 29587 T: 864.307.0021 CONSTRUCTION MANAGER LECHASE CONSTRUCTION 324 BLACKWELL ST, SUITE 1200 DURHAM, NC 27701 T: 919.688.5300 Thistlrasrm isthe ro ed ofEIOKEStudioArch¢isoottobeecture,and q p p / reproduced or copied in whole or in can. It is only to be used for the project and site s specifically idenlilledherein and is not to be used on an other project. P / � Y pl It is to be returned upon the nritlen request of EVOKE Studio Architecture. 0 2022 by EVOKE Studio Architecture PROJECT 111 C SEALS .�`��,��` CARS<�''� °°°°°°° - ° ° °; =oa 'SEAL ° < o�6/o, °ti F1eI,/ c� � ► � \`\112012022 ;������R•&•ASS, Pu. SEAL '•.C-3934 .� • 0 0 PHASE: DATE: ESA NO.: EX. CONDITIONS/ DEMOLITION PLAN TOP: 323.38 INV OUT (SE): 319.03 TOP: 321.60 INV IN (NW): 317.17 INV OUT (NE): 317.08 ELM GROVE TOWNHOME ASSOCIATION, INC. 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 DB 6460 PG 794 PB 162 PG 166-178 MATCH -LINE SEE SHEET 101 TOP: 315.18 INV IN (SE): 305.88 INV OUT (NE): 305.78 TOP: 314.23 INV IN (SE): 306.23 INV OUT (NW): 306.21 TOP: 313.09 INV IN (SW): 306.84 INV OUT (NW): 306.84 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. ELM GROVE TOWNHOME ASSOCIATION, INC. 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 DB 6460 PG 794 PB 162 PG 166-178 TOP:287.07 INV IN(SE):278.22 INV OUT(NW):278.22 TOP: 287.19 INV OUT (NW): 279.09 TOP: 286.07 INV IN (E): 277.80 INV IN (SW): 277.59 INV OUT (NE): 277.: i Ir 440 LA \ oo I II r3`- QIRC 26 t bA�C\ I ��tJK'I�� \ J �/�/(#26 (50)1 I\ I rr��l1 )111�/ I> \ P�PLA �� j1��II)G\�4)LA //� W ''/ /'� '\ \ \ \ / /// \ 1 �" �A ( 63) \ \ \ \ \ 1 al 1 I01 I I I I 1 1 //i /i/ l / 1 \ \ \ \ ry \ \ I 1 I I o /� /`\ \�/�! �\ / \ 1 \ \ \ �\ \ Ins\ I I\ I �6'__QA 5,3 N / ////// \ / " MAPI\E 2 7) PNE(#266) cS y2 � 3 NNNN 317 \ NN lZX ILL\ \2 W09ED 12� 2�" II 121 A3"/MA9LE #1 1 /8Y JNE�l /12"/,dAPI1(#/17) /> p/kk "-P1INF(-#17 /-MAPLEW68 / 11 �"/MA EXISTING CONDITIONS LEGEND VJTR WrR GAS GAS UG-PWR UG-TEL STSWR UG-FO --CN---CN---CN- 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS EX. WATER LINE EX. GAS LINE EX. UNDERGROUND ELECTRIC EX. UNDERGROUND TELEPHONE EX. STORM SEWER EX. UNDERGROUND FIBER OPTIC EX. UNDERGROUND CABLE TV DEMOLITION NOTES DEMOLITION LEGEND CONTRACTOR SHALL DEMOLISH AND PROPERLY DISPOSE OF SURFACE ITEMS OFF -SITE TP TREE PROTECTION FENCING PER DETAIL 5/C400 � CL CONSTRUCTION LIMITS N 10 S U 2 0 SI TE 0 0 U U JULIETTE DR. Vl CI NI T Y MAP- N. T.S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 if Waller SL Associates, PC SITE DEVELOPMENT -INFRASTRUCTURE -PLANNERS -SURVEYORS A MrNORIIY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DtJNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1 " = 40' NOR 0 40' 80' 1. THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES WITHIN THE PROJECT LIMITS PRIOR TO THE START OF ANY EXCAVATION. 2. ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED FROM SITE AS DEMOLITION PROGRESSES (DAILY). ALL DEMOLITION DEBRIS SHALL BE PROPERLY TRANSPORTED AND DISPOSED OF OFF -SITE. 3. CONTRACTOR SHALL DEMOLISH ALL CONCRETE PAVEMENT, SIDEWALK AND CURBING TO THE NEAREST JOINT. 4. UPON COMPLETION OF DEMOLITION, CONTRACTOR SHALL REMOVE ALL TOOLS, EQUIPMENT, AND DEMOLITION MATERIALS FROM THE SITE. 5. CONTRACTOR SHALL PROTECT UTILITIES WITHIN THE DEMOLITION AREA THAT ARE TO REMAIN IN SERVICE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY DAMAGE TO THOSE UTILITIES. 6. CONTRACTOR SHALL PROVIDE ALL BARRICADES, CONES, SIGNS, FLAGMAN ETC. TO PROTECT PEDESTRIANS AND VEHICLES. 7. CONTRACTOR SHALL BACKFILL ALL VOIDS CREATED BY THE REMOVAL OF THE UNDERGROUND UTILITIES WITH SUITABLE FILL AS DETERMINED BY THE ON -SITE GEOTECHINICAL ENGINEER. KI TUDIO I ARCHITECTU EX. CONDITIONS/ DEMOLITION PLAN __LM GROVE TOWNHOME ASSOCIATION, If 4024 S. Roxboro St.(Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 325.53 INV IN (S): 318.78 INV OUT (N): 318.76 GPS#2 ELEV=327.14 U z o � zo a c g U � O rn c O E� �N V) o�mmrn j O o� w=o_o�o z3: Lij 01 00 � I �� 0 o Z 04 1 m XIN oOm- O 0 0m z,� 00 1.- 0 X L0 Q TOP: 340.08 INV OUT (W): 332.43 TOP: 335.78 INV OUT (E): 330.23 TOP: 338.06 INV IN (E): 330.09 INV IN (NW): 330.04 INV OUT (N): 330.04 w of TOP: 339.26 Lo INV IN (E): 331.41 - INV OUT (W): 331.06 0 THAXTON HOMEOWNERS ASSOCIATION, INC. 5002 Thaxton PL(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0988 io DB 5856 PG 853 w PB 156 PG 289-297 0 U 00 4" HOLLY 8" SYCAMOIY� W I !=P. E ll I a 00 323 Li - - a - I324 I � - 325 -I326 - 327 - [28 - - 329 _ - �330 ' 330 � I - 331 - OD I - 332 - � I \\\����� > 110' 3� I f I I I 1 I I I I I 1 1 / M , \ I I \ I \ \I I111✓ �\ \\ \ ��/ L_ \ 1 1 �,/ l'„ I1I/� I�II�I��I /�',��-, I MATCH -LINE SEE \ / I / BE4€Cg#4)//� / II I SHEET 201 � \ Ir 352- \ \ \ / ) \ \ 1 1 I \ I I I I \ 1 ///,///,/ /,/ /I1, // / /A o E / 5 SY Q� fi#1i II 1 l l / / / / / / \ , ! \ 1 // ll M ll /l / l l l l� / / / / IIn 352 \ / / �/ / / / /// / // / / / / / / / , AT8 / / / / / 45" MAPLE(# I" YcIA / /\7�A 7 o � / � /\ y / �, / / h i#� / 5 / I / J / / / / / / % 1 /< �\ 1 / / / / 1 PINEM�3) . N / / /� // ' i / / / I o 00/ / / / / // / / / LOCATION OF FUTURE F I 00 / / OUNDATIO N/RETAINING N WALL CONTRACTOR SHALL BENCH BACK EARTH IN ACCORDANCE WITH OSHA /sGA R�(� REQUIREMENTS FOR THE FUTURE 9_ �/// /� )�(/ / / / / / / / °/ I / / / CONSTRUCTION OF THE WALL WHICH WILL B 1' W PERMITTED SEPARATELY. E r Yl (9)/ // / / //'�L/ \ / / / �(o"/ DBL/ / MA( L�(#/l o / / ' / o / / / / I I I I I I I I / / '/ / // / // / I I I 1 \ ��I // 7 'arc M�ReQ12: � / `'�° I / 1 I I I I I I / / �j // / / /// ��In AR i11/ l( 1 w/l �; • / ,1/\ ����#�j� / // / /// /.3 � o w � I I I 1 I 1 ��, \ (`` � /// / / / / I � �/!/ ��/ I l � / , / / l / I / � 11 n\� \\\\\� / / 1 1 �' AID(#A 4� / / / / / / / °= I I I I I 1 1 / , \ \ \\ l / I �/l I/ - �/ 1 / I / \\ 309 / / / / / / / / / / / / �13 !\ / \\� ///-��\� o1I - Il1 \ /���\\� r / l l , l / l l / / , l I ° I I 11, 1 l , 1 , , 1 I I Q, l , <<l ,�i,/ do ! ! In w l �l \�/i � ��- \( l l l l l / I I � I 1 1 I I I I l I � %- / 3 / l /� / l Il l"'IT. I, 1 1 I I III l I 1 I I (I ' N I I 121 ZI/-^l(��L� 1 1 11 /l l I 1 I l ICI I I oil � \� ?��// / / / / /' \\ \ I �/ ll/%ll1 Illll�l I 1111I l/ � 11 i�J� ( ( I 1 ( ( I I I \ \ I I I b"1/ crA E#1-5�' / I, 1/II1/ 1 \ 1\III 18 pIE 10� rboll7 1 II I i 1'I 1 l E \ \ 41 OAK 1b5 \ \ \ /- lZz �P/0/0i�RIDGE � /l >�p 3 / / / / 1 III ,, I I I of I lu,I ' / - - / ,� / 60 / 1 I 1 I I , / I IIII / /°,l I 1 I I I I '' / / / / J n - ko \ \ \ I� I v- I ICI / /� / / / / I I 1 1 I I I I I 3 - \ MI 1I � / / / A/ / \ i / / / I I 1 I I I I I \ I I 1 / I I I I I \ 1 sA� 10 / / / 3ti // -- ---_ "' l I I I P� \III 1 1 l l/ 1 1 I 1 IGIhM(/_ \ I � - \ / / / / / / I I I \ I I / / I \13" IDAK(�68) (ll I / - - - , - � I I ` I I / 50' STREAM BUFFER )I- / / 3ti / - O1 \ N I \ // I I 1-__/ I 1 v'6, /1.O / MEASURED FROM ii \ I II / / 31 _ _ _ 14" OAK(#' I TOP OF BANK I I / ti / � - - - 5 ° // /// l // l I I I I I\ 11, 1, I I III 1 `h-_ r w (I II I --_/ 33 I IIII / /✓ / I I I I I I I I I! y3"iJ 4 w 1 / /_-- 6 / / / / / / / / I I I I 1 1 1 I I I I / 1 013'� G1GM 65 I I % \\ 50' TR�AtNF�OMER- I'�33 l ti / � s-r 1!M / 32 / _,�,- - T l l IIII (51 i / / / l �h / / l l �n I I I I 1 I 7'1 MAL 2 '' ANE \I\ II ' 1111' ��BAN / / - _ _ - -46= P-9P-LP III1rIl, / / ��1 1 1 /�llllr I I I WIIII I I I )/(� III/I/ 33�1337 w / / / / / / I I I I I I III / �, �J/l��- / / / / / `� / / `� / / I 00 THAXTON HOMEOWNERS = ASSOCIATION, INC. 4305 Brynwood Ave.(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0526 GPS#1 DB 5856 PG 853 �ELEV=347.97 PB 156 PG 289-297 12" I OAK( 6 �� Il��c � � 1 / / / �' i ' / / l ' / / / / l f l / / / �/ // / �, N'// 1 I i \ 15" OlK(#q W j1//// I ' 1 I 1 a" WCK (RY(#7 �// / /! b / 1 /- (I / / J / / / / / / / / / / // o PIIN #155) I 1�\I I I „ I /� �/ _-- -"���I I SAd1 1 3A Yll / I 16 IBE E- "�Y712 ( �/- I " GUM#56) (ENS ��\l / I 1 I // / 141 OAK(#/i6)- ll I -71 �, IIIIIII III II Iwo I II 3 353 55 2w2II(" Tf R3k) E(I# 5obK( 74) 1 IlAK I#77I�/ PrF,, BECH(#5��,F � 5' I/ 1 \ \ \ \ / / I # �� \� I I I •I 1 \ \ 1 \ \ / ! / / / 3° / / 114' �l(#i9)�iF**' • I I 1 1 1 \ \ 1 ;w� II lwoIl lIl I I1 33 15" POPLARg1) l I\\ \P\\A�K�\# /IIII 338In / /2" 40 -1 OA 4 10" 6AK0 1 91 MAPLE(09fN / /' 3 1 �# 5> \ 1 ° I l I I r L ( o NOI CT 350 \ U w 355 1 �� 1 i / �1 1' MAP E�# 47 - 1 (( \ \\\\ N \ \ \ \ \2b"\ o�l�(\8b� 1 11 \ l / �< )I� / I? 1 121 MI PL�( \ \ \ \ \ \ \ \ \ \ \ \ / 19"\ P N s�1 \ / / 4" IiIIN�(#51 ( \\� +N� ) \ \ \ \ \ 65' MASS _ , ' / / / � � i' / / / l / / , / 1 I v / / \ /\ > I I l \ \ \ \ \ \ \ 1 oA �8,�„\\ GRADING / / / / / / / / / 1 I I / L �o'/ PNE(#48 / I �� 1 I I I > > 44'\ T�Et( 8 BUFFER / // / / / / I 1 j / / I 00 24" POPLAR(#54) I I \ \ \ ILLII I I I I / I 1 / < < / � / / / / MA(�L#�o) I < 1" O�K( 9)I I III 0.75"\\\ \ �MUNIfZJf'�N�CAPINETS// � � � ����\l J / l l cL I /i � 2( N CO�dG/RgjfE / / \ 2i ) \ \ \ / / / - \�\ �\ C / / ! > l 13"IOAI�(#10) MEHDI MOHAMMAD G. A. ADELI \ \ \( p'� \\ �\( / /I3"/P09LAF (#41�j / 4401 Dolwick Dr. �� y� NN \?8) I IPF B NT\\ `�\ x xS\\\gyp\\� / �2� / 6° l / I ZONE: PDR 3.44 \�\ \\\\ \\ \\\ \ / l ! PIN 0729-01-17-9723 CYNDI CHADILI \ , ,l / ��.a f\ \\ / t t 1 --�� '^ DB 5302 PG 789 _ z a i I / �/ / / 4401 Nightfall Ct. sy� \\\\ \\ �l \ \ 1 �.,j( PB 141 PG 171-175 (LOT 30) o - cn � ///i // ZONE: PDR 3.44 O \\\ �� I 11 III j 1 NE # i zZ C � N PIN 0729-01-17-4762 ANN W. HARRIS II' 'IIII IIII I II 1� "dGl1(v1 illPF 0.75" GEOFFREY C. ORME-EVANS o a 1 I DB 5111 PG 570 I I II 1 HOPE VALLEY FARMS NORTH 0,11 N o RYAN S. HARRIS III III I \ I KAEBAH ORME-EVANS 1 CINDY H. NG PB 143 PG 40-43 LOT 58 4402 Dolwick Dr. li v 1 a- GODOGREDO T. NG ( ) 4403 Nightfall Ct. I I III III 1 OWNERS ASSOCIATION, INC. I I 652 Edenberry Dr. (Open Space) ZONE: PDR 3.44 DANIEL BIRMINGHAM 5' 01 0 � 0 ZONE: PDR 3.44 I I �I a_ o �r a 4402 Nightfall Ct. PIN 0729-01-17-5649 I I I I I I � I ZONE: PDR 3.44 PIN 0729-01-17-8740 DEBORAH BIRMINGHAM r < I- . 1 ZONE: PDR 3.44 DB 751 1 PG 47 N Z N N PIN 0729-01-17-3699 DB 6228 PG 965 I I 1 PIN 0729-01-17-6598 4403 Dolwick Dr. cn -0 o N PB 143 PG 40-43 (LOT 57) DB 2644 PG 595 PB 141 PG 171-175 (LOT 31) ZONE: PDR 3.44 w N o m m DB 2780 PG 271 PB 143 PG 40-43 PIN 0729-01-27-0609 o PB 141PG7 o PB 143 PG 40-43 (LOT 59) D 8 PG 879 (LOT 29) I II o N GRADING LEGEND - - -821- - - EX. CONTOURS 810 PROP. CONTOURS MAJOR SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS GRADING NOTES 1. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 2. INSTALL INLET PROTECTION AROUND ALL YARD, CURB AND GRATE INLETS WITHIN THE PROJECT LIMITS. 3. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL PRACTICES AND MEASURES IN ACCORDANCE WITH THE APPROVED SEDIMENTATION CONTROL PLAN AND CONSTRUCTION SCHEDULE. 4. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND FILLED, AND PRESERVE IT FOR USE IN FINISHING THE GRADING OF ALL CRITICAL AREAS. 5. SCARIFY AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 INCHES BEFORE PLACING TOPSOIL. 6. CLEAR AND GRUB AREAS TO BE FILLED BY REMOVING TREES, VEGETATION, ROOTS OR OTHER OBJECTIONABLE MATERIAL THAT WOULD AFFECT THE PLANNED STABILITY OF THE FILL. 7. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER MATERIALS INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS. 8. DO NOT INCORPORATE FROZEN, SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS INTO FILL SLOPES. 9. PERMANENTLY STABILIZE ALL GRADED AREAS IMMEDIATELY AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE GRADING PLAN. APPLY TEMPORARY STABILIZATION MEASURES ON ALL GRADED AREAS WHEN WORK IS TO BE INTERRUPTED OR DELAYED FOR 30 WORKING DAYS OR LONGER. 10. CHECK ALL GRADED AREAS AND EROSION AND SEDIMENTATION CONTROL MEASURES ON A WEEKLY BASIS AND AFTER ANY HEAVY RAINFALLS. PROMPTLY REMOVE ALL SEDIMENT FROM DIVERSIONS AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUTS OR BREAKS OCCUR, REPAIR THEM IMMEDIATELY. 11. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAWED UNLESS INDICATED OTHERWISE ON THE PLANS. N C , I f- 4b S U 2 0 Q SI TE 0 Y O U JULIETTE DR. Vl CI NI T Y MAP N. T. S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: 1174 1198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PAN EL#.............................0729 EFFECTIVE DATE................10/19/2018 Wa[[er B�.Assoeiates, PC SITE DEVELOPMENT -INFRASTRUCTURE -PLANNERS -SURVEYORS A MINORITY OWNED ENGINEERING AND SURVEYING FIRM 7-L DIINDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1 " = 40' NOR 0 40' 80' KI TUDIO I ARCHITECTU ARCHITECT EVOKE STUDIO I ARCHITECTURE 401 FOSTER STREET, SUITE B1 DURHAM, NC 27701 T: 919.495.6079 CIVIL ENGINEER JC VVALLER & ASSOCIATES, PC 7-L DUNDAS CIR GREENSBORO, NC 27407 T: 336.697.2637 LANDSCAPE ARCHITECT REVINGTON REAVES 1250 REVOLUTION MILL DRIVE, SUITE 143 GREENSBORO, NC 27405 T: 978.793.2297 STRUCTURAL ENGINEER MMSA, INC. 30 PATEVVOOD DR. SUITE 100 GREENVILLE, SC 29615 T: 864.331.1201 MEP ENGINEER DEWBERRY ENGINEERING 2610 MCLIFF RD, SUITE 410 RALEIGH, NC 27607.3073 T: 919.881.9939 F: 919.881.9923 NC LICENSE: F-0929 AUDIO VISUAL KONTEK 318 HOLLAND ST DURHAM, NC 27701 T: 919.680.4321 LIGHTING GLIMMER & GLOW ARCHITECTURAL LIGHTING 4711 HOPE VALLEY RD, SUITE 4F-611 DURHAM, NC 27707 T: 919.425.8945 FOOD SERVICE KRM FOOD SERVICE DESIGN & CONSULTING 9116 LANIGAN STREET CHARLOTTE, NC 28277 T: 704.724.1045 SPECIFICATIONS G2 SPECS, INC. 3301 N HAMMOCK DUNES VILLAGE POINT LECANTO, FL 34461 T: 704.609.2174 COST ESTIMATING HARRISCOST PO BOX 14979 SURFSIDE BEACH, SC 29587 T: 864.307.0021 CONSTRUCTION MANAGER LECHASE CONSTRUCTION 324 BLACKWELL ST, SUITE 1200 DURHAM, NC 27701 T: 919.688.5300 This tlrasrmg is the properly of EVOKE Studio Architecture, and is not to be reproduced or copied in whole or in ad. It is on to be used for the project p p p N pl and site specifically Idenlhled herein, and is not to be used on any other project. It is to be returned upon the nritlen request of EVOKE Studio Architecture. 0 2022 by EVOKE Studio Architecture PROJECT SEALS F°0000000 � ° � E s s i °°°°ti�� 0 o0.p o oa SEAL �' - 5 o- ^,0000G I N o00o P \�\ 1��1/ oo°o°o0 \V CI I I►������\112012022 •8'pS •'•s��''• �.. P Rq • ,!9 �Q- C) Uf SEAL •'•.C-3934 .•' 0 0 PHASE: DATE: ESA NO.: MASS GRADING PLAN ELM GROVE TOWNHOME ASSOCIATION, INC. 4024 S. Roxboro St. (Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 324.63 INV IN (E): 314.93 INV OUT (W): 314.71 TOP: 325.86 INV IN (W): 313.88 INV OUT (S): 313.73 TOP: 322.89 INV OUT (W): 316.30 0 IT Q o IF �V oQoo Z Q 2cy )OQo aCID INV=295.61 Q= Qm TOP: 320.59 ---- INV IN (S): 304.94 INV IN (N): 305.09 INV IN (E): 305.16 INV OUT (NW): 304.69 TOP: 318.82 INV IN (E): 308.87 INV IN (S): 308.87 INV OUT (N): 308.82 TOP: 317.99 --- INV IN (E): 309.79 INV OUT (W): 309.39 MATCH -LINE SEE SHEET 202 / • � I � II / I / t 2� i // - 15 /%J< -�_-' �//// // 11 Il ; I�' / I 3°3 \ \ \ \ 334 // � ��'/ QAK(#T5 / \ \ �335 \ \ �/ / /� // �j/ / / 32 i ti� / II -Ili JI\ \ / ��/ / I 1 �' I I ► I ,' , 1 \\ - `�\ _ J I r101 (0, 10. Ae�FF -- /14" P P R 1 14A - �/ �° ( 201 \\\\ \ \ \ \ \ \ \ 3 - / ///III✓ / � ) \� \ 1 I\\\ \ � / � I 11 //✓/ IlJ/ // I l ) r / 1 \ \ / J 1 / // J/ N� J/ c/�J� /// / 2�� )/'\ \ \ \ \ \\ \\� \\\\ \\ \ 1 I I I I \ \ I �1A \ CE AR( 14I P /pbV j �� �`� I I 1 1 I /� 1 I \ \ / I \ \ '� \ /�-� ' , l I 1 I I 1 1 113 P11PL�R(#1 �2 N �Fi33 ( 1 III I 1 , I I I I I I wl I W I \W I M \ \\ \\ II I I -C l I l l /1 I l�to�1 I I I o I cn w \ \ \ / -� l I M I / // / o C= \� / / 1 1 \ \ \ \ \ ,I I I I l l l 1 .• I I I I/ l \\\ N \\ \\\ \ \ \\\\\\v\ 5 I I \ \ \ \\ \\ 11 \ 1 \ ) 1 /) 30 3�3 I I 1 \ I I /'� \ \ \ \ \ / � � \ \ l / l 1 I rl I J A � $ 31 \ 1 1 111 1 / / 1 15//�A 1 5 JIM11 /cp _ _ �\ ^) 1 1 / / \ \ \ \ \ \ \ > / \I �\ \\ - IIII I)) / r/f I s�-6 / / �// //� / / / 'or / /�I f 11 \ 1 /) /l / / / I ( ( `�� \ \ \ I r \'\\ \ \ \ \ I \ \ \ r s: I / \ \ Ill / \ l \( I �^ �\ I ) o\\ \ �� r l / 0316- / 6 RO 1 �� < 1„\11 /1111111ff�Jv /CA w 1 , / Ico of `I4// 8/ I / I)) %� s BE 19 // \0 l/ // / // I I I AI 7 30 (# ) Iq \ w III I I /- 1 I I I 01 ICE \1 I I I r k�\ - _ r J' , I I I\� � `l /j /f // ///� / / �� � �%� �11017 „ r II> III - //X/iIi%��)��\ �//I/ / o ^I/l� - 1 N i i� I IN 336 GRADING LEGEND - - - 821- - - EX. CONTOURS 810 PROP. CONTOURS MAJOR SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS MATCH -LINE SEE SHEET 200 GRADING NOTES 1. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 2. INSTALL INLET PROTECTION AROUND ALL YARD, CURB AND GRATE INLETS WITHIN THE PROJECT LIMITS. 3. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL PRACTICES AND MEASURES IN ACCORDANCE WITH THE APPROVED SEDIMENTATION CONTROL PLAN AND CONSTRUCTION SCHEDULE. 4. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND FILLED, AND PRESERVE IT FOR USE IN FINISHING THE GRADING OF ALL CRITICAL AREAS. 5. SCARIFY AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 INCHES BEFORE PLACING TOPSOIL. 6. CLEAR AND GRUB AREAS TO BE FILLED BY REMOVING TREES, VEGETATION, ROOTS OR OTHER OBJECTIONABLE MATERIAL THAT WOULD AFFECT THE PLANNED STABILITY OF THE FILL. 7. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER MATERIALS INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS. 8. DO NOT INCORPORATE FROZEN, SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS INTO FILL SLOPES. 9. PERMANENTLY STABILIZE ALL GRADED AREAS IMMEDIATELY AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE GRADING PLAN. APPLY TEMPORARY STABILIZATION MEASURES ON ALL GRADED AREAS WHEN WORK IS TO BE INTERRUPTED OR DELAYED FOR 30 WORKING DAYS OR LONGER. 10. CHECK ALL GRADED AREAS AND EROSION AND SEDIMENTATION CONTROL MEASURES ON A WEEKLY BASIS AND AFTER ANY HEAVY RAINFALLS. PROMPTLY REMOVE ALL SEDIMENT FROM DIVERSIONS AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUTS OR BREAKS OCCUR, REPAIR THEM IMMEDIATELY. 11. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAWED UNLESS INDICATED OTHERWISE ON THE PLANS. N A��` S U 2 0 SI TE 0 Y O U JULIETTE DR. Vl CI NI T Y MAP- SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Waller SL Associates, PC II SITE DEVELOPMENT - INFRASTRUCTURE- PLANNERS- SURVEYORS II l A MINORITY OWNED ENGLVEERING AND SURVEYING FIRM II 7-L DNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1 " = 40' 0 40' 80' KI TUDIO I ARCHITECTU MASS GRADING PLAN TOP: 286.07A INV IN (E): 277.80 �P ELM GROVE TOWNHOME ASSOCIATION, INC. INV IN (SW): 277.59 3920 S. Roxboro St. (Common Area) INV OUT (NE): 277.58 ZONE: OI PIN 0729-01-19-4515 TOP:287.07R " \ QF' off° DB 6460 PG 794 �P b G g3 PB 162 PG 166-178 INV IN SE :278.22 s' 8S6, off' 6� INV OUT(NW):278.22 �v s��� � G�� � � TOP: 287.19 INV OUT (NW): 279.09 \ �� Q�, P \ cp \ \\ \ -1rr�H(k2'55) /\ IN i /N \ \ $ 1 No \ / ✓ �� 12'_DBL _VA PtE*�60)�\ TS 000 \ I /ru FOR \ /�� /NE(#26 I ///�3� 1�IRC 261 5 bAk 111�IIIGUM(2. 4) \ \ \ \ \ \ \ \ H \ 9 / /////j/ j j/\\ \v\ \ /�/l///\ \ \ \ \CD \ \ x s o o i /iii�i%� \ IO \/\\Illl \\ \ \ \ \ \ \ \n't \ \ w \ 1 1 \ o \ \ o \ TOP: 315.18 \ \ \ INV IN (SE): 305.88 \ \ W /i // �i/ice / \ y2" MAPLE2 7)/�\ P1PIE(269� S \ \ \ \ \ 1 INV OUT (NE): 305.78 T \ NN TOP: 314.23 \ \ w I w \� \ \ \ \ 1 I I I I \\ o/^� �\ \ O j / //// // \ \ 1 \ \ INV IN (SE): 306.23 \ \ 1 I � 31� \ \ II \ I \ INV OUT (NW): 306.21 a. / I co / Q P LA \� o TOP: 313.09 1 1 /� /��/ // d INV IN (SW): 306.84 I \ ✓ 1 \ /// // / /_ �/ INV OUT (NW): 306.84 3/ �_-`7 / `'�?G I S� / I s,00s� � � I �- L 31 15 �/ / / � ' - \ I -. / i / I / / / I \ ` ` \ \ \� )///�✓ /� \ w 37 A)' \\ TOP: 323.38 INV OUT (SE): 319.03 TOP: 321.60 INV IN (NW): 317.17 INV OUT (NE): 317.08 ELM GROVE TOWNHOME ASSOCIATION, INC. 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 DB 6460 PG 794 PB 162 PG 166-178 I I 0 G� M � I � y / � f Li \ l \ 1 \ \ \ \ \ \ I I Ln I w /I WYN �E OD \ \ \ \ cu I )E 15' HDPE TEMPORARY STORM PIPE (THE // CONTRACTOR SHALL ENSURE WATER IS DISCHARGED CAPTURED NTORTOM SKIMMER H LE AND / / / // ��' / / s /, j, ✓ \ M BASIN. / / / / / 4r'01 co / 61 lb 3,30 33200, / I ,hi I �' II f I I I / / GRADING LEGEND 320 j / /IV I // </ / /332/� °_-- / - - -821- - - EX. CONTOURS 810 PROP. CONTOURS MAJOR SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS MATCH -LINE SEE SHEET 201 N 10 S U 2 0 Q SI TE Y O U JULIETTE DR. Vl CI NI T Y MAP- SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 if Waller SL Associates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A NIINORFLY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DTTNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 GRADING NOTES 1. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION. 2. INSTALL INLET PROTECTION AROUND ALL YARD, CURB AND GRATE INLETS WITHIN THE PROJECT LIMITS. 3. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL PRACTICES AND MEASURES IN ACCORDANCE WITH THE APPROVED SEDIMENTATION CONTROL PLAN AND CONSTRUCTION SCHEDULE. 4. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND FILLED, AND PRESERVE IT FOR USE IN FINISHING THE GRADING OF ALL CRITICAL AREAS. 5. SCARIFY AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 INCHES BEFORE PLACING TOPSOIL. 6. CLEAR AND GRUB AREAS TO BE FILLED BY REMOVING TREES, VEGETATION, ROOTS OR OTHER OBJECTIONABLE MATERIAL THAT WOULD AFFECT THE PLANNED STABILITY OF THE FILL. 7. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER MATERIALS INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS. 8. DO NOT INCORPORATE FROZEN, SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS INTO FILL SLOPES. 9. PERMANENTLY STABILIZE ALL GRADED AREAS IMMEDIATELY AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE GRADING PLAN. APPLY TEMPORARY STABILIZATION MEASURES ON ALL GRADED AREAS WHEN WORK IS TO BE INTERRUPTED OR DELAYED FOR 30 WORKING DAYS OR LONGER. 10. CHECK ALL GRADED AREAS AND EROSION AND SEDIMENTATION CONTROL MEASURES ON A WEEKLY BASIS AND AFTER ANY HEAVY RAINFALLS. PROMPTLY REMOVE ALL SEDIMENT FROM DIVERSIONS AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUTS OR BREAKS OCCUR, REPAIR THEM IMMEDIATELY. 11. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAWED UNLESS INDICATED OTHERWISE ON THE PLANS. Know what's below. Call before you dig. SCALE 1 " = 40' 0 40' 80' KI TUDIO I ARCHITECTU MASS GRADING PLAN =LM GROVE TOWNHOME ASSOCIATION, If 4024 S. Roxboro St.(Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 325.53 INV IN (S): 318.78 INV OUT (N): 318.76 GPS#2 ELEV=327.14 U Z zo a < a 0 E � 'n � E .1 01, ��� j �O Uzi = a- oI c°m0 � � 3: CLiirn000 0 oZ�`am w x00m O a 0m _ a- Z �.r1 O O 1.-O xm a TOP: 340.08 24° INV OUT (W): 332.43 & c TOP: 335.78 INV OUT (E): 330.23 - TOP: 338.06 INV IN (E): 330.09 INV IN (NW): 330.04 INV OUT (N): 330.04 TOP: 339.26 INV IN (E): 331.41 INV OUT (W): 331.06 24" CURB � & CUIYER- -�- sly THAXTON HOMEOWNERS ASSOCIATION, INC. 5002 Thaxton PI.(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0988 w of a U 0 DB 5856 PG 853 w PB 156 PG 289-297 0 U Co 4" HOLLY 8" SYCAMOIY,�TJ J "19 I /r 22. I a 0 323 - I- - w a- a - 324 I _ � - 325 �25 � m => -I326 - 327 0D, � w JZ o a -L28 330 - 329 _ -�30 D ,.1( - 331 - O UM°f� J Cp 00 Ld J nj (k 00 / � / p5 ///M 5 / �(,� � / '/nr5 3/ / ... 3�m ` _ I tx� / n ��� Uv I3 I /-L, R �Y011 OD THAXTON HOMEOWNERS = ASSOCIATION, INC. 4305 Brynwood Ave.(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0526 GPS#1 DB 5856 PG 853 �ELEV=347.97 PB 156 PG 289-297 EROSION CONTROL NOTES I I I I I i r- I MATCH -LINE SEE SHEET 301\ 1eA RE 30` i / /��, 7/ )///- / / s � / / l I�iB€ )i/%/ o STOCKPILE AREAsolL \.352 / Y �I SYZAO(D E(�5 kv/ / / / / / / l l 3s2 \ M / l 1 1 I I M I I 11 l 111 l l l l l / l/ l / / J A�8 45 MAPLE(# YC✓ANPO E�#) / / / / / l l l I l / / �// \7t' OA i# / / / / 1 / �w I l / / / / l/ llll l/ l / / l) /` // h// / /PIN 3): U, l l I of � 1 / /`lllllj/ I\\y� gyp/ / // M o// 1/Il�Ill�lI/S)rgAqRt(#8) \ CONCRETE 7 ////% /WASH -OUT /1 AREA 1 _ (9)/ / / / / / / / / / / \ I I I I / / / / / / / / / / / / / I I I I I I I 1 �-�)f� I l < / / j ) / / MPP/ 4/( #// // // / �/ / / / I I I I / /l /lIl/� (/ �0'/ D L// / / K/ / ( #/ %/4///J11NI /, ST-11/9ATOP ELE: 330.50 2 5' SKIMMER BOTTOM ELE: 326.00 )SKIMMER ORIFICE / / ER:/j 4 SURFACE AREA:3,000 SF 'SEE DETAIL SKIMMER / VOLUME: 5,814 CF SIZING CALCS /�YRE�#�13���� I f\ \\\ 11\( ���� 1I n\���II/ ��\�//�QIAI�(#A / / //// / �) I I I I I I I I I 1 I 1 Ill 1 (I ) I l I I \ I / / l-Il . 309 �3, w "f \\\ \ / //� \( ) l) I f / l / / / / / / / ,3`' I I I I I 1 1 I Ill 1 I 1 1 1 I I I / / / / ENGTH(La)=s��/ o l l // / I I I I I I I I 11 Il I lII l I 1 I WIDTH w =9.25' 1 L�`'/ o w 1 �/ I O l� l r\ // \ 1 / l I 1 I I ( 3 I I ll�,\\////// R'� I I I I I ) I I I I I I I Ill�r�l �IIII�I I IIII I /D50=9 l� / l/ // l I 1 1 1 I(r 2//jl IoDIlII/l`'<11 l I I I \ I ICI 11121 I lllll f7\\ \\\ iLilt�sj �` \ / I 1 1 I l / / l / l l l 1 I I I I / J4� q��'>i / \ \ �I \ \ \ 1 4� o�K 1b5 \ \ \ ( Id I I I IIII ( / / / /// / // // / / / / � / / / / I I \ �%�J�\ / `� \S \� �\ \ � � \ \� > \ \ I I 1 III I � I 1I 1I/Ill IIII ���� ��? r��#/ 1 �g'1 // / / /� /✓// / --\ II II 1I 1 I � 1 1 l 1 I I��II III I \ �2 M � -%\ I III\ r / \ \ -_��-✓-�/ / 3/6 o lII � I 11 IJ I II 11 I II I1I1 1 I IIIId I1 II1� II II II I / III I1 IIII� lI II1II I IIII 1III / lI I' /I11 / 1ll /1 °/1 1-I / 1 /1I Ii1I1 11 M1 SA\I110 0rob 11,1 'GUM \\ \\ \ J0 5o 113 bAj\(68)STREAM BUFFER EASURED FROM TTOP OF BANK Q 14"\/\ O\ \A \K\� \(\#�i U 4 w 1 III I\l /R arG UFKER- �I11 50'`;T�' T �13�/GIQM(#�65 a. I�MJ FF�OM/�/- I//�,/ / / �/ I�n Iw I I 7'I f�IAL 2 / a;; " SINE \III/BAN / - _ _ -4e PeP-LA III1111111 / l / / / / /��01 1 1 /�llllOI I I wIIIIof IM1 l )/ (�- IIIIIIIIIII / / // / /, / / // // l� I III I I Ill I I / �, I��/ // / / / /� /�� TR�(#�9Y - IIIlolll�Il\1�111 �1 //�� �1 12"IOAK6 l/% / / /� ���-_--_ - _ I IIIIII I In / / / / / / / / / / / 1 1 1 l �L ( / - / 11121111`Y'1/// // // //l 1 to / )1 I / / / / / / / l / / 1 // / / / / / I I I I I �/ ) 15" K Il //`�/� 11 I IIII / / / � / / / / / / / / / / / f / / / / / / / III 1 1 \ qA (#q�\ III I 1 � " cK RY 7 Cl) I ///%�/ �I �# ° l /�,JI��I I 1 1 I I % 1 / 11 o1, SIN #155> \III SEN 11 1 // I 16" IBE 712 ! � GUM Do) ( 1 �l I I I / / / 14I 0 K(#�16)- 111 I I I •_---� / �� >l 1 33///�-- 1 22" R6E( 5" obK 7 \ 1 I l I I I ` /// (I# 4) 1 4" ,OAKJ#77� cH(#57.7� / F 1 5'I 14J ' "l 1#I 9I' l I ��1j2J�"• /�// / / 15' POPLARg1) 15 PAK#71I wL, p / IA2 11I (0#» 6AK0 I ICI f 1}" GrrM(h .�P Rg3�1"OA� 13A/ D / �1'U 1 L#5) UTILITY EASEMENT 8 (#N �/(\ \ I\\ \I \\0 1I 1 (I/ / K o 1BE/2 INC.CTE SOUTH / 1 11 U ( "/A .. \\ \ \ \ \2b \ O�8O�( 38�PG 92 0 M7 / E /2PL /// _ 3(1 \ \\ 00 rn \1 1 1 / / // / IBEES'� / /1k kll(#5�1"\Pi�NF�( a'� CH( )\ \ \ \ \ \ 65' MASS / / I I ° / l l \ I %/\ ) I I 1 l \ \ \\ \ \ \ \ \ \ 1„ A0 / \\ 1 349.471 IN I / / / / BRADING �� G �� / / / /� 2d" POPLIA (# 4) / L //�0/ PyNE(#481 / I /� \ A \ I I 1 1 1 1 �4'\ E ( g \ / I LED "X'% N ET� P�D / UFFER < / N 3 �/ / J / /1/ / MA'L#40)/ / / l M 24" POPLAR(#54) \ '� �{ \ \ \ \\ \ \ _�h,�,\ 1 O�K( 9) I IPF 0.75" AD \ \ \ \ \ \ \ \ �MUNI(> N CA�3INETS/ / / \"� �\ ���\l ll \I`J / / l l Z2/ c� I \2C� jl J N CON E A / / \ � \\�� �\ \\ 2 NE / / / I�(#' 5) \ \ - / - - \ \ \` /' (# l 13"'OAI�(# 0) _ MEHDI MOHAMMAD G. A. ADELI \ �\ n _ 1�C� \\ / /I 3" /PO,LAF 41 // rr \ i (�F -5 /Atr_ ///� 7 / n \ �� K�S\\ \\ p� i! / / (# %I I 0 4401 Dolwick Dr. \ \8 \ I �5 hh/ /g2 / mho ! F B T Nko 1729.67'- �3� \\�'R \\ \\ \\ / �2 / / �j ZONE: PDR 3.44 \\ \ / � � 3� / % / CYNDI CHADILI 9 \O\ \�\ \� , \\\\�1\1 ( / / ;�� ooh I PIN 0729-01-17-9723 c� °°a - , / //// / / 4401 Nightfall Ct. S \\\ ��' I� DB 5302 PG 789 \� _ o Z 0 00 ///, // ZONE: PDR 3.44 SFO \\\\ �1\� I I III a'j 1 NE � j j �° PB 141 PG 171-175 (LOT 30) �z N PIN 0729-01-17-4762 ANN W. HARRIS II"IIIII IIII I II1� # G�v1 illPF 0.75" GEOFFREY C. ORME-EVANS o a I � I DB 5111 PG 570 II III II I I HOPE VALLEY FARMS NORTH KAEBAH ORME-EVANS I � - RYAN S. HARRIS e Z Q o `� 0 CINDY H. NG PB 143 PG 40-43 (LOT 58) 4403 Nightfall Ct. I I I \ I I III 1 OWNERS ASSOCIATION, INC. 4402 Dolwick Dr. 5 LL 00 0 Oaf ! 0 0 GODOGREDO T. NG ZONE: PDR 3.44 III III I 1 1 652 Edenberry Dr. (Open Space) ZONE: PDR 3.44 DANIEL BIRMINGHAM U) a_ O qr a_ 4402 Nightfall Ct. PIN 0729-01-17-5649 I I I I I I 1 ZONE: PDR 3.44 PIN 0729-01-17-8740 DEBORAH BIRMINGHAM w 0 1 11, ZONE: PDR 3.44 DB 7511 PG 47 Z N N PIN 0729-01-17-3699 DB 6228 PG 965 111 PIN 0729-01-17-6598 PB 141 PG 171-175 LOT 31 4403 Dolwick Dr. 22" r- ') o o m DB 2780 -1 271 3PB 143 PG 40-43 (LOT 57) DB 2644 PG 595 ( ) ZONE: PDR 3.44 g w N o m PB 143 PG 40-43 PIN 0729-01-27-0609 w= a w _Z o_ PB 143 PG 40-43 (LOT 59) DB 6458 PG 879 = O (o ° PB 141 PG 171-175 (LOT 29) I O 1. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL REQUIREMENTS AND SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS IN THE LATEST EDITION OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL PERIODICALLY INSPECT ALL EROSION CONTROL DEVICES AND PERFORM MAINTENANCE AS NECESSARY. CONTRACTOR SHALL INSPECT ALL EROSION CONTROL DEVICES AFTER EACH RAIN EVENT. 3. CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AS DIRECTED BY SITE ENGINEER. 4. CONTRACTOR MUST TAKE NECESSARY ACTIONS TO MINIMIZE TRACKING OF MUD ONTO AREAS OUTSIDE OF CONSTRUCTION AREAS. THE CONTRACTOR SHALL IMMEDIATELY REMOVE MUD/SOIL FROM AREAS OUTSIDE OF CONSTRUCTION AREAS AS REQUIRED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE PER DETAIL 3/C400 SILT FENCE W/ STONE OUTLETS EVERY 50' SF SF PER DETAIL 4/C400 & 3/C401 E INLET PROTECTION PER DETAIL 1/C400 TD TEMPORARY DIVERSION PER DETAIL 2/C400 BF SEDIMENT BASIN BAFFLE PER DETAIL 7/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. N S U 2 0 Q SI TE Y 0 U JULIETTE DR. VI CIloll T Y MAP SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Wa[[er B�.Assoeiates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DLTNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF EVERY RAINFALL EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND ENVIRONMENTAL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND NPDES NCG01 PERMIT. MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. 3. CONTRACTOR SHALL CONTACT THE SITE ENGINEER, NCDEO AND THE CITY OF INITIAL DATE: DURHAM CONTROL INSPECTOR TO ARRANGE A PRE -CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE ACTIVITIES. INITIAL DATE: 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY INITIAL DATE: FOR THE CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT 11.APPROVAL BY A REPRESENTATIVE OF NCDEO WILL BE REQUIRED PRIOR TO CONTROL MEASURES. REMOVAL OF EROSION CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. THIS INCLUDES BASIN WALLS. 12.UPON SITE STABILIZATION, CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE SITE INITIAL/DATE: ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 13.FILE A NOTICE OF TERMINATION WITH NC DEC) TO CLOSE THE NPDES NCG01 PERMIT 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100. 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE OR NO MORE THAN 21 CALENDAR DAYS FOLLOWING COMPLETION OF EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE CONSTRUCTION. WITH THE PLANS AND SPECIFICATIONS. Know what's below. Call before you dig. SCALE 1" = 40' 0 40' 80' U K TUDIO I ARCHITECTURE EROSION CONTROL PLAN(PHASE I) ELM GROVE TOWNHOME ASSOCIATION, INC. 4024 S. Roxboro St. (Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 324.63 INV IN (E): 314.93 INV OUT (W): 314.71 TOP: 325.86 INV IN (W): 313.88 INV OUT (S): 313.73 0 Q =�20 F o co /ov co O p o O� o� "-�Qpo o OWN pco INV=295.61 2= Qm °\ " STSwR 30 ° _ II TOP: 320.59 ---- INV IN (S): 304.94 INV IN (N): 305.09 INV IN (E): 305.16 INV OUT (NW): 304.69 TOP: 318.82 INV IN (E): 308.87 INV IN (S): 308.87 INV OUT (N): 308.82 TOP: 317.99 ---- INV IN (E): 309.79 INV OUT (W): 309.39 11 r) 11 MATCH -LINE SEE SHEET 300 EROSION CONTROL NOTES MATCH -LINE SEE SHEET 302 352/2,h I /I�j� , ✓J \ �lir'/ i \� ✓// //// \ /-/ 11/1 � \ _ 63 //I III LENGTH La =8' ccjj/ 3DO=3.75 //// `\ \ � / /////// / / / / /// // ,II 111///JAI ( ;/ / / / / WIDTH(W)=9.25 3S0 � // / / // / / / / ll l � l /I 1(1 /// //3 cam(#2s9 26 \ \=1' GUM(#290) Illy / / _--- 03- �/i o/ 3 I� ✓/ / 2.5"SKIMMER Tt) / \� / SKIMMER ORIFICES /Q//p DIAMETER: 2.0" \\ \ \SEE1DETAIL ' SKIMMERk aD WO SIZING CALCS / RIB OUI Iru j��/// TOP ELE-S BOTTOM ELE: 295.00 \ \ \\ SURFACE AREA:3,750 SF \ \ \ \ 1 /� N / (� I VOLUME: 7,943 CIF \ \ �12"\IC\\QQRY\(#29�� \ \ \ \ \ \ / / , / / \ / / \� / /I / ' / \ /\ \ \ \ \ \ \ \ 344 12 \TE(9� ` 17�' OAK 2 v3) ` \ \ \ \ \ \ ` \ \ `3K'<� / / // / / / / / f (I f ` < / < < / ) \ (# \ \ \ ` \ \ \ \ \ `\ \� \� l\ \ \ ED�R((#AK #2 5)\ ` \�, �� � iL/O�K(# 97, 1 C�96)\ I, � \ q, / •� \ \ \ 15 CEPAR(W14 ) � ��,\ \ J 1 ) 1 1 , . cu (#s)1 1 I I I\ J I >/ 113 PopId/R(#12 / 340.42 / // I I I I\ \ \ \ 1\/ii �G \ 1 I I I c_ X ( ( l 1 1 I\ 1 1 1 1 1 I I l l \ 1 s \\ 11 1 1 I I I I I 1 \ NOOLD / � l II 2 5" SKIMMER I L I W W SKIMMER ORIFICE I IOD O \I I U DIAMETER:1.50" / I I �_;j\� \\ \\ \ �, / ( I I SEE DETAIL SKIMMER I I I I Rti \ \ \ \ \ \ 1 `< �� I I 1 I oI I I J J // ^l l I / l l l / / I / SIZING CALCS LJ l \ I I I I '� \ \ \ \ 1 1 \ \ \ \ I /i //� - �Q/ / / / / ( o -\s00� , ; o /vo\ e 3os ZR 040 ' •I I I I I I I III \ \ 1 \ 1 1 1 I 1 I \ ` � I ' I I ` 1 \ I I ` \ 11I/\� ` \ \ \ \�l ; >l _� \-\ '°o2R 1 1 I ` \ \\\,l►,I /� �_� 15 /AA 1 ` I I) / �_ \ \3.r0 / l \ / 1 T ���� 1 W 1 1 1 / \ \ \ ` \ \ I I L \ \ \ \ I� \ /r/� \ III 1 I / < 1 / 1 \ 325 X�/�/ �- � s -6 328 = 326 \ \NN l� /^ � � (� /u� \ \ \ f r \ \So, 326 324 ,ff Q \ /_ \ \ \ //�/ /I���� LL/LLB / / / / / / / l � � / Q \ \ � \ \ \ \ \ \ \ �� N �ro / /� �` /s/ BE ell(#1,29) \ //2/�30/ v/ 7 /�/i \ oI 9 \ \ �, I I ( , I I , , / / // / / / \ 1 I I 1 I 1 1 , I \ \ V/ l � I I I W I 1 I I I I I LAI 0�R f k /� p\ \ I 11 1 1 1 � I \ �- 1 OEI I qAQEk#P) 1 1/ l l I l I 1 \ I \ 1�<<`1I1 CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL REQUIREMENTS AND SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS IN THE LATEST EDITION OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE PER DETAIL 3/C400 2. CONTRACTOR SHALL PERIODICALLY INSPECT ALL EROSION CONTROL DEVICES AND PERFORM MAINTENANCE AS NECESSARY. CONTRACTOR SHALL INSPECT ALL EROSION CONTROL DEVICES AFTER EACH RAIN EVENT. SILT FENCE W/ STONE OUTLETS EVERY 50' SF SF PER DETAIL 4/C400 & 3/C401 3. CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AS DIRECTED BY SITE ENGINEER. 4. CONTRACTOR MUST TAKE NECESSARY ACTIONS TO MINIMIZE TRACKING OF MUD ONTO AREAS OUTSIDE OF CONSTRUCTION AREAS. THE CONTRACTOR SHALL IMMEDIATELY REMOVE MUD/SOIL FROM AREAS OUTSIDE OF CONSTRUCTION AREAS AS REQUIRED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. E INLET PROTECTION PER DETAIL 1 /C400 TD TEMPORARY DIVERSION PER DETAIL 2/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER & ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. N S U 2 �o Q SI TE Y O U JULIETTE DR. Vl CI NI T Y MAP- N. T.S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Waller SL Associates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRNI 7-E DLTNDAS CIRCLE EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCG01 PERMIT. 3. CONTRACTOR SHALL CONTACT THE SITE ENGINEER, NCDEQ AND THE CITY OF DURHAM CONTROL INSPECTOR TO ARRANGE A PRE -CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE ACTIVITIES. 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY FOR THE CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT CONTROL MEASURES. 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. THIS INCLUDES BASIN WALLS. INITIAL/DATE: 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100. 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE EROSION 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER EVERY RAINFALL EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. INITIAL DATE: INITIAL DATE: INITIAL DATE: 11.APPROVAL BY A REPRESENTATIVE OF NCDEQ WILL BE REQUIRED PRIOR TO REMOVAL OF EROSION CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. 12.UPON SITE STABILIZATION, CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE SITE ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 13.FILE A NOTICE OF TERMINATION WITH NC DEQ TO CLOSE THE NPDES NCG01 PERMIT 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 21 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1" = 40' NOR 0 40' 80' KE TUDIO I ARCHITECTUR EROSION CONTROL PLAN(PHASE I) 160d NAIL 1 ELM GROVE TOWNHOME ASSOCIATION, INC. 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 DB 6460 PG 794 PB 162 PG 166-178 TOP: 286.07 P� ze�o INV IN (E): 277.80INV IN (SW): 277.59 �� 8�INV OUT (NE): 277.58--_ 9 �\ TOP:287.07 INV IN(SE):278.22 INV OUT(NW):278.22 TOP: OUT (N I ,../'�// \ � .off. �r ./ \ r�\ P/�X r_ INV OUT (19 279.09 \ �rr \ , ✓ �� ��42'_DBL _ APtE.#�6A�\ \ � /I' d ('~)- �\ /� 1 i \ 424--g)\ b \ N // // r o\canTS �9p� \ \ i GO��Ez ° \ �\ ° I ro / i �/ E(#2fi I / r3`- QIIRC 261� \ 5' bAk 1 I 1 \ - 7 Q�- I /ro // /i %i ii' \ ))jpI1IGUM( 2. 4) \ \ \ \ \ \ \ I I l o `a ,%j, �j ,�%\ \ \ \ \ ` / \ 18" `AAI�( 26\3)\\ \ \ \\ \ 11 O o /�- i�5i� �� \ � `\\ � \ � \ \ \ \ \ moo \ 1 \ \ 1 I' I TOP: 315.18 INV IN (SE): 305.88 �\ w // /i ` PNE( 266) y2\ MAPLE(2 7) INV OUT (NE): 305.78ii� NV IN (SE): 306.23 \ \ \ �/ \ 11 w I o /317 0 INV OUT (NW): 306.21/ co \w �� � � �/ 3�0 � \ \ \ \ \ / �• /III \ 1 \ \ 1 \ \ \ \ \ TOP: 313.09 U_ \ ( 1 1 1 \ INV IN (SW): 306.84 \ �F ` \ \ \ \ \ 1 1 1 \ INV OUT (NW): 306.84 44 L l `I lci / wi /� / �} = _ - - J / y2rr.POPLAR(#�s� TOP: 323.38 INV OUT (SE): 319.03 OD 011 TOP: 321.60 I I M eg / /% -0�- - -_ -_ _ -- \ / /\ l I I l 1 1 l l / / l l I I l IN 0 IED INV IN (NW): 317.17 I/ c�Z N // INV OUT (NE): 317.08 I I c� �/ //- 4"�K( 71) - _ '�E -75) _ _ - _ 13 MAPLE(#2'P0� ELM GROVE TOWNHOME ASSOCIATION, INC. r✓`� I / j E�#�76} - - - - - - - \ `''3� \ \ / / / / / / / / / / / / / (�� / / / / / I 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 �� <`' �.)�Q DB 6460 PG 794 I I �� '� M �/ �� 7» POF PB 162 PG 166-178 /P I I r i oQP "' % �-� \ `�--------� 3��. \ 1 I I I I I I I �/ / / / / / /� SF�1' / // l l l l c /Z o v �) 101 e� ti �P �/ // /% --- - \ "4 :02]1 / R> M� PF,�/ / / / j /j/ ��=-- ��� � 6\ \� �� C\ r / l l I / I I � l l / / l , l l / l I f I ST-4 < / / / J / TOP ELE: 315.50 //lay/ BOTTOM ELE: 310.50 _/ / SURFACE AREA:5,000 SF - 7 _ / _j / / �VOLUME: 12,502 CF 12"/MAPt/ 3.0» SKIMMER / - / L Ji\ l / / / / / / \ / / / / / SKIMMER ORIFICE DIAMETER:2.0» / % // 19L / E // / / , / \ \ J I I I / / / / / / / / / / / // / / SEE DETAIL SKIMMER \ l / l )\ / / \ / SIZING CAS NN -MAPLE.(.#-rE \\�----J // G / I 1 / /�// // //�/ r� �� /✓/ / �� / / / / \\ \ \S\\ \\ M_ MATCH -LINE SEE SHEET 301 EROSION CONTROL NOTES 1. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL REQUIREMENTS AND SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS IN THE LATEST EDITION OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL PERIODICALLY INSPECT ALL EROSION CONTROL DEVICES AND PERFORM MAINTENANCE AS NECESSARY. CONTRACTOR SHALL INSPECT ALL EROSION CONTROL DEVICES AFTER EACH RAIN EVENT. 3. CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AS DIRECTED BY SITE ENGINEER. 4. CONTRACTOR MUST TAKE NECESSARY ACTIONS TO MINIMIZE TRACKING OF MUD ONTO AREAS OUTSIDE OF CONSTRUCTION AREAS. THE CONTRACTOR SHALL IMMEDIATELY REMOVE MUD/SOIL FROM AREAS OUTSIDE OF CONSTRUCTION AREAS AS REQUIRED. EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE PER DETAIL 3/C400 SILT FENCE W/ STONE OUTLETS EVERY 50' SF SF PER DETAIL 4/C400 & 3/C401 E INLET PROTECTION PER DETAIL 1 /C400 TD TEMPORARY DIVERSION PER DETAIL 2/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCG01 PERMIT. 3. CONTRACTOR SHALL CONTACT THE SITE ENGINEER, NCDEQ AND THE CITY OF DURHAM CONTROL INSPECTOR TO ARRANGE A PRE -CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE ACTIVITIES. 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY FOR THE CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT CONTROL MEASURES. 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. THIS INCLUDES BASIN WALLS. INITIAL/DATE: 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100. 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE EROSION N 10 S U 2 �o W SI TE 0 0 0 U JULIETTE f Vl CI NI T Y MAP- N. T.S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 if Waller SL Associates, PC SI"IE DEVE1 O1-1- INFRAS"IRUCTURE- PLANNERS- SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRM D 7-L DLTNAS CIRCLE CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER EVERY RAINFALL EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. INITIAL DATE: INITIAL DATE: INITIAL DATE: 11.APPROVAL BY A REPRESENTATIVE OF NCDEQ WILL BE REQUIRED PRIOR TO REMOVAL OF EROSION CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. 12.UPON SITE STABILIZATION, CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE SITE ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 13.FILE A NOTICE OF TERMINATION WITH NC DEQ TO CLOSE THE NPDES NCG01 PERMIT 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 21 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1" = 40' 0 40' 80' KE TUDIO I ARCHITECTUR EROSION CONTROL PLAN(PHASE I) ELM GROVE TOWNHOME ASSOCIATION, If 4024 S. Roxboro St.(Common Area) ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 TOP: 325.53 _ INV IN (S): 318.78 INV OUT (N): 318.76 TOP: 340.08 INV OUT (W): 332.43 TOP: 335.78 INV OUT (E): 330.23 TOP: 338.06 INV IN (E): 330.09 INV IN (NW): 330.04 INV OUT (N): 330.04 TOP: 339.26 INV IN (E): 331.41 INV OUT (W): 331.06 THAXTON HOMEOWNERS ASSOCIATION, INC. 5002 Thaxton PL(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0988 DB 5856 PG 853 PB 156 PG 289-297 THAXTON HOMEOWNERS ASSOCIATION, INC. 4305 Brynwood Ave.(Common Area) ZONE: PDR 3.44 PIN 0729-01-17-0526 DB 5856 PG 853 PB 156 PG 289-297 MATCH -LINE SEE SHEET 305 / Z \ I \ \ SOIL STOCKPILE AREA I I \ /I/ll l�l ) I I II / / �, / /�//l /4/ I I 1 / l/ 11// / "'o 63 145" //l/f �AT 8 MAPL,(# / / / I 1 1 I 1, 11// ,l 111 rr� 'P I N EM 1'�3 o00 / / / // / LOCATION OF FUTURE N FOUNDATION/RETAIING n C / / /� WALL CONTRACTO / / / / N , /) / / , R SHALL BENCH BACK / EARTH IN ACCORDANCE WITH OSHA 14 ,�/ I I REQUIREMENTS FOR THE FUTURE CONCRETE I / / / / / /�/ I I I I I� CONSTRUCTION OF THE WALL WHICH WILL BE WASH -OUT _jS/ AREA // I 1 I I PERMITTED SEPARATELY. I I / / / / / / J 2( ST-1 I j / / / / o / TOP ELE: 330.50 / / / / 1 BOTTOM ELE: 326.00 SURFACE AREA:3,000 SF 2.5" SKIMMER VOLUME: 5,814 CF / / / j // 1 / / SKIMMER ORIFICE / / // DIAMETER:1.50" _ SEE DETAIL SKIMMER SIZING CALCS /I / v S / / // / y/�l � rI� 1 1 / l I I I / / `�'' •/, 309 )3, ENGTH(La)=8' 3DO=3.75' t I I I o II II I1 11 1 ,�1 rWl I 1l I I I l I1 I I I 1 I I IIIQI I l/( l WIDTH(W)=9.25' 3p D50=9 l/ / / l/ /, 1 1 1 1 I 1 1 1 N u, / I 121 �4\O'AK(,#1D5)\\ \ / II I \ \ SAW10 �/ / /3ti / / ) \� \ N\ 1 1 113» GUM( i '50' STREAM BUFFER \13" bAK(t68) / , I I I I I I III I l Ill I MEASURED FROM .I \ \ (f O\ TOP OF BANK 14" AK / (#1 - /_L..%4, �FRI� ti `✓ o' / / / / / / / / / I I I l I I 1 III III I / / / '' 8" TEMPORARY SLOPE DRAIN AND � 01GIQM �� 3" DIVERSION BERM PER NCDOT STD 1622.01�/ -_- _ - -46= P9P1A - i / / l / r I I I I I I I 7'/ N{A`F 2)/ l; INLET PROTECTION OPTION #2. 8" SLOPE / 22 DRAIN SHALL BE INSTALLED IN -I TR (#99j- /-o� c _ s ACCORDANCE WITH NOTE 2. \ to Liiil I\\ \ 1 `I In N 15" CIAK(#61�\11�II //��l///j 114( I YiCKC�RY�#7 co/,� / I4IN #'55) I /�- /SAd11 \II / 16 1"IBEG 712I ! GUM#56) (ENS I I 141 OAK(#lib)- / 22" 6E( ) /J l \�jF 5� OI4K 7 ( \ I / I 1 ` / / (I# Q) 1 4» AKJ#77� / 1Ni(#yK BE CH(#5-17�F � 1 e P 5'I qAw(#f 3)1 1 ��� , /�3�° 114' �1(#�9''2 I�� \ / / / 65' MASS 1229 GRADING =349.471 jLd/ i 1 LED X'j N ETe PA6 / / BUFFER 15 POPLARW71) ° 1\5 pAK #71) I I I 114" OAK( \\I� \ IIII ` \ /OAK( 4 I I 1 1 10" 6AK(�6 # �� \� \ I I I \ \ \ 1 1 1 \ f I I i9'I &PLq(#fi9� ( 31 / 1 I �L (#I 5) I // I \ �o \ I \ \ \ 1 \ \ \ III I I I r \2b"\ OQk(�8b> �1/2 MAP ��#ZUY( /12/ M PL( /T/ ( / / / 1�" f�IN�(#51 �`1�\\l I "'\Pi�\\ N ( 8 )\ \ \ \ \ \ / L 20/ PPE(#48� / I // < � � \ 1 I I ) \ �) / MA'L0) / / / I co 24" POPLAR(#54) �\ \ #4\\\8 \ \ \ / \� \</j /' /` J/ 4K(M 9)/ I /� IPF 0.75" ��MUNII I1 N CAPIN S / / 2/ 9s' ) ° \' q� 5 \ \ N ��d jRgjfE A9 / // / - _ \��� \ \\ \` / / j / / /13"'OAI�(# 0) t- _ MEHDI MOHAMMAD G. A. ADELI �5 \O\\�\ "1 \ C� l / g r \ \ _ \ �H S\\\ "\ < / / �n 3" /P06LAF (#41�j I 0 4401 Dolwick Dr. \ �� 8 �IWN F BENT N 86017'27" ,\ \ \\ O\\� / 2 / 6° / I ZONE: PDR 3.44 ` \ \ v/o 3h// // / CYNDI CHADILI \ \\ \\ \\\� / / /i.�-s�� o� PIN DB753021 PG 789 23 / a / �/ // 4401 Nightfall Ct. SS \\\\ \\\ /=:,� Z 00 ZONE: PDR 3.44 FO \\\\��\1 I I I \ I I �' \ NE # 1 �'�j .'•j �o PB 141 PG 171-175 (LOT 30) o- cn ///i // 11 II G�(1�IPF 0.75" z C -t N m PIN 0729-01-17-4762 ANN W. HARRIS \ I1 III I I I I 1 GEOFFREY C. ORME-EVANS o a� I I DB 51 1 1 PG 570 I I IIII I I j 1 HOPE VALLEY FARMS NORTH j o RYAN S. HARRIS I I I � KAEBAH ORME-EVANS a Q - � CINDY H. NG PB 143 PG 40-43 (LOT 58) 4403 Nightfall Ct I \ I I I I 1 OWNERS ASSOCIATION, INC. 4402 Dolwick Dr. LL C) a- I a- GODOGREDO T. NG U a- o qr a- } 4402 Nightfall Ct. W V i . I -t � W ZONE: PDR 3.44 N N QV).0Zr PIN 0729-01-17-3699 o No o m DB 2780 PG 271 ow a- PB 143 PG 40-43 (LOT 59) =o(o GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS Ed RTAW MI NWAT.I Nr NWTAI �E ra rN1.l n TD ZONE: PDR 3.44 IIII IIIIiIII 652 Edenberry Dr. (Open Space) PIN 0729-01-17-5649 III \ I I ZONE: PDR 3.44 DB 6228 PG 965 111 PIN 0729-01-17-6598 PB 143 PG 40-43 (LOT 57) DB 2644 PG 595 PB 143 PG 40-43 CONSTRUCTION ENTRANCE PER DETAIL 3/C400 SILT FENCE W/ STONE OUTLETS EVERY 50' PER DETAIL 4/C400 & 3/C401 INLET PROTECTION PER DETAIL 1/C400 TEMPORARY DIVERSION PER DETAIL 2/C400 SEDIMENT BASIN BAFFLE PER DETAIL 7/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. ZONE: PDR 3.44 PIN 0729-01-17-8740 DB 7511 PG 47 PB 141 PG 171-175 (LOT 31) EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCG01 PERMIT. 3. INOSPECTOR TO ARRANGE A PRE CONSTRUCTION METING PRIOR THE DISTDURBANCEONTROL ACTIVITIES. 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY FOR THE CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT CONTROL MEASURES. 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. THIS INCLUDES BASIN WALLS. INITIAL/DATE: 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. DANIEL BIRMINGHAM DEBORAH BIRMINGHAM 4403 Dolwick Dr. 22" rr- ZONE: PDR 3.44 PIN 0729-01-27-0609 DB 6458 PG 879 PB 141 PG 171-175 (LOT 29) 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER EVERY RAINFALL EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. INITIAL DATE: INITIAL DATE: INITIAL DATE: 11.APPROVAL BY A REPRESENTATIVE OF NCDEQ WILL BE REQUIRED PRIOR TO REMOVAL OF EROSION CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. 12.UPON SITE STABILIZATION, CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE SITE ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 13.FILE A NOTICE OF TERMINATION WITH NC DEQ TO CLOSE THE NPDES NCG01 PERMIT 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 21 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. N S C U 2 0 SI TE 0 Y O U JULIETTE DR. Vl CI NI T Y MAP N. T.S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Waller SL Associates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DLTNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 Know what's below. Call before you dig. SCALE 1" = 40' 0 40' 80' KE TUDIO I ARCHITECTURE EROSION CONTROL PLAN (PHASE II) w ELM GROVE TOWNHOME ASSOCIATION, INC. 4024 S. Roxboro St. (Common Area) / ZONE: PDR 4.80 PIN 0729-01-08-6828 DB 5890 PG 422 PB 170 PG 362-374 / TOP: 324.63 INV IN (E): 314.93 INV OUT (W): 314.71 TOP: 325.86 INV IN (W): 313.88 INV OUT (S): 313.73- TOP: 322.89 INV OUT (W): 316.30 0 0 (5 G o O ^� am INV=295.61 2= Qm ry SrSwR 30, ROp STSwR_ I$I TOP: 320.59 INV IN (S): 304.94 INV IN (N): 305.09 INV IN (E): 305.16 INV OUT (NW): 304.69 TOP: 318.82 INV IN (E): 308.87 INV IN (S): 308.87 INV OUT (N): 308.82 TOP: 317.99 ---- INV IN (E): 309.79 INV OUT (W): 309.39 I/ LENGTH La =8' 24" I 3DO=3.75' WIDTH(W)=9.25' I D50=9" / III, ST-2 TOP ELE: 328.50 BOTTOM ELE: 324.00 SURFACE AREAA,000 SF I VOLUME: 8,544 CF �I ' ' 2.5" SKIMMER SKIMMER ORIFICE DIAMETER:1.50" SEE DETAIL SKIMMER SIZING CALCS / I I " R�P 1 STS WR- I m/ I OD I\\ 1 `ems \w0 l0° \\ JI I ID I a � w _ � m I I Z MATCH -LINE SEE SHEET 304 EROSION CONTROL NOTES !s�_.e�!i:%ar''��iL..�1.�A Z.�it►1►�f.� AI I 336 11 111 1,17 h tx / , / // \ \ / 339 2ro NN //K/4` �335 /ELV RlI \ \\\ \ \\\\ \ // /// ///// 3 / T IN AREAS WHERE FUTURE RETAINII ARE PROPOSED THE CONTRACTOR 8 E SLOPE BACK TO BE OSHA COMPL SHALL ENSURE POSTIVE E 0 ``' 3 I I \ \ 340.42 X \ \ 1 l \ I\ \ \\ I I/ I I I w l I ,�� 1 I. w \/ \ 1 \ \ \ 1 \ \ \ \ 33� I IIIr 0\ 328 r (LA \�QNN lg cA00 /C31 ,L. I. 3Y4" I I I I I I I I // \ �,.�-- / I� 11 \ U` I f k \�r \ \ \ 41)11 \ \ J l \\ �\\ \\\� 4j ��. 11► II � I/,/ ,� I l � i i ! I ! I ! ! I i 1 1 / l i i I I I ! \\ I � 1\ \ ; \ \� w 1. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL REQUIREMENTS AND SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS IN THE LATEST EDITION OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL PERIODICALLY INSPECT ALL EROSION CONTROL DEVICES AND PERFORM MAINTENANCE AS NECESSARY. CONTRACTOR SHALL INSPECT ALL EROSION CONTROL DEVICES AFTER EACH RAIN EVENT. 3. CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AS DIRECTED BY SITE ENGINEER. 4. CONTRACTOR MUST TAKE NECESSARY ACTIONS TO MINIMIZE TRACKING OF MUD ONTO AREAS OUTSIDE OF CONSTRUCTION AREAS. THE CONTRACTOR SHALL IMMEDIATELY REMOVE MUD/SOIL FROM AREAS OUTSIDE OF CONSTRUCTION AREAS AS REQUIRED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE PER DETAIL 3/C400 SF SILT FENCE W/ STONE OUTLETS EVERY 50' PER DETAIL 4/C400 & 3/C401 Ll INLET PROTECTION PER DETAIL 1 /C400 TD TEMPORARY DIVERSION PER DETAIL 2/C400 BF SEDIMENT BASIN BAFFLE PER DETAIL 7/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER &ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. MATCH -LINE SEE SHEET 306 / 1 / 1 I I _- 3 - / ri / / / I 2.5" SKIMMER VICINITY MAP / / II \ \ - (� \� JI; / /��1 \ \ \ (/ S / / _ ° SKIMMER ORIFICE I /\j// j j%//� N. T.S. DIAMETER.2.0 \ SEE DETAIL SKIMMER 8" TEMPORARY SLOPE DRAIN AND -' / SIZING CALCS ^�Oh' I, DIVERSION BERM PER NCDOT STD 1622.01 ST-5 \ / /' / r INLET PROTECTION OPTION #2. 8" SLOPE TOP ELE: 315.00 \ \ / ACCORDANCE NOTE EIN E 2 ANCE WITH N T2. DRAI OM ELE: 304.00 \ BOTTOM SURFACE AREA:5,000 SF \ \ \ \ N N p PJJPL�4R(#1 4$� VOLUME: 12,502 CF I // � / I ///✓/�/lJ �i /may >��\ DLLsLAY 4ND \ \ \ 121 I (#1' NGE \ \ \ \ � \ \ \ \\ \ ` \ \ \ \ I I I I 4 NN PpP Rt#//4)) / \ \ \ \ \ \ \ \ \ ) ) ) 1A' CEPAR(W14) 7 � I ( � �C-1� I I l 1 13/Pf1PL,KR/(#1 2) /' // 1 ti 1 i // / ZP ^<`��/ IIII I I I I/ / ll/ I II/Illyl� / / IIII1111 li p/ IM// \\v �; 3 /%-� / I I1I1 t /X� \ \ \\\ \\ �11\ I 1 I 1 f�' OAK "00 10' \ \ \ \ \ NO \ \ \ \\ \ �1FR pF�O \\ \ \ \ W ��\\ \ 1 Ill\ 1 1 I 1 I/I (� 1 \ \\ \ \ 310 \\) 1 I11 1l // \ 15,/A 1 5 6) SI -6I s \\(\ \ MFgsTpFq i i/ \ rIro 00,2�///\ �1 r J f �\ / / / �/ ' OAK 1 raj l // / l 1 ti 8/ BE e11(#1,29) IJ I I I / l \1-� \\\� s ��irr /4� / /ll141, -11) I I I I SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 II �I /�/ili%�\)�\�/, j \ )/"X- 1� �� j /// i / / 1 l z =1(Ir' I I I �, Waller SL Associates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DLTNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF ENVIRONMENTAL 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER EVERY RAINFALL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCG01 PERMIT. EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND 3. INSPECTOR TO ARRANGE A PRE CONSTRUCTION METING PRIOR THE DISDURBANCEONTROL SPECIFICATIONS. ACTIVITIES. INITIAL DATE: 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY FOR THE INITIAL DATE: CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT CONTROL MEASURES. INITIAL DATE: 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. 11.APPROVAL BY A REPRESENTATIVE OF NCDEQ WILL BE REQUIRED PRIOR TO REMOVAL OF EROSION THIS INCLUDES BASIN WALLS. CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. INITIAL/DATE: 12.UPON SITE STABILIZATION CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS C)IRECTED BY THE SITE ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100. 13.FILE A NOTICE OF TERMINATION WITH NC DEQ TO CLOSE THE NPDES NCG01 PERMIT 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE EROSION CONTROL 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 21 CALENDAR DAYS SPECIFICATIONS. FOLLOWING COMPLETION OF CONSTRUCTION. Know what's below. Call before you dig. SCALE 1" = 40' NOR 0 40' 80' U K TUDIO I ARCHITECTUR EROSION CONTROL PLAN(PHASE II) TOP: 323.38 INV OUT (SE): 319.03 TOP: 321.60 INV IN (NW): 317.17 INV OUT (NE): 317.08 ELM GROVE TOWNHOME ASSOCIATION, INC. 3920 S. Roxboro St. (Common Area) ZONE: 01 PIN 0729-01-19-4515 DB 6460 PG 794 PB 162 PG 166-178 BM#11 ELEV=330.21 60d NAIL MATCH -LINE SEE SHEET 305 EROSION CONTROL NOTES Nv YI 1 C I_ I 0 160d NAIL 1 / �' `" c0169?0 ✓ �0 / TOP: 286.07 ` \ 4c, �F, �' INV IN (E): 277.80 ELM GROVE TOWNHOME ASSOCIATION, INC. INV IN (SW): 277.598 3920 S. Roxboro St. (Common Area) INV OUT (NE): 277.58 �/ c'8� /� / ' O ZONE: 01 PIN 0729-01-19-4515� DB 6460 PG 794 TOP:287.07 �� ,ss " 8S f�pQ °fib°GR1g35Q� PB 162 PG 166-178 INV IN(SE):278.22 INV OUT(NW):278.22 \ sT 'L 1110153'11� V TOP: INV OUTUT (N (NW): 279.09 1sr H (2�5) \�g2Ys3 \ cog i9A> 4 5\1 N 10 S U 2 �O SI TE 0 Y 0 LIETTE U JUDR. Yk 1 , 6 cw� OCINITY MAP- N Q0 ✓ / ! DBL 1aAPt \fir � 5p \ \ \ b 2 ' N. T.S. I' .o R(9P LA \ o\ 5�o P \ \ ) I / c1i TS �O /� OID \ 5,I I IRC 2 E#26 5' bAk1 I Ii"rI (f 50) 1 \ \ ' 7 Q�� I �I J ✓/ �'/ii /i/ / \ \ �)�lal'IIGUM( 4) H18»\Vp,1�(�26\3\ \CD CD \ \ \ I INo111 c TOP: 315.18 INV IN (SE): 305.88 \ �\ oW /j / / i //i \ \ \ \ PtNE(068) c,� / // // � y2" MAPLE 2 7) // \ \ \ o // / // i� INV OUT (NE): 305.78 //i � \\ \\\ \ \ \ \ \ \ \\ \ \ 1\ \\\ \\ 1\ TOP: 314.23 \ / \ \ w I o R / i 2- 3 �� /� INV IN (SE): 306.23 \ \ 1 p o /� /i// /// 1� \ \ \ \ 1 \ INV OUT (NW): 306.21/ aco NOP:313.09 IN (SW) 306.84 1 \ �� i �// / /� , 20 INV OUT (NW): 306.84 \ 37 - � U ' 8" TEMPORARY SLOPE DRAIN AND DIVERSION BERM PER NCDOT STD 1622.01 INLET PROTECTION - I „ ECTION OPTION ' / / -� \ l , _ I I \\ \\ \ \ \\ \ \ \\ \ \ \ �#2. 8 SLOPE DRAIN SHALL BE INSTALLED IN /%i/ _ _ / 7 / / / / ACCORDANCE WITH NOTE 2. �S/'/2 -7 l� �X o / I CLJ_ \76 � <vr I l / iP sPnA I � j20 \ / / / / / / / / / / 15 HDPE TEMPORARY STORM PIPE (THE PM/I Ili, / I / 11 INV316.99 ONTRACTOR SHALL ENSURE WATER IS . / / / / CAPTURED FROM THE SWALE AND DISCHARGED INTO THE SKIMMER BASIN. / //ii 32\\ _ - I I I I I I / / �/ / / / / / S'� fit' // �,l /l l XV Qj to 8„TEMPORARY SLOPE DRAIN / G AND DIVERSION BERM PER / //// j// / ( p / NCDOT STD 1622.01 INLET PROTECTION OPTION #2. 8" 320 / / �/ / / TOP ELE 315.50 % -324 - 1 / / / / / / / / / / // BOTTOM ELE: 310.50 \ / / / / / / SURFACE AREA:5,000 SF I > VOLUME: 12,502 CF RIP RAP 1 & 2 LENGTH(La)=8' 3DO=3.75' / // / 1�b, ( / WIDTH W 9.25' '3 _ _ �O D50=9")- / INV. 313.00 I' Y SLOPE DRAIN SHALL BE I INSTALLED IN ACCORDANCE ///332 / ✓ WITH NOTE 2.P er/ 1. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL REQUIREMENTS AND SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS IN THE LATEST EDITION OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL PERIODICALLY INSPECT ALL EROSION CONTROL DEVICES AND PERFORM MAINTENANCE AS NECESSARY. CONTRACTOR SHALL INSPECT ALL EROSION CONTROL DEVICES AFTER EACH RAIN EVENT. 3. CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AS DIRECTED BY SITE ENGINEER. 4. CONTRACTOR MUST TAKE NECESSARY ACTIONS TO MINIMIZE TRACKING OF MUD ONTO AREAS OUTSIDE OF CONSTRUCTION AREAS. THE CONTRACTOR SHALL IMMEDIATELY REMOVE MUD/SOIL FROM AREAS OUTSIDE OF CONSTRUCTION AREAS AS REQUIRED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE PER DETAIL 3/C400 SF SILT FENCE W/ STONE OUTLETS EVERY 50' PER DETAIL 4/C400 & 3/C401 INLET PROTECTION PER DETAIL 1/C400 TD TEMPORARY DIVERSION PER DETAIL 2/C400 BF SEDIMENT BASIN BAFFLE PER DETAIL 7/C400 SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER & ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. 15 HDPE TEMPORARY STORM PIPE (THE INV. 320 99 r / 324 I CONTRACTOR SHALL ENSURE WATER IS CAPTURED FROM THE SVVALE AND / / / INV. 313.00 / j// / / / / 2» /AP J(#/1 I I DISCHARGED INTO THE SKIMMER BASIN. 3.0" SKIMMER / / / /O SKIMMER ORIFICE- 334 / / / // / / / / // DIAMETER:2.0" / / / O 19"�IL1E(#17 SEE DETAIL SKIMMER / o �` �h I / �� h t "-MAPLE�#x68 �tihiZING� CALCS / � �'''y/l I �O �00 SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: + 17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 bah Waller SL Associates, PC SITE DEVELOPNIEN"L-INFRAS"LRUCTURE-PLANNERS-SURVEYORS A MINORITY OWNED ENGLNEERING AND SURVEYING FIRM 7-L DUNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT #21-026-274 EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE: 9. CONTRACTOR SHALL GRADE SITE PER SHEETS C200. 1. OBTAIN ALL APPLICABLE FEDERAL, STATE AND LOCAL PERMITS AS REQUIRED BY THE PROJECT. 2. CONTRACTOR SHALL FILE A NOTICE OF INTENT WITH THE NC DEPARTMENT OF ENVIRONMENTAL 10.CONTRACTOR SHALL PERFORM SELF INSPECTION ONCE A WEEK AND AFTER EVERY RAINFALL QUALITY TO OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCG01 PERMIT. EVENT OF 1 INCH OR MORE WITHIN A 24 HOUR PERIOD AND CONFIRM THAT THE EROSION CONTROL MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND 3. INOSPECTOR TO ARRANGE A PRE CONSTRUCTION METING PRIOR THE DISTDURBANCEONTROL SPECIFICATIONS. ACTIVITIES. INITIAL DATE: 4. CONTRACTOR SHALL ONLY DEMOLISH THE EXISTING CONDITIONS NECESSARY FOR THE INITIAL DATE: CONSTRUCTION OF THE EROSION AND SEDIMENT CONTROL MEASURES. 5. CONTRACTOR SHALL INSTALL PRE -CONSTRUCTION EROSION AND SEDIMENT CONTROL MEASURES. INITIAL DATE: 6. CONTRACTOR SHALL STABILIZE SEDIMENT TRAPS AND BASINS IMMEDIATELY AFTER INSTALLATION. 11.APPROVAL BY A REPRESENTATIVE OF NCDEQ WILL BE REQUIRED PRIOR TO REMOVAL OF EROSION THIS INCLUDES BASIN WALLS. CONTROL MEASURES AND/OR REMOVAL OF THE TEMPORARY SEDIMENT BASIN. INITIAL/DATE: 12.UPON SITE STABILIZATION CONTRACTOR SHALL REMOVE ALL REMAINING TEMPORARY EROSION CONTROL MEASURES AS bIRECTED BY THE SITE ENGINEER AND OBTAIN A FINAL INSPECTION TO CLOSE THE GRADING PERMIT. 7. CONTRACTOR SHALL PERFORM SITE DEMOLITION ACTIVITIES IN ACCORDANCE WITH SHEET C100. 13.FILE A NOTICE OF TERMINATION WITH NC DEQ TO CLOSE THE NPDES NCG01 PERMIT 8. CONTRACTOR SHALL PERFORM A SELF INSPECTION AND CONFIRM THAT THE EROSION CONTROL 14.GROUND COVER SHALL BE ESTABLISHED WITHIN 14 DAYS/7 DAYS, BUT NO MORE THAN 21 MEASURES ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PLANS AND CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 21 CALENDAR DAYS SPECIFICATIONS. FOLLOWING COMPLETION OF CONSTRUCTION. Know what's below. Call before you dig. SCALE 1" = 40' NOR 0 40' 80' U K TUDIO I ARCHITECTUR EROSION CONTROL PLAN(PHASE II) CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL, 3/4 TO 1/2 INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. CONCRETE BLOCK �� ` GRAVE FILTER TER TEMPORARY SEDIMENT POOL P0 - - - - - T GRAVEL FILTER 1' MINIMUM 2' MAXIMUM SEDIMENTS A WIRE SCREEN STANDARD BLOCK & GRAVEL DROP INLET PROTECTION 1/C400 INLET PROTECTION DETAIL NOTES EXCAVATE TEMPORARY DIVERSION WITH NON -VERTICAL SIDE SLOPES AND NOT GREATER THAN 1.5:1 SLOPE. STABILIZE TEMPORARY DIVERSION AS DIRECTED. COMPACTED SOIL \ -►� 2' MINIMUM �- \\ V-13" MINIMUM 6' TYPICAL CROSS SECTIONAL VIEW 2/C400 TEMPORARY DIVERSION DETAIL FLOW z 0, H Q 00�=z w¢¢LL= ¢U OC �=~zw LEI O J OOrn¢ Z ao 0 0 p� oN y �> y y NOTES 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE �oo�t TRUCKS. zx 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION 'T'�'2 c�xyz BY ALL CONSTRUCTION VEHICLES. zoNQ D y D 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT y.. TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. a o z / PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. o / 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE / CLEANED UP IMMEDIATELY. / 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF / INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE / FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. O p0 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO W BE DETERMINED BY THE ENGINEER. V 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED /QJ� ¢ Z m g S BY THE ENGINEER. �,�r o 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES F FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. ID Z zLU z n Q Z Cn C D o N ¢ U o o ¢ zN � VN Nz m CLASS 'A' STONE z Z M 8 IN. MIN. DEPTH "ry D n w > Z NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE Q cc m SHEET 1 OF 1 1607.01 SHEET 1 OF 1 1607O01 3/C400 CONSTRUCTION ENTRANCE DETAIL PERMANENT SEEDING TEMPORARY SEEDING (PIEDMONT REGION) PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO SUMMER DEPTH OF SIX INCHES SO AS TO PRODUCE A LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS, OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. SEEDING MIXTURE INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10-10 FERTILIZER SPECIES RATE (lb/ACRE) PLUS 500 POUNDS OF 20-PERCENT SUPERPHOSPHATE PER ACRE AND TWO GERMAN MILLET 40 TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A VARIABLE AS DIRECTED BY THE ENGINEER W.RWMti'SIWI LOWER RATE OF LIME CAN BE USED. IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND EITHER MAY BE SUBSTITUTED AT A RATE OF 50 lb/ACRE. TREE PROTECTION TE AREA LIIN.O GA DO NOT ENTERk.NINTERMEDIATE CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER GA. LINE HIRES OIATE ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. SEEDING DATES DE PERMANENT SEEDINGS: MOUNTAINS -MAY 15 - AUG. 15 STEELPOST WIR ' 'III ° IIII dtIl=n Im=IIIr=IItII=IIIII-iAo ilrl�ll�i�I �u=I WOVDI NIgE GABgIC PLANTS & MIXTURE PLANTING RATE/ACRE PLANTING DATESPIEDMONT-MAY 1 - AUG. 15 WARNING SONORANGE, UV RESISTANT -TENSILE STRENGTHORANGnv RESSTANT tj1COASTAL POLY BARR�AOE FABRIC tTYPICALI - BARRICADE TENSILE STRENGTH PHIGHOLY POLY BARRICADE FABRIC (TYPICAL) TALL FESCUE 110 LBS SEP 1 - APR 15 __RICH JAPANESE CLOVER MAY 1 SEP 1 Iq, 4 ry � JL _ I AA LITTLE BLUE STEM (CIMMARON) DEC 1 APR 15 SOIL AMENDMENTS FRONT VIEW PROTECTION AR EA T (LOW MAINTENANCE SLOPE FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 lb/ACRE TTREE 00 NOT ENTER 3:1 OR LESS) GROUND AGRICULTURAL LIMESTONE AND 750 lb/ACRE 10-10-10 TALL FESCUE 140 LBS SEP 1 - APR 15 FERTILIZER. SIDE VIEW WARNING SIGN DETAIL JAPANESE CLOVER MAY 1 - SEP 1 WARNING MATERIAL. AS TONEM"DE DT DURABLE. LEGIBLE LETTERS TO LETTERS TO BE PYUGHLACE MIIIMGM.CLEARLY LEGIBLE Alb SPACED AS DETAILED. SIGNS SHALL BE PLACED AT SN'MANWUM INTERVALS. DEC 1 - APR 15 LITTLE BLUE STEM (CIMMARON) MULCH OF LINEAR TREE PRNTERAIFT AND SOEOROVOF CENTER THEREAFTER PLACE A SIGH AT EACH AREAS ATTTREEPROTECURE LESS THANSANDw ABRMETER, PROV10E NO LESS THIN OAE SIGN PER PROTECTIOn AREA. ATTACH SIGNS SECURELY iN FENCE POSTS AND (LOW MAINTENANCE SLOPE APPLY 4,000 lb/ACRE STRAW. ANCHOR STRAW BY TACKING WITH URAr ADVOON'R�PR°vG'B`E E'"B°°�T°CTUALF�PRDDIG'. ADDITIONAL SIGNS MAY BE REOUNEO BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH ENO OF LINEAR TREE PROTECTION AM60'AN CENTER THEREAFTER •° -{ STEEPER THAN 3: 1) ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SET BLEND OF TWO TURFTYPE 200 LBS AUG 15 - OCT 15 NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. Area Rara Protection de los Arholes IB• TALL FESCUES (90%) AND FEB 15 - MAY 1 Prohibido Entrar � TWO OF MORE IMPROVED MAINTENANCE KENTUCKY BLUEGRASS WARNING SIGN DETAIL VARIETIES (10%) (GENERAL REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, LAWN AREAS) REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER �'N`• EROSION CONTROL DETAIL DURHAM COUNTY, NC TREE PROTECTION DETAIL BERMUDA GRASS 85 LBS APR 15 - JUN 30 DAMAGE. ENGINEERING DEPARTMENT DArE In oz/ov rP-1 1. FOR SPRING SEEDINGS, USE SCARIFIED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDINGS, USE UNSCARIFIED SEEDS. 5/C400 TREE PROTECTION DETAIL 6/C400 Skimmer Basin #1 Okay 2.64 Disturbed Area (Acres) DRAPE BAFFLE MATERIAL OVER WIRE STRAND INSTALL POST TO ANCHOR o} 6.11 Peak Flow from (cfs)DRAPE 10-year Storm ( BAFFLE TO SIDE OF BASIN AND ¢ AND SECURE WITH PLASTIC TIES AT POSTS SECURE TO VERTICAL POST ¢ F AND ON WIRE EVERY 12" ILL J---\o�4752 Required Volume ft3 OOU) 4' MAX. - Lou UQo= 1986 Required Surface Area ft2 � z w 31.5 Suggested Width ft 9 GAUGE MIN HIGH / U)�LL_�� TENSION WIRE STRAND / z O ¢ 63.0 Suggested Length ft SHALL BE SECURED TO POST TO SUPPORT 3' C1. o 30 Trial Top Width at Spillway Invert ft BAFFLE MATERIAL VARIABLE DEPTH w 0 _ _ _ 100 Trial Top Length at Spillway Invert ft =mmn - = _ 3 Trial Side Slope Ratio ZA 3 Trial Depth ft (2 to 3.5 feet above grade) SECURE BOTTOM OF BAFFLE 12 Bottom Width ft BAFFLE MATERIAL TO GROUND WITH 12" STAPLES Cr AT 12" MAXIMUM SPACING BAFFLE MATERIAL o 82 Bottom Length ft z � 984 Bottom Area ft2 U. 11 GAUGE a 5814 Actual Volume ft3 Okay NOTES: LANDSCAPE Co 3000 Actual Surface Area ft2 Okay 1. INSTALL THREE(3) COIR FIBER STAPLE a w BAFFLES IN SILT BASINS AND SEDIMENT z N 8 Trial Weir Length ft DAMS AT DRAINAGE OUTLETS WITH A = _ _ - _ _ ¢ i SPACING OF 1/4 THE BASIN LENGTH. III=III- 1l2 `4 0-5 Trial Depth of Flow ft 2. TWO(2) COIR FIBER BAFFLES CAN BE -1I 8.5 Spillway Capacity cfs Okay INSTALLED IN SILT BASINS AND DAMS STEEL POST - 2'-O" DEPTH ¢ LESS THAN 20 FT. IN LENGTH WITH A 2.5 Skimmer Size (inches) Skimmer Size SPACING OF 1 /3 THE BASIN LENGTH. 0.208 Head on Skimmer (feet) (Inches) 3. TOP HEIGHT OF COIR FIBER BAFFLES BAFFLE MATERIAL SHALL BE SECURED 1.5 Orifice Size (1/4 inch increments) 1.5 SHALL NOT BE BELOW BASE OF SPILLWAY TO THE BOTTOM AND SIDES OF BASIN ELEVATION. USING 12" LANDSCAPE STAPLES 2.00 Dewatering Time (days) 2 SHEET , DF , Suggest about 3 days 2.5 1640.01 3 4 5 6 8 Skimmer Basin #2 Okay TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER/EARLY SPRING p z ate,�zo >I""arn �y 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE <<g u.�a'"Z z mo Z'=D 'r OOV x t�-,O a O� x TZ9m wazw FUQC)M DDLE AND VERTICAL WIRES ¢ ?�or,T ALL BE 12V2 GAUGE MIN. ODD OO�Q GH N �� z N TOP AND BOTTOM STRAND L o SHALL BE 10 GAUGE MIN. 24" MAX. (18" MIN.) m � z WIRE DE o W w EC -0 c� on FILTRATION GEOTEXTILE z i O = NOTES 3 LL D USE WIRE A MINIMUM OF 32" O J Z D IN WIDTH AND WITH A MINIMUM FILTRATION GEOTEXTILE -� C, 0 V1 a OF 6 LINE WIRES WITH 12" STAY ¢ r o SPACING. COMPACTED FILL Z it a T USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND _ _ F a m M z FASTEN ADEQUATELY TO THE WIRE n O AS DIRECTED. I II- I I� I W m o a PROVIDE 5'-0" STEEL POST OF -III-III 8 -III z w THE SELF -FASTENER ANGLE STEEL 1LL TYPE. �„ I', STEEL POST - 2'-0" DEPTH FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH SHEET t of t SHEET t of t 1605.01 16 005.01 4/C400 SILT FENCE DETAIL TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE SEEDING MIXTURE SPECIES RATE ,Ib/ACREI SPECIES RYE (GRAIN) 120 RYE (GRAIN) ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS) 50 SEEDING DATES OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT MOUNTAINS - AUG. 15 - DEC. 15 TO EXTEND BEYOND JUNE. COASTAL PLAIN AND PIEDMONT-AUG. 15 - DEC. 15 SEEDING DATES MOUNTAINS - ABOVE 2500 FT: FEB. 15 - MAY 15 BELOW 2500 FT FEB 1 -MAY 1 RATE (lb/ACRE) 120 PIEDMONT - JAN. 1 - MAY 1 SOIL AMENDMENTS COASTAL PLAIN -DEC. 1 - APR. 15 FOLLOW SOIL TEST OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 lb/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 lb/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 lb/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES MULCH SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. APPLY 4,000 lb/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SET NEARLY MAINTENANCE STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. REPAIR AND REFERTILIZE DAMAGED AREA IMMEDIATELY. TOPDRESS WITH 50 MAINTENANCE LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EALY MARCH SEEDING SCHEDULE DETAIL 2.42 Disturbed Area (Acres) 5-6 Peak Flow from 10-year Storm (cfs) 4356 Required Volume ft3 1820 Required Surface Area ft2 30.2 Suggested Width ft 60.3 Suggested Length ft 40 Trial Top Width at Spillway Invert ft 100 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 22 Bottom Width ft 82 Bottom Length ft 1804 Bottom Area ft2 8544 Actual Volume ft3 Okay 4000 Actual Surface Area ft2 Okay 10 Trial Weir Length ft 0.5 Trial Depth of Flow ft 10.6 Spillway Capacity cfs Okay 2.5 Skimmer Size (inches) Skimmer Size 0.208 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 1.84 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 d6 8 Skimmer Basin #3 Okay 2.33 Disturbed Area (Acres) 5.4 Peak Flow from 10-year Storm (cfs) 4194 Required Volume ft3 1755 Required Surface Area ft2 29.6 Suggested Width ft 59.2 Suggested Length ft 25 Trial Top Width at Spillway Invert ft 100 Trial Top Length at Spillway Invert ft 2 Trial Side Slope Ratio Z 1 3 Trial Depth ft (2 to 3.5 feet above grade) 13 Bottom Width ft 88 Bottom Length ft 1144 Bottom Area ft2 5394 Actual Volume ft3 Okay 2500 Actual Surface Area ft2 Okay 6 Trial Weir Length ft 1 Trial Depth of Flow ft 18.0 Spillway Capacity cfs Okay 2.5 Skimmer Size (inches) Skimmer Size 0.208 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 1.77 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin #4 Okay 2.58 Disturbed Area (Acres) 5.98 Peak Flow from 10-year Storm (cfs) 4644 Required Volume ft3 1944 Required Surface Area ft2 31.2 Suggested Width ft 62.3 Suggested Length ft 50 Trial Top Width at Spillway Invert ft 100 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z 1 3.5 Trial Depth ft (2 to 3.5 feet above grade) 29 Bottom Width ft 79 Bottom Length ft 2291 Bottom Area ft2 12502 Actual Volume ft3 Okay 5000 Actual Surface Area ft2 Okay 15 Trial Weir Length ft 0-5 Trial Depth of Flow ft 15.9 Spillway Capacity cfs Okay 3 Skimmer Size (inches) 0.25 Head on Skimmer (feet) 2 Orifice Size (1/4 inch increments) 1.01 Dewatering Time (days) Suggest about 3 days Skimmer Basin #5 Okay 4.18 Disturbed Area (Acres) 9.68 Peak Flow from 10-year Storm (cfs) 7524 Required Volume ft3 3146 Required Surface Area ft2 39.7 Suggested Width ft 79.3 Suggested Length ft 30 Trial Top Width at Spillway Invert ft 125 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z 1 3.5 Trial Depth ft (2 to 3.5 feet above grade) 9 Bottom Width ft 104 Bottom Length ft 936 Bottom Area ft2 7943 Actual Volume ft3 Okay 3750 Actual Surface Area ft2 Okay 10 Trial Weir Length ft 0.5 Trial Depth of Flow ft 10.6 Spillway Capacity cfs Okay 2.5 Skimmer Size (inches) Skimmer Size 0.208 Head on Skimmer (feet) (Inches) 2 Orifice Size (1/4 inch increments) 1.5 1.79 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 d6 8 KE TUDIO I ARCHITECTUR ARCHITECT EVOKE STUDIO I ARCHITECTURE 401 FOSTER STREET, SUITE B1 DURHAM, NC 27701 T: 919.495.6079 CIVIL ENGINEER JC VVALLER & ASSOCIATES, PC 7-L DUNDAS CIR GREENSBORO, NC 27407 T: 336.697.2637 LANDSCAPE ARCHITECT REVINGTON REAVES 1250 REVOLUTION MILL DRIVE, SUITE 143 GREENSBORO, NC 27405 T: 978.793.2297 STRUCTURAL ENGINEER MMSA, INC. 30 PATRVOOD DR. SUITE 100 GREENVILLE, SC 29615 T: 864.331.1201 MEP ENGINEER DENBERRY ENGINEERING 2610 VVYCLIFF RD, SUITE 410 RALEIGH, NC 27607.3073 T: 919.881.9939 F: 919.881.9923 NC LICENSE: F-0929 AUDIO VISUAL KONTEK 318 HOLLAND ST DURHAM, NC 27701 T: 919.680.4321 LIGHTING GLIMMER & GLO)N ARCHITECTURAL LIGHTING 4711 HOPE VALLEY RD, SUITE 4F-611 DURHAM, NC 27707 T: 919.425.8945 FOOD SERVICE KRM FOOD SERVICE DESIGN & CONSULTING 9116 LANIGAN STREET CHARLOTTE, NC 28277 T: 704.724.1045 SPECIFICATIONS G2 SPECS, INC. 3301 N HAMMOCK DUNES VILLAGE POINT LECANTO, FL 34461 T: 704.609.2174 COST ESTIMATING HARRISCOST PO BOX 14979 SURFSIDE BEACH, SC 29587 T: 864.307.0021 CONSTRUCTION MANAGER LECHASE CONSTRUCTION 324 BLACK)NELL ST, SUITE 1200 DURHAM, NC 27701 T: 919.688.5300 This dravling Is the property of EVOKE Studio Architecture and Is not to be reproduced or copied In whole or in can. It Is only to be used for the project and site specifically Idenlhled herein, and is not to be used on any other project. It is to be returned upon the writlen request of EVOKE Studio Architecture. 0 2022 by EVOKE Studio Architecture PROJECT 111 C SEALS CARD N/CII 0 0 o hSEAL ;yo ff35657'f 0 '-°°oti � �0 9� cl � ► � 112012022 `1I1111r1I1,,,� ;,,���•&•ASS, P SEAL '•.C-3934 .� IN C III II 0 0 0 PHASE: DATE: ESA NO.: EROSION CONTROL DETAILS 7/C400 BAFFLE DETAIL 8/C400 SKIMMER BASIN DETAILS GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activitybeing considered compliant with the Ground Stabilization and Materials Handling g P g sections of the NCGOI Construction General Permit Sections E and F respectively). ( P Y). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW)Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the round sufficient) so that rain will not dislodge the soil. Use one of the g Y g techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES(PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC D WR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide podding area for containment of treated Stormwater before discharging offstte. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identifyleaks and repair as soon as feasible or remove leaking equipment from the P r 8 project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level round at least 50 feet away from storm drains P R Y streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality NCG01 GROUND STABILIZATION AND MATERIALS HANDLING ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER tt. T m T ;¢ R gzagym.• •ra a...- uc»mex a LN a.•,.®. ,w..r.av:mo .1 ERA% ABDVE GgAr& 46 IT CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. S. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75%capacity to limit overflow events. Replace the tar sand bags or other temporary structural P P, g P rY components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides pesticides and rodenticides in their original containers with the ,P label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. EFFECTIVE: 04/01/19 1/C401 GROUND STABILIZATION AND MATERIALS HANDLING DETAIL WIRE F (IF APF WOVEN FILTER GENERAL NOTES: 1. SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2, CLASS I OR 2 RIP -RAP SHALL BE USED AND COVERED WITH PINCHES OF NCDOT 15 OR J57 WASHED STONE ON THE UPSLOPF SIDE, 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTION OF THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. 3/C401 CLASS 1 OR 2 RIP -RAP TONE 5 OR 157) _01Y MAINTENANCE NOTES: 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED IT. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. STONE OUTLET DETAIL �A FUTURE E.O.P. - - INLET PROTECTION SUMP LOCATION, EARTH BERM A DITCH BLOCK --._--_ ... E.O.P. TEMP. EARTH SHOULDER BERM TEMP. SLOPE DRAIN INLET PROTECTION J�CSSLA"B" STONE FOR EROSION CONTROL OPTION #1 INLET PROTECTION TEMP. EARTH SHOULDER BERM TEMP. SLOPE DRAIN INLET PROTECTION CLASS "B" STONE FOR OPTION #2 •yamEROSION CONTROL EARTH BERM DITCH BLOCK FUTURE PAVEMENT ANCHOR STAKES TEMP. SHOULDER TEMP. EARTH SHOULDER BERM BERM DITCH 12" ANCHOR STAKE _ _ _ _ \\ MIN. EXTEND DRAIN AS REQUIRED TO EARTH BERM DITCH BLOCK COINCIDE WITH HEIGHT OF FUTURE E.O.P z -�� - FINISHED EMBANKMENT 12" �� Cc TEMP. EARTH SHOULDER BERM _ _ _ _ .. MIN. NATURAL GROUND LINE - - - - -10' MAX. - I EARTH BERM DITCH BLOCK TEMPORARY SLOPE DRAIN 1N1-ET PROTECTION TEMP. SHOULDER BERM DITCH)` I SHOULDER 1�5, MIN. ANCHOR STAKE -TEMP STAGE BUILDUP OF FILL ,I ANCHOR PITCH STAKE ELBOW ELBOW AN STAKES 30" LONG TOE OF FILL AND SET MINIMUM 12" DEEP. CLASS "B" STONE FOR SHOULDER EROSION CONTROL. SEE NOTES. POINT TEMPORARY SLOPE DRAIN SECTION A -A TEMP. EARTH SHOULDER BERM NOTES 1. OPEN END PIPE WITH SUMP AND MINIMUM SETBACK AND PROPER COMPACTION IS AN ACCEPTABLE INLET TREATMENT FOR STAGED CONSTRUCTION WHEN NOT LEFT IN PLACE FOR MORE THAN 30 DAYS. 2. AT INLETS A STANDARD T-SECTION MAY BE INSTALLED FOR MULTI -DIRECTION FLOW AND ELBOWS FOR SINGLE -DIRECTION FLOW As DIRECTED. 3. EXTEND SLOPE DRAINS TO BOTTOM OF SLOPE, SEDIMENT BASINS AND EROSION CONTROL MEASURES. 4. USE CLASS B STONE FOR EROSION CONTROL AT OUTLET LOCATIONS. 5. USE MAXIMUM SLOPE DRAIN SPACING OF 200 FT MEASURED ALONG TOP OF SLOPE. 4/C401 SLOPE DRAIN DETAIL ISOMETRIC VIEW OPTION #1 syou <pFq MATERIAL TOE\ -- OF FILL 0 O rn ¢a rz-I LLJI, ti 0 0 2 Z W QQLL= Q U O CCD F c/1F LLOJ 0 Er z 1 CL W O y LL LL W C7 m Z � � a Q C o IL W Q a Q� o H N of) 0 � QLL Z a O I..I Is C,7 1622.011 PART III SELF -INSPECTION RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Freq"anry Inspect (during normal Inspection records must Include: business hears) (1) Ran gauge Daily Daily rainfall amounts. aintiined in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zenci The permittee may use another rain -monitoring device approved by the Division. (2) E&Sc At least once per 1. Identification fthe measures inspected, Measures 7ca1endardays 2. Date and time of the inspection, and within 24 3. Name ofthe person Performing the inspection, hours of a rain 4. Indication of whether the measures were operating ent �1.0 inch in properly, 24hours 5. Description of maintenance needs for the measure, 6. ceserption,evidence, and date ofcorrectiveactions taken. (3)Stormwater At least once per 1. Identification ofthe discharge outfalls inspected, discharge 7Calendar days 2. Date and time of the inspection, outfalls (scot) and within 24 3. Name ofthe person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil 0v 1.0 inch in shsca,fl°all or suspended solids or discoloration, 24 hours S. Indication of visible sediment leaving thesite, G. De-ri eviden and date of <orrectiveactions taken. (4) Perimeter of At least once per If visible sedimentation is found outside she limits, then a record site 7calendardays of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, ent>1.0 inch in 2. Description evidence,and date ofcorrective actions taken, and 24houn 3. An explanation as to the actions taken to control future releases. (5)Streams or At leastonceper If the stream or wetland has Increased visible sedimentation or wetlands onsite 7calendardays stream has visible increased turbidity from the constructor, r offshe and within 24 aail them record ofthe following shall be made: where hours of rain 1. Description, evidence and date of corrective actions taken and accessible) evert >1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item(2)(a) of this permit of this permit. (6)Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabill-Or of grading , clearing and grubbing, installation cf storm easures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization es have been prrovided within the required timehame o su nce that they will be provided as won as Possible.as NOTE: The rain inspection resets the required 7 calendar day inspection requirement. NORTH CAROLINA _ Environmental Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC Ian as well as an approved deviation shall be kept on the site. The PP P Y PP p approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The followingitems pertaining to the E&SC Ian shall be documented in the manner P g P described: ttem to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation ofthe E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase ofgrading has been completed. Initial and date a copy ofthe approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available fora en inspectors at all times during normal business hours unless the agency P g Division provides a site -specific exemption based on unique site conditions that make this P P p q requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. c All data used to complete the Notice of Intent and older inspection records shall be () P p maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: a Visible sediment deposition in a stream or wetland. O P (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 ofthe Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7Calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -lay -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring,inspections ora I more stringent practices if staff P PPY 8 determine that additional requirements are needed to assure compliance with the federal orstate impaired -waters Conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(e) above (c) Anticipated • A report of least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7coleadcr days, a report that includes an evaluation ofthe 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance Within 14 hours, an oral or electronic notification. with the conditions . Within 7caliendor days, a report that contains a description ofthe of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environmentl40continue, and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence ofthe noncompliance. 140 CFR 122.411 • Division staff may waive the requirement fora written report on a case-bycase basis. NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 2/C401 SELF -INSPECTION, RECORDKEEPING AND REPORTING DETAIL SCREEN ACCESSIBLE THRO" noon VENT FLOAT FLEXIBLE JOI (RADIATOR HOSE) OUTLET END CONNECTION TO OUTLET PIPE OR RISER BARREL PIPE LONGER THAN SHOWN. 5/C401 SKIMMER DETAIL ZEE NE /3 �\ \ FOR CHANNsEEE 00, DETAILING _8/3 • •'• SIDE SEAM OVEPo.AP, \ \ \ > gEFOLL DETAIL e/3 r'S­LEB EETAL T/3 \ \ \DH ..�xANKETs \ \ \ \ \ SIDE SEAM OVERLAP \ \ \ \ \ STAPLE DETAIL �\ SEE DETN3y - _ \ . ` \ O SCALE z/3 a 3/ NOTES. ` ..'.... \ \ .•.:: SEC DETAI. 1/1 « sr, 1. SEE WRLIX® SLOPE APPLICATION PETAIL SHEET FOR PROPER SLOPE INSTAllATdI. \ .. :.... ......... 6. Dw1. ,qp aPSI°PE WANNET OONA' BLANKET OVERtAPA 11.--f�- SHINGLE Amer. SLOPE BLNB_ANKET . CHANNEL DEAJL�.. m BE %1 I I _Low E%lE1HNce AT IE STDTO whim"¢evanoNUAx SED. T ucDEA °y B. IANNI I a Hun IXTEAuncIPA°,Eo d. CHANNEL BLANKET END xlw 1H WAlat ELEVATONi S II. , OF ROLL OVERLAP r�l 3 No SCALErN CHANNEL INSTALLATION METHOD K No TRocH APPROx l KIT KIT SON. �w STAuc" Es to 3'-T THE TOE OF TIE A DE a SLOPE FRO OP BLANIQT . Wow or srancs. IHA`�' - IX.no s" O' ABOVE TIE WATER ELEVATON N A -CHANNEL \ srnccEREo. sT o.c,' EA. NR. _ R. INSTALLATK)N MEM�OD 'B" �1 Y R°AS OP STAPLES ' APART. APLEs TO BE To EDIT SOW BLANK L SAD FApa nLE saes CHANNEL STAPLES SHOum BE ([ 11L,_il w H 4 aRECTww, av''' CHANNEL TERMINATION oHN.TRENCHING PLAN 4 CHANNEL TERMINATION /1 NO SCALE NO sGalE 3 TRENCH APPROk N OIL PILE 'Or VAOE x e• DEEP FAO FRENCH Curlex® Staple Pattern Guide = "-" ,• F` 6 R vi de Curlex Erosion Control Blankets �- AtlJust horizontal staple zpazing for4 ft antl 16 hwitle Curlex Erosion Control Blankets ' Application Olb)R+(480 Pal SM1ear Stress IxRow OF sTAfi 1I Rm/u0 Velocity •AHKET Staple Padem 5 t E AOWS OF STanES, .R.R. Eh A- c¢Rm. a• ec., • = Staple Placement Notes: SIl EA 4 ft I. Recommended staples are minimum 4 Ln biodegradable E-Staple•, as provided by American Excelsior CpmpAry or 6 in re fer cohesive soils antl 6 in bOd,sBrzdable E-staple•. As 2h 4h provided by American Excelsior Company, or am wire for RnP RTS AiA CEA6E0 • • n n-c hesive soils. e' O.C.. ETAPLALro BE • 2 nowFor best results insen staples so Heads are parallel [o the OF DOSE 0 m(£ or warer. 3 ft I p. Adsust staple pattern so staples are placed in critical channel • • below. Ieg" slope interface, channel bottom) as illustrated F-L" • • Cnt cal channel port -re c rdl d \ / maunsaL PINE 1.93tapleslW' may/ MIMED *B tENCHMIG �, NO SCALE 3 6/C401 CURLEX MATTING DETAIL C KE FT�VO I ARCHITECTURE ARCHITECT EVOKE STUDIO I ARCHITECTURE 401 FOSTER STREET, SUITE B1 DURHAM, NC 27701 T: 919.495.6079 CIVIL ENGINEER JC WALLER & ASSOCIATES, PC 7-L DUNDAS CIR GREENSBORO, NC 27407 T: 336.697.2637 LANDSCAPE ARCHITECT REVINGTON REAVES 1250 REVOLUTION MILL DRIVE, SUITE 143 GREENSBORO, NC 27405 T: 978.793.2297 STRUCTURAL ENGINEER MMSA, INC. 30 PATEWOOD DR. SUITE 100 GREENVILLE, SC 29615 T: 864.331.1201 MEP ENGINEER DEWBERRY ENGINEERING 2610 WYCLIFF RD, SUITE 410 RALEIGH, NC 27607.3073 T: 919.881.9939 F: 919.881.9923 NC LICENSE: F-0929 AUDIO VISUAL KONTEK 318 HOLLAND ST DURHAM, NC 27701 T: 919.680.4321 LIGHTING GLIMMER & GLOW ARCHITECTURAL LIGHTING 4711 HOPE VALLEY RD, SUITE 4F-611 DURHAM, NC 27707 T: 919.425.8945 FOOD SERVICE KRM FOOD SERVICE DESIGN & CONSULTING 9116 LANIGAN STREET CHARLOTTE, NC 28277 T: 704.724.1045 SPECIFICATIONS G2 SPECS, INC. 3301 N HAMMOCK DUNES VILLAGE POINT LECANTO, FL 34461 T: 704.609.2174 COST ESTIMATING HARRISCOST PO BOX 14979 SURFSIDE BEACH, SC 29587 T: 864.307.0021 CONSTRUCTION MANAGER LECHASE CONSTRUCTION 324 BLACKWELL ST, SUITE 1200 DURHAM, NC 27701 T: 919.688.5300 This dray/ling is the properly of EVOKE Studio Architecture, and is not to be reproduced or copied Linwhole or in part. It Is only to be used for the project and site specifically Identhed herein, and is not to be used on any other project. It is to be returned upon the nritlen request of EVOKE Studio Architecture. 0 2022 by EVOKE Studio Architecture PROJECT SEALS �N\�Luu))11/o \\ CARS N, \ �1 o00......0 / \\ O` oo 6 S S / °Oo ��/ do 0 a EAR- o o - - ooCO o<�vY 6 F.o' v \� °oo G 1 N E o°° P \` °00000000� \\\\ ,�fffft icl(.112012022 ttt11111111,,,, P SEAL Ji '•.C-3934 .� N C 0 0 0 0 0 PHASE: DATE: ESA NO.: EROSION CONTROL DETAILS I IW-2995..61 oi' 8r TOP: 320M-- 9N W IINN (SNJ04.94 ): 3DS.09 W IN E): -16 W OUT (NW): 304 / TOP: 31622 NW IN (E): 30357 9N IN (S): 3(= IW OUT [Nk 308.E I ELM BMW 10WITHOME ASSOCIATION, INC. 1014 S. Roak - SL(Common Ana) ZONE PDIt 4T PIN 0720-01-08-6626 D8 5800 Po 422 P8 170 PO 362-374 p a INJ OUT (N} 316.76 ` 1112 7., �Mb s� TOP'. 340AS i W OUT (W): 33.. _ "I �1101117) TOP. 335.78 IW OUT (E): 3302 3 m'. 338m 9N IN ((E): 330 NW IN (NW} 33D.01 \ W BUT TO' 379.26/ 1. IN (E. 33,.41 W BUT (W)• 33,.06 \THAIBON \ ASSOCNTKN, He 5002 Tl - %.(Common Mn) ZONE PoR &I PIN 0729-Ot-17-093S Be 5555 PC 353 PS 155 Po 2851-297 p 6• Le W I (N E)0 �.30 ELM BRINE TOWNHBME ASSOCNTION, NC. 9N IN (So 27759 SITED S. ROMwm S. (Cannon Ano) 9N OUT (NE): 277 '�Ci ZONE T %N 0T29-01-19-015 Be 6/8O Po 79{ Po 162 Po 166-11% INV N(Sg27672 4• `S 4°�UOV i'+Y t� / IN 9• SYC/J/ORE INV OUT(NW)'.276R2TOP-. 287.19 INV OUT (NW): 279.0e VII IT Ir ;��, 'W1t Il l I I 55 r. TOP: 315.18/ //�� \ \ �(� INV IN (SE):\�V WA-6 INV OUT (,E): TOP. 3(BE): 1 / \ \ \ \ \\\1 1I 1 \ \\\ N3-W HN IN T 0 366.23 �\ \ \ \ /�/�/� \\ 111I1 1 1 (\ \I III \ \\ \ /� \ \\ \\,kl• INv oUr (Nw)3662, 16P: 31309 \\ INV IN (5W): 36a.64 \ ut / /' \ \7 �i •�l 1 \\\ 1 I \ \ /�J \ \ \ INV HUT (NAI: 306.31 G // /sty I �' Ir ,• ' P,� � -- J// /ice SOP 323.3E :17 OUT(BE): 319AS TOP: 3280 SWALE 1INVIN(12,819.50 SFNWj: .17 WOUT (1 3,7.0E _ � ` _-_�/ 0.29Ac. ELM BRH.E TNmHME AmccivaKN, INC. 3nOx RakZO E (�mman Am) - ,// / / l / ZONE OI ,r•�✓�_ 1 SWALE 2 / 1 / I I I I %N0686,11001K 9{ 1b I, " \� -- \ / / �/ / / / / / / / / 11 Po aPH,66-,76 , ~ p /✓ �-�\ \ I I 1 14,235.54 SF // / / /'l11I l 0.33 Ac. // / // / // PP 05• , ,/ // /�/ ////�l l 11 11IIIIIIJII �\ ST-4 / / 112,392.18 SF ( ) BMA _ / I ST-4 TOTAL / ELEV-3303, /// /��,,,''� ° J� J l I 2.58 AC SWALE3 / 101,515.27 SF /i%/� // // /// l �„ 66a NAIL / �- _ 2,664.64 SF �T-0 ' o.asAa _e�E s so 2.33 AC. // r ////// /////// / �• VOLUME 502 CF /pr> SWALE 4 / SEE 10,405.57 0.24A 0:1T / '� '4* II 11I I \ _� / x It /ME ASRCSOCNTKIN0. A - Po PO 4,16626/� IPP �0*t ,/l // / �� / / ✓ 1 l \ \ / // / / / / / // 2 •iE k k^ ygPb / �// / //� ^✓Y/ // / M/II ) // II / /r ,. /%Ilk �;;�/ ��'�'�(i I� Ali, SKINNER 96S 26• �� 1 ' /� r�/ ./ / / / l S W 05' �,� �� �E°E2� 9EE OETAL vP o.r' TOP M F:30o.5. / -� a 1J04 Caok3� (Cannon Am) BOTT'11, A 295A0 rr ( / 11 / //% SURFACE AREI'.3,]SO IF \ \ \ 1 r r / I I / /� a ZONE Ol / VOLUME: ],943 CF / I \ / / o Be %73M PO 17 (1�Cf M) `� / J ;,, PB 106 Po 281-282 / m Bu9A ` Iw NO I' I I ST-S 1 QT_� , . \\� \�. /`� , / , 181, 951 \ l 1 \ \ ' \ , I /) 1110 6aroN: HL (C NCI, Aro9) litA\ \ \ sT-3 IIIIII I I IIII 143,242.09 SF \ Z \ \ (I(II ()1ONE PDR 25, \ \ i I I I 1 \\ 4.18 AC 3.29 AC. \ ,\ ( \ \) \ �)/ / / n / P9reH195 7 -0�- ,6 BeD9 7Sa PC 17 ONE) 01,530.14SFIIII \\ `- I �t G/ /r�/ �� R110N9L HDCT 2. / I I I I \ \ \ \ �\'^��//lam 1 I I I 1� / // %N 0729-01-26-2847 ZONE PINT 251 / ST 3 I �> \\ I I I \ \ �` �y I ( / / PB 1 S7PO 71-72 (LOT 12) TOP ELE 320.59 -• I r ((� I I I I I I I I\\\ I (\ \ 1 111 I J�� }/ I I I 11 /) I) BOTTOM ELE 0.50 ` I / �� SDRFACE AREA:259D SF / VOLUME'. 53 94 CF n c i I . I I I D50-9'WIDTHW)=0.25' D50=0" a� A ST_2 TOP ELE:328.50'� BOTTOM ELE'. 324.00 SURFACE AREA '.4.000 SF VOLUME. 8,544 OF ' 9 rfl'h' 1 /(1 Ilk n \I� I \3e3 I 1 I 327 ISR9 ® 311 ® 33L- / J- THAXTON HOMEOWNERS ASSOCIATION. IND. 43D5 B =F' Ma(Common A-) A720 PDR xH %N O 5856 PC 8032E D8 5856 PG BS3 yELEV-347A7 PO 158 Po 289-297 \1111 1\\\\\\J��` / \� 11 `\'\ \ r l / �I'I111`►I I' I PIN0729E-01POR-T8231 -2800 L1-J Be �319 196C 71-n 137 \\ P9 5PP LOT „) \\\,7 I1W el, PIN D7 II IV el ENIND Wr III BUS-D CT ///l111 GOOD NEWS REAL ESTATE INYFSIkENT. LLC. ZONE PDR 2.51 FIN072H-01-28-2473 1 / / \ \ \ 1 \\ \ \ \ \ \ I I I 11 IIL��I(A'�\,7 / / Ji✓//1 / l/ OB 6)W PO 2 )//i ,6 (,RHOHT 4) ( ( / �'o \ �� I } \ I I / / / j j// /// m10. %o PB INPC 71-72 (IDT 9) (sT-2 � � 105,393.37 SF I11��r/ 2.42Ac. / !�� << %J \ \ J/I////l/%�/% 1 � / (\ 1 �� \ 1 II �-'�1�/��IJf I I11111)l�«fir>e� -IN IIII IIII �I / I / 1 I \ \ llll / / 1 I" 11 i / s ( I) / I �\ \ \ 11 /ll Il/IJ IJI JI /Ill •'/jam/ l / JJI /� / \ 1 • .\� \\1�\ / /// f ST-1//'�// le / ZIA? \ 80,976.85 SF 1 1.86 AC. lLyl�/Ej•/l/ /�/ ^� / //// // I 1 1 1 / / / /' / BENCHTE N 11 %ME COSHROUT / l�I I� (I /J\�r \ 1/ /, IS•O / / /�� /� // ' AREA / / // I / �// TOP ELE: 330.50 / 9M6QI ////� A I II / �/ / / / SURFACE ARE:,0 SF 1 / / SEE OETAL MMAMtA VOLUME: ( P/ DA-6(UNTREATED) /� I /i��/j / L (✓ / / / le I III II II1111 IIIj /� // / ( �� l ll�ll/ // / /�DA-6(UNTREATED TOTAL) I I I I III I// ) / �E�T�L /309� / / it / � 1,016,577.51 SF / / IIII III 1 I 1 1 I ( W10DTH 5' ) '/ IIIIII I I /I I I I I I lI 11 1 I I/ WIDTH(1M1�=925' 060=9" 23.33 AC. ( ///"' \ I I S 1 114, 09 SF 2.64AC. //ll� lllll /1 \ I /_ �\ l l\�\\ \\ \\\ \ II.,. III , I, /,III s<���r/ /I I III \ \ �r/ / \\ \�\\ \\ \� K M. REID D. REID �HN III I l) I / ti I (\ / ) \ \\ ZONE RS-20 I11 II //_//\ IIII /Ill II \II II IIII 1 II � IIII \ \9A+,6 //�j � �`317PO ° PIN 07S 71 PC 83 83200E MEASURED ' iPDN 1 / /,/ _ \\ I)IIIIII �j /// '°P°`j/ �l / A= I III �_-'_/ �\ ► I / / � ,� � IIII I ( 1 / .L"��/�� // /'��lll/,1-1 1\32 (EN '/ i// // // (EN IIIIIIII, SWALE 5 / / //�5' IIII , I 1122,934.23 SF / ///%/ / I I \\ IIII // �l / /llll III 1 I I I 11 III 0.53 AC. I I I // . SOUTH INC.INC A� SF /�// // / / I ''I/ I I \��\\ \ 1 \\ \ \ \ 1 III \ 1 \Il // ( I \\ 65' MASS _/ / / J GRADING ///r- 1 ,229/ P1D DUFFER / ' ice! i %/ / J I I n / '-� \�<�1`/ /nor ).7s• o� / \ CHOI CINOl1Nl7'27" TP'gCg52- \ ( / iONE POIt xH DI \ \ - / %N 0729-01-17 ZONE P0'Rdx/4 PIS ,410BPD31- (LOT 30) gy gy "�j %N 0729-01-17-4782 .WN W. INARIS 1 OEOFFAEY C• ORNE-EVANS OINOf N. TOPo PIS 143 51 11 P3 570 0T SB) 4WA FS. HARmIll OL \I III II IIII HOPE VALLEY FARMS NORTH F KAEBNI ORLE-EVNS / /A WAN S HNtA6 - I ¢ I I I OWNERS ASSOCNTKIN. INC. 4402 DON(ok Dr. C / I II / > aC n M02 MpABtlI CL ZONE 01- 3.44 IIII 632 EW`W6N 0' (= SP-) ZONE O - 3.M OWEL B, HOBAN // ) 'Syy YY / TONE POIt xH %N 0729-01-1]3361E 20N PoR xM %N 0729-01-17-5740 B� El PH 0]29-0,-,7-X99 BB 622E PO 963 %N 0729-01-17-6%6 DB 7511 PC 47 4403 MM& 0F. bb PB 143 PC 40-43 0 57) 08 2 PO 595 Po 141 PC 171-175 (OP 31) ZME: POR 3.N / 8 Be 2M 10-43 PC 271 P8 143 PC {0-{3 % 0-27-0531 Po 143 Po IM 679 (IDT b9> B86/ PS 141 PC 171-Im (LBr 2B) ^ IPF OS LILL Do1-kDrHOPE VALLEY FARMS NORTH a �' - (,o'eoetl taw) OWNERS ASSOCIATION. INC. tPgbPo 1512 CaokRe. z9,E: PBIL° «gyp) e He OUT. 274.22 277.21 \ ^ \ INV IN: 273.694 \ �I IFULL M �61 I Q4, �� \ -az2•\ O• \ I \ ELEV-276.66 SS �q v \� \ \ / CA13DD k ,366 Cook RQ G SS ( J >\ ZOIE Pqt xM PH B72" PC IN ry08 2216 •1<'° - 17: Po I09 Po toD PC 7, 8,�0•AID •�rtgp� AREN 6532 AORES ,� NQ "•O / I / 961 \ (z64,a41 saFT.) 1 ht U V 1a ENDS E68- PF Des LO'SAY 09"52s" \ / 05• 1304 Cook R0. (Common Aron) ZONE 01 %N 0729-01-25-5067 DO 7355 PC 17 (TRACE 1wO) P9 195 PG 2 ,-282 sear e:. rsa'PUeli��w, �J SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER & ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS N //�� "hl� S U 2 �o Lob Q SI TE 0 Y 0 U JULIETTE DR. Vl CI NI T Y MAP- N. T• S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 Waller & Asweiates, PC SITE DEVELOPNIENF- INFRASTRUCTURE- PLANNERS- SURVEYORS A MrNORITY OWNED ENGLNEERING AND SURVEYING FIRDI 7-L DITNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT',#21-026-274 Know what's below. Call before you dig. SCALE 1 " = 100' 0 100' 200' E'VO K I �TUDIO I ARCHITECTU ■ NV-296.8, � s" � TOP. 3mm I / 9N IN (5): J04.94 •VV IN N 3D5.o9 •N IN E): E: 30 97J OUT (Nwp 3a TON 31982 •VV IN (E): 30687 9N IN (S): J08.87 9N OUT [Nk 303.E TOP: 31S.18 INV IN (9E): 305.88 INv OUT (NE): 305.78 701 314.23 INV IN (SO 308.23 IMV OUT (MYp 309.2 TOP: 313.09 INV IN (SW): 30884 INV OUT (NAI: 305.51 / 8"TEMPORARY SLOPE DRAIN AND DIVERSIC PER NCDOT STD 1622. Di INLET PROTECTION #2. 8" SLOPE DRAIN SHALL BE INSTF ACCF'ORBANCE WITH r HIE ASSOCIATON, INC. m (Common Aron) MR 4M 01-06-55m 0 PG 4= S 362-374 I LENGTH D0=315' D50=0" ST-2-2 TOP ELE: 328.50--- BOTTOIA ELE'. 324.00 SURFACE AREA 4.000 SF VOLUME. 8,544 CF 2.5" SKIMMER SKIMMER ORIFICE DIAMESKIM 50" SEE DETAIL SKIMMER SIZING CALCS I � J I 1 \ 1 I\ I �l /. \ � I I I -4- I I ELM GROVE TOMNHOME ASSOONINHI, INC. I I 4024 S. RONSOIo SL(Common A-) ZDNIB PDR 480 PIN 072G-01-OS-4429 . DO WIND Po 122 PS 170 PO 362-374 I - - I 'IN5(� oa` INV8.7 INV 388 jON ].1 3E]. 319 I/ / I 340D8 W Nv ovr (q: 33...... / T}iax:on Pl. PUeU ,� r TOP: 3M78 INV OUT (E): 33023 ^� 998� / TOP. 338M NV IN ((E): 330D9 •VV IN (NW} 35D.04 rrV our (b: s3D.D4 _ you a x�� INV IN (E} 331.41 rrV our (w)• 331.05 \THAXION NommmoERS ASSOCNTIm. NC. Som 7l -%. (Common Ar•o) ZONL. POR 3.M %N O7m-01-1]-09SSSI D9 5556 PO PS 155 PO 2119-2117 g. �p 9. x I TINXTON HOMEOWNERS AT-) 43DS 9"NE. WIN.- ZONE PDR PIN856 7-0 I JPS/1 PC 8 DO 5556 PG 53 yELEV-34]9] PS 158 PO 289-297 SIT 270 /jam ,ten n 1k• ^�\\ \�✓�\\ I \1 ,, \ICI PF0.s• ;���, sr. \ \\ \/� � �� \\• It 1 1 1 Jim \\ SWALE 1 / / III 1 I I I I I I I I I I 12,819.50 SIF �y I 0.29AC. / /,l / /IIII/ IIII IIIIIIIIi I ll�I��( / l,�IIIJIII I IIII Ill .3jg •S•Lp ^ 699/ / / 15"HDPE TEl:IPORARY STORM PIPE (THE CONTRACTOR SHALL ENSURE WATER IS 1 CAPTURED FROM THE SWALE AND51 I III D 5 cC SWALE 2 PIPE DISCH� E�TO THE SKIIAM wBASIN WAE AND , Is D15 14,235.54 SF A,, / Y \ / 0.33 AC. / / / / TOP ELE: 315.50I I III I IPF OA' / BOTTOM ELE: 310.50 I o SURFACE AREA -5,00It /Z0 VOLUME: 12,502 CF /eRIPFST-4(TOTAL) SV64.64 ' 101,515.27 SF 00 �/ // // / COLTETOMR/ I/VST !'2,664.64 SF coNTRAcroR srlaLL E-D.US AC. Cc 2.33 AC. E WgTER BQlp/fI 7 CAPTURED THE SWALE AND / / / // �• DISCHARGED HE SKIMMER BASIN SWALE 4 3.0"SKIMMER / 10,405.57 SF DIAMETER'.2.0" p �/ 0.24 AC. / SEE DETAIL SKIMMER I *.2INGCALCS IPP 0.5• -iNIPFPOS• 3D0=3 ]5' / / /r� T9 o i�'`fs � 7• 3J9 / '76 / / � / r / 5 � ' S os• J yr / 3 2.5"SKIIAMER ( S ,A \\ SEE DETAIL MSKIDIAETER:2.0" MMERAl ^J I DIVERSION BERM PER NO STD 1622.D1 SIZING AL,S O INLET PROTECTION OPTION 42. 8, SLOPE FAOl' ST-5 / TOP ELE'. 315.00 11 DRAIN SHALL BE INSTALLED INOaokJA (COL'Cinmon Mo) � BOTTOM ELE. 304.D0 \ R ( r S d ACCORDANCE 4VI; H NOTE 2. ZONE 01 SURFACE AREA'.5, ODD SF I \ / / a %N 0]29-01-29-699] A� VOLUME: 12,502 OCT / o DB 73N PG 17 (iWCT 7R0) `� / P9 195 PO m1-282 //llflr�Jl j/ /\/�l�l/�// , //r �L�'/, \ \ \ �•+ / / / / IN AREAS NIHERE FUTURE RETAINING WALLS •/ / (\ C(-r 1 \ �RER PEN AREPROPO BACK EOSHACTGRSNALL � I THE SLOPE BACK TO BE OSHA COMPLIAI II SHI L'ENSURE POSTIVE BRA ST-5\\\�\ (I((/111 a / \ \\ \ I I I \\ \ / �l I I I I I I I I I J I I 143,242.09 SF Z 1 \ I IJ ,,,D S•aro1VN.F- (' Common Aron) \�f,� I[ ^ PN 0729-011--(27I8--077418 3.29 AC. / \\ l� 1 I )�)I/ RANLWI G. SRNMI3A f� DB 7M 1995 PG 71-72 �E7 FIN ° �47 D9�358 PGR52' PB 195 PG 71-72 (LOT 12) (rij1lIIIIII�II TT� N112!��0CT / / /A'' \ \ \ I I \ 1 \ I � %� \ \ ^ ��`���) 111) I I 1� 1( // . PIN 5 PG T137 8-2800 F ,I' I Pa 195 PG 71-n (LOT 11) 286 1 40-=Po W hoPUeL w, \� 11 c /i % / \ \\\ \ �) \ \\\ \\ \ I II / , /�99-0 -2D 24 \ ZONE PDR 2S1 ` ` PIN 87m-01-2858 �� \ I I (j�I l I \ \ � /<\ 11 ( JI D9 7974 PG �B J) Il LP I l l (I )c l P9 ,95 PG 7,-]2 (CDT 10) GOOD NEWS RVIL MATE INVESTMENT, 11C. too IN, M I I %N 0729-01-29-2475 I J//i/� (I /�i✓/ // I I I-2 / \\��� JIII III \ IIII�I(� /� /// �;//HL (sST :. .� 4 1 I 105,393.37 SF 2.42 AC. ll 1 o//// ��V � \ \ 1�\\ 11 Illl�lj/(<< �J .P4EAREA I 1//// ST-1 1 / I I/ \� 80,976.85 SF /?�\(/ / �/ 3A5 1 I 1.86 AC. / /��v\ / / MM /�, /COCA CON RACTORSHAL.1 FIT RE LL BDENCOH BJACKAINING / / EARTH IN ACCORDANCE WITH OSHA / ( / // / / I CONCRETE / / / II REQUIREMENTS FOR THE FUTURE // ,\/1/ �iVASH-OUT I CONSTRUCTION OF THE WALL WHICH WILL BE �� 0E N 15' PINE AREA // /IP �I �I(TID SEPARATELY ,' / //� / ✓�� TOP ELE: 330.00 9lgM/ BOTTOM ELE: A:S 00 h 2.5" SKIMMER / / / / / / ( j/SURFACE AREA:3, 000 SF I / / / / / / VOLUME: 5,814 OF h SKIMMER ORIFICE SIZING CA.1.50.. Tj SEE SIZING CALCS �DA-6(UNTREATED TOTAL) I // iN /La=6. /309� I I I DID -115 .1,016,577.51 SF II / °�Z I�, I I /1 1 I ((DDIOT9 W0 D25 J 1 �lll I I l l � 23.33 AC. � � / /// 1 � I I I11 / (/� / I /I I I` I� I I I I 11141j( \� yii/ / � l 1111 1� M. RED REID 13W Cook R8. ZONE RS-m THE CONTRACTOR SHALL %N 07m-01-28-20D9 \ D PIS 71 PG 83 ENS UREWATE RGETTO IIII3D II THE SWALE AND svNiAH DISCHARGES OFFSITE -, �I�44���� \,\ppp4,,, 1 MiOP 0] 71 TEMPORARVSLOPEDRAINANDi- tjDIVERSION BERM PER NCDOT�f_\/ INLET PROTECTION OPTION#2.6'SLOPE �.i 7 UI / / / Ff / 1 DRAIN SHALL BE INSTALLED IN / / �� , �\ i ACCORDANCE WITH NOTE 2. ` 2 III " SWALE 5 I 22,934.23 SF Id I 0.53AC. /// // / III 1I I ��I IIII \\(( 1 IIIIi��(�( I 343 SWALE 6 O 0.09 AC. SF �/ 1 '// / I I �N\\\1\\ 34 \\ \ \ \ 11 I I I 65MASS BUFFER' 330 GRADING �' \ \ \ I ,229 J AT PAD BUFFER '- / 9 N E /�.y N+101 DNAkW1D D. 13, N85GT7'27"TP'g89.52- ( /a+Y$]T� ZONE PON 3.H CYMlISOCWDN %N 0729-0,-,7 ZONE PDhRo'3.14 PB ,41MPD0171- (lDT 30) gy gy %N 07240'9.-17-4782 ANN W. NARREi 1 GEOFFREY C, ORME-EVANS J CINOf N. lN�O PIS 143 P008 1l PO 57040-[3 (LOT 58) 44D3 NgNSull tt• \I II 1 II IIII HOPE VALLEY FN015 NORM F KA4402 ORkE-EVNS 1 /y RYAN S. HARRIS I / ¢ I I I OMREIS ASSOCIATION. INC. 4402 DON(ok Dr. > aC n M02 MMI CE ZONE POR 3.44 IIII 852 E`MW6 - 0' ( W SP-) ZONE PDR 3.M EDANIEL BORA R%NINCIUM // ) 'Syy Mp %N 07m-0,-17-5740�`AV YY ZONE PO 3H %N Olm-01-1]-5810 mN • POR 3M D8 75It PC 47 S� VVPP,,,, Sl PH 0]29-01-17-3�9 M I4�Po 10-�43 QOT 57) %N08 o M 5115 P8 IN M 171-175 (O 31) mlE;DpOR 3µ / b OS 2780 PO 271 P9 143 M 40-43 PINOSD7m8-O -27-01109 �� PS 143 PG Io-43 (LOT m) PS 141 PC 171-1]S (CDT m) ^ PF OS LILL DolwiokDr. HOPE VALLEY FARMSCKTIO NORM a �' - (,o'eoeti taw) OWNERS ASSOCNOON. INC. tPgbV 1512 C•ok !t zorE: P011 3�.NSp.p) e ////^ %OUT: 2 4.22 e 277.21 \ IMV IN: 273.694 \ I V our. Z7 .61 Q0 \ � �IN0�2•]9 1\N O• \ I \ ELEV-27/.59 06, alit, �q v \ \\44 ZONE Pqt 3.M �S, ry08 2216 PC 109 � '1<'9 PS toD PC ], Abrtgp I (2N,641 50.Fi.) V H7 �, U v TR ENDS -268- - PN- os• \ � I � � `R/0.75' OIPP Ob' I.IJ�� 1304 Cook R0. (Common Aron) ZONE 0, %N 0729-01-29-5097 D9 7359 PG 17 (TRACT TRO) PB 195 PO 291-282 �J SITE SURVEY WAS PROVIDED BY THE OWNER. IC WALLER & ASSOCIATES, PC IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION PROVIDED. GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMIT APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING FEATURES PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR WILL BE REQUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL STORM DRAINS AND UTILITIES ENTERING THIS PROJECT. 4. NO SUBSURFACE INVESTIGATIONS OR DETERMINATION HAS BEEN MADE BY THE SURVEYOR OR ENGINEER. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES ON SITE. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH C.O.D. & NCDEQ STANDARDS N o S� S �o��//�� "hl� U 2 0 Q SI TE V) 0 Y O U JULIETTE DR. Vl CI NI T Y MAP- N. T. S. SITE DATA TABLE LAND USE: EXISTING: VACANT LOT PROPOSED: ELEMENTARY SCHOOL EXISTING NUMBER OF LOTS: 1 PROPOSED NUMBER OF LOTS: 1 ZONING PARCEL NUMBER: 145702 DEED BOOK: DB:6361 PG:534 PLAT BOOK: PB:174 PG:198 PROPERTY OWNER: DURHAM PUBLIC SCHOOLS 2011 HAMLIN RD. DURHAM, NC 27704 EXISTING ZONING: PDR PROPOSED ZONING: IO DEVELOPMENT TIER: SUBURBAN TOTAL ACREAGE: 33.23 AC TOTAL ACREAGE DISTRUBED: +17.28 AC WATERSHED DATA REGULATORY BASIN (WATERSHED): THIRD FORK CREEK BUILDING DATA EXISTING BUILDING(S) GFA: 0 SF PROPOSED BUILDING GFA: 86,007 SF PARKING CALCULATIONS PARKING REQUIREMENTS REQUIRED PARKING 1 SPACE PER CLASSROOM (42) 42 SPACES 1 SPACE PER 300 SF OF ADMIN OFFICE SPACE(4,442) 15 SPACES 57 SPACES REQUIRED BIKE PARKING 1 SPACE PER CLASSROOM(42) 42 SPACES REQUIRED PARKING=57 SPACES(MIN) OR 175% OF MIN=97 SPACES(MAX) TOTAL PROVIDED PARKING = 97 SPACES * OF THE 97 PROVIDED PARKING SPACES, 4 SPACES ARE REQUIRED TO BE HANDICAP ACCESSIBLE, 4 HANDICAP SPACES ARE PROVIDED *ALL OF THE HANDICAP PARKING SPACES PROVIDED ARE VAN ACCESSIBLE SPACES MININUM BUILDING SETBACKS LOT DIMENSIONS MINIMUM LOT SIZE (SQ. FT.) N/A MINIMUM LOT DEPTH (FT.) N/A MINIMUM LOT WIDTH (FT.) N/A SETBACK REQUIREMENTS (MINIMUM FT.) MINIMUM STREET YARD (FT.) 8 MINIMUM SIDE YARD (FT.) 30 MINIMUM REAR YARD (FT.) 30 HEIGHT (FT.) / NUMBER OF STORIES 90 MAX DWELLING UNITS PER ACRE N/A FEMA INFORMATION PROJECT IS NOT LOCATED IN FEMA REGULATED FLOOD PLAIN MAP#................................3720072900L PANEL#.............................0729 EFFECTIVE DATE................10/19/2018 if Waller SL Associates, PC SITE DEVELOPMENT -INFRASTRUCTURE -PLANNERS -SURVEYORS A MINORITY OAA'NED ENGLNEERING AND SURVEYING FIRD4 7-L DtJNDAS CIRCLE GREENSBORO, NC 27407 PHONE: (336) 697-2637 PROJECT',#21-026-274 Know what's below. Call before you dig. SCALE 1 " = 100' 0 100' 200' KI TUDIO I ARCHITECTU