Construction:
CROSS SECTION VIEW
1.
Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics.
2.
Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water
sufficient to cause failure of the structure)
Maintenance:
3.
Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the
1 Inspect sediment fences at least once a week and after each 1 inch or greater
4.
filter cloth only at a support post with 4 feet minimum overlap to the next post.
Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the
rainfall. Make any required repairs immediately.
bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a
2 Should the fabric of a sediment fence collapse, tear, decompose, or become
minimum 50 ound tensile strength. p 9
it
ineffective, replace tt promptly.
5.
When a wire mesh support fence is used space posts a maximum of 8 feet apart. Supports should be driven secure) into the round a
pp p p p pp y 9
3. Remove sediment as necessary to provide adequate storage volume
es
minimum ofth inches.
for the next rain and reduce pressure on the fence. Take care to avoid
6.
Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts.
undermining the fence during cleanouts.
the
Wire plastic zip ties should have a minimum of 50 pound tensile strength.
4 Remove all materials and unstable sediment deposits and bring the
Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier.
a
area to grade and stabilize it after the contributing drainage area has been
8.
8.
Place 12 inches of fabric along the bottom and side of the trench.
properly stabilized.
9.
Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance.
10. Do not attach filter fabric to existing trees.
\N C- En vi ron m en to I. jp eg
SILT FENCE
UF1 I C: h'/1UC:
Silt Sock/ Wattle Silt Sock/ Wattle NOTE:
FLOW- 3Area to be FLOW 3�� Area to be 1. Other materials providing equivalent protection
I I I I Protected against erosive velocities may be substituted for
Protected
use in silt socks or wattles.
12" Min. 12" Min. 2. Fill silt sock/wattle netting uniformly with compost
2" x 2" -w� 2" x 2" to the desired length such that logs do not deform.
Stakes Stakes 3. Silt sock/Wattle(s) should be installed parallel to
SECTION and a minimum of 10 feet beyond the toe of a
SECTION graded slope. Sift Sock/Wattle(s) located below
flat areas should be located at the edge of the
land disturbance. The ends of the silt
sock/wattle(s) should be turned slightly upslope to
jWood
aprevent runoff from going around the end of the
silt sock/wattle(s).
4. Oak or other durable hardwood stakes with a 2
inch x 2 inch cross section should be driven
vertically plumb, through the center of the silt
sock/wattle. Stakes should be placed at a
maximum interval of 4 feet or a maximum interval
Trench in of 8 feet ifthe sift sock/wattle is placed in a 4 inch
Mulch or Comp st ground 4" Min. trench.
To 1/2 height of log 5. In the event staking is not possible (ie. when
UNTRENCHED INSTALLATION ENTRENCHED INSTALLATION* sockstwattles are used on pavement) heavy
-m IS APPLICATION MAY NOT BE USED wTH GOMPOSTSO-SMALLER THAN I2". concrete blocks shall be used behind the slit
sock/wattle to hold it in place during runoff events.
ISOMETRIC VIEW MAINTENANCE:
1. Inspect silt sock/wattle at least weekly and after
each 1 inch or greater rainfall. Remove
Mulch or Compost accumulated sediment and any debris as
needed to allow for adequate flow.
for Entrenched Socks Area To Be Pr 2. Silt sock/Wattle must be replaced d clogged or
torn.
3. If ponding becomes excessive, the sift
Sheet Flower sock/wattle may need to be replaced with a
Silt Sock
Wattle larger diameter or a different measure.
Work Area 4. Reinstall if damaged or dislodged.
5. Silt sockstwattles shall be inspected until land
disturbance is compete and the area above the
measure has been permanently stabilized.
..\NC-Environmental.jpeg
--------- SILT SOCK / WATTLE FOR PERIMETER AND INLET PROTECTION
DATE:
»A» "B" C. »D»
'� Moose '� � Moose � � MoosE MooaE C
»E» »F» »0" »H»
e e
Mg18E � � MglbE 110119E Mooee
f-EDGE DE CURB Notes:
CU INLET 1. If needed, Tree Protection fencing should be installed along the buffer zone, wetland
boundary and/or around protected trees, providing a radius of at least 1.25 feet for each
LEGEND inch of trunk diameter.
2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on
FLOW DIRECTION schematic/diagram and field adjusted, if necessary, for placement at low points. If lots are
SILT FENCE contiguous and have different land owners or builders, each lot should have individual Silt
Fences.
SILT FENCE OUTLET ® 3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with
CONSTRUCTION ENTRANCE septic system. It is the responsibility of the builder to ensure the installation of sediment
CURB INLET control measures does not impact the septic system and repair area(s).
4. At least one Construction Entrance/Exit is to be installed per lot.
5. Waste bins and other areas dedicated for managing building material waste shall be at
least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that
no other alternative exists. If this separation cannot be achieved, these areas must be
contained behind Silt Fence.
6. Inlets downstream of disturbances should be protected; streets should be swept when
sediment from the construction activity is present.
..\NC-Environmental.jpeg 7. Details for Silt Fence, Silt Fence Outlets, Construction Entrances and other measures are
-- - provided on additional sheets. Erosion and sediment control details are not drawn to scale.
-------- -- - TYPICAL LOT LAYOUT WITH CURB AND GUTTER
General Erosion Control Notes
1. Only the areas shown shall be disturbed.
2. All disturbed areas shall be grassed and mulched as soon as
possible and maintained until permanent cover is established.
Pursuant to G.S.113A(3), provisions for permanent ground cover
sufficient to restrain erosion must be accomplished for all
disturbed areas within 14 working days or 90 calendar days
(whichever is shorter) following completion of construction.
176
180 CONSTRUCTION
178 ` LIMITS
- -x
. . . . . . . . . . F
(CONSTRUCTION SCHEDULE
1. Obtain all necessary permits and plan approvals. Erosion and Sediment Control
\ / (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing
activities occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on
site, preferably in a permits box, and accessible during inspection.
2. Install gravel construction entrances first, then silt fences, reinforced silt fence outlets and wattles.
\ 3. Finish clearing and grubbing any necessary areas on the lots as they are started.
1j6
CED
ICE
T
2CE 1�A
`
N ,7
CA
)RCED
ENE
LET „ // „
VSTRIEFIQ- 11 _ _ I Ld
i
DATE: PAGE:
DATE: PAGE:
/ 4' MIN. SILT FENCE
C) S0. TOP OF SILT FENCE
�N / M%n. a MUST BEAT LEAST
Q�� rTo F ABOVE THE TOP OF
ontofyoUSe THE WASHED STO
/ STEEL FENCE P ST
WIRE FEN
HARDWARE CL TH FRONT VIEW
BURY WIRE FENCE,
FILTER FABRIC,
i 6" N1in.
FILTER OF # r���AND HARDWARE
/ WASHED SEE
STEEL FENCE POST CLOTH IN TRENCH
a ° SET MAX 2' APAR I}�
MIN. 18" INTO SOLID
�c$�b T FILTER FABRIC GROUND
2-3" Course AggPr' ^°Ho /ON GROUND NOTES:
°o 1. Hardware cloth and gravel should overlay the sift fence at least 12 inches.
\ 000Qo o4� 2. Stone Outlets should be placed on low elevation areas of silt fence and
o o oo d� based on field conditions.
Construction: Maintenance: MAINTENANCE:
1. Clear the entrance and exit area of all vegetation, roots and other objectionable 1. Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall `\
g ) P g \ 1. Per NCG-01, inspect outlet at lest once a week and after each 1 inch
material and properly grade it. make any required repairs immediately.
2. Place the gravel to the specific grade and dimensions shown on the plans, and 2. Maintain the gravel pad in a condition to prevent mud or sediment from leaving the BURY WIRE FENCE AND HARDW CLOTH BURY 6" OF UPPER EDGE O Or greater rainfall event. Complete any required repairs immediately.
smooth it. construction site. This may require periodic to dressin with 2 inch stone. FL. Freshen stone when sediment accumulation exceeds 6 inches.
Y 9 P topdressing FILTER FABRIC IN TRENCH 3. Keep mesh free of debris to provide adequate flow.
3. Provide drainage to carry water to a sediment trap or other suitable outlet. 3. Immediately remove all objectionable materials spilled, washed or tracked onto public 4. Remove sediment when haft of stone outlet is covered.
4. Use geotextile fabrics in order to improve stability of the foundation in locations roadways. 5. Replace stone as needed to facilitate de -watering.
subject to seepage or high water table.
SECTION VIEW
.. - nmental.jpeg
\NC-Environ ------ .jpegEFFECTIVE SILT FENCE OUTLET
CONSTRUCTION ENTRANCE /EXIT
c\
4. Begin lot grading and excavation activities
/ \
5. Begin or continue with house construction activities.
\
/
6. Finish all rough grading and house construction.
7. Install driveways, walks and patios.
/
/
/
8. Begin fine grading of lot areas
9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of
sod on the lot. The silt fence will remain in place until the lot is sodded or grassing is stabilized and
takes hold.
10. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and
complete the following combined self -inspection form found on the DEMLR website
https:Hfiles.ne.gov/nedeq/Energyn/o2oMineraln/o20andn/o2OLandn/o2OResources/Stormwater/NPDES
^1Q
N
%20General%2OPermits/DEWR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf. Twelve
months of complete inspection forms shall be kept on site and available for inspection at all times.
It is recommended a copy be kept in a permits box. (GS 113A-54A (e), 15A NCAC 04B.0111,
/
NCGO1 Part III Sections A and B)
11. Self -inspections for erosion and sedimentation control measures are to be performed at least once
\
every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any
\ / /
needed repairs shall be made immediately to maintain measures as designed. All ESC measures
shall be maintained as specified in the construction details on this plan. A rain gauge shall be
\/
\
installed at the project site for monitoring.
12. Inspection and final acceptance letters. When the project is complete, the permittees shall contact
DEMLR to close out the E&SC Plan. After DEMLR informs the permittee of the project close out,
via inspection report, the permittee shall visit "deq.nc.gov/NCGO1" to submit an electronic Notice
of termination (e-NOT). A $100 annual general permit fee will be charged until the e-NOT has
been filled out.
A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
NCGS 113A-54.1"IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR
COMPLETED AS AN EXCEL SPREADSHEET.
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
EROSION AND
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A
NCAC 04B. 0131 STATES THAT "...DOCUMENTATION SHALL BE ACCOMPLISHED BY
INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
lPRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
CONTROL PLAN."
The Slicing Method
%.
rFLOW
I%
gI
1II II IIFI�
11 11
_ _
%� 1:1111:1�1-ill
2-1L-1L-11
1II.II.IL 1,.�II.11.11.11.11.11.
I.II.I�.II.IIE
� ILII.11.11.1�.11.
:nlnmurrrza
vxsIr y play is not srru A ble bemuse of horizmlal mmpac[ian
Top of Fabric
�Il
top) 8"
1
ATTACHMENT DETA LS:
• Gaths f xx, H polls f needed.
• Utilize three ties p pint, a1I within top 8"of fabric.
• Po Mx, rerh tie dagonally, p..d. W holes vs xslly
a minimum of 1"apart.
• Hang rerh lie on a pmi nipple and tighten servrey.
Use cable lies (5glbs) or soft wire
-12"
I' 1
i stalls)
after
ompaciion
sin Knee
C rnpletedln9all bun
PAGE 1 of 2
TOTAL DISTURBED ACREAGE: 9.31 ACRES
EROSION CONTROL PLAN FOR LOTS
1 - 15 & 28 - 31
IN
SCHABERT CROSSING
FOR
H&H CONSTRUCTORS OF
FAYETTEVILLE, LLC
DUKE TOWNSHIP HARNETT COUNTY, N.C.
SCALE: 1 "= 100' AUGUST 2022
GRAPHIC SCALE
100 0 50 100 200 400
ENGINEERS
PLANNERS
SURVEYORS
MOORMAN, KIZER & REITZEL, INC.
( IN FEET )
1 inch = 100 ft.
MOORMAN, KIZER & REITZEL, INC. 115 BROAD FOOT AVE. FAYETTEVILLE, N.C.
PHONE (910) 484-5191 FAX (910) 484-0388 LICENSE # F-0106
COMPOST SOCK INITIAL FLOW RATES
te�tgglPost Sock
8 Inch
(2W
12 Inch
18 Inch
24 Inch
32 Inch
(750
Design Diameter
DIED)
(300 nm)
(450 nm)
(600 nm)
nm)
Maximum Slope
800 Feet
750 Feet
1,000
1,300
1,850
Length (CL°.�
(183 m)
(229 m)
Feet
Feet
Feet
(305 m)
(396 m)
(5D0 m)
Hydraulic Flow
7.5
11.3
15.0
22.5
30.0
Through Rate
gpm/ft
gpm/ft
gpm/ft
gpm/ft
gpm/ft
I/m/m)
I/m1/m)
I/m/m)
I/m2/m)
I/m/m)
LAST SAVED: 8/23/2022 9:11 AM LAST PLOTTED: 8\23/2022 9:32 AM PLOTTED BY: Dennis Gilbert FILENAME: G:ACURRENT JOBS\H & H CONSTRUCTORS\22-1367-06 SCHABERT CROSSING-EC\PLANS\SCHABERT XING-LOTS 1-15 & 28-31.DWG