HomeMy WebLinkAboutNCC191246_NOT Closeout Documents_20220921$A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
SEDIMENTATION INSPECTION REPORT
INSPECTION ECINSP-581709
In Compliance
CASE NUMBER: ECPC-08-2019-119883
PROJECT:
PARCEL/ADDRESS: 277002985930 1394 HENRY RIVER RD, HICKORY NC 28602
START DATE: 07/12/2022 Tuesday 10:01 am
COMPLETION DATE: 07/12/2022 Tuesday 10:01 am
CONTACT LIST
Financier *KEY BUILDERS, INC., 1459 NORTH ASPEN ST NORTH ASPEN ST, LINCOLNTON
NC 28092-3361, H:7047350040B:7046340456C:7042309394 INSPECTIONS@KEYBUIL
DERSNC.COM
Owner *KEY BUILDER, INC., 1459 N ASPEN ST, LINCOLNTON NC 28092, B:7047350040C:70
44668423 KERRI@KEYBUILDERSNC.COM
Contractor *KEY BUILDERS, INC., 1459 NORTH ASPEN ST NORTH ASPEN ST, LINCOLNTON
NC 28092-3361, H:7047350040B:7046340456C:7042309394 INSPECTIONS@KEYBUIL
DERSNC.COM
PICTURES: PRINTS: r SLIDES: ❑ DIGITAL: VIDEO: ❑
WEATHER & SOIL CONDITIONS
sunny, warm, soil workable (though damp)
PROGRESS INSPECTION ❑
IS SITE CURRENTLY UNDER NOTICE OF VIOLATION? No
VIOLATIONS
❑ a. No approved plan 31-4 (c) ❑ g. Inadequate buffer zone 31-5 (a)(1)
❑ b. Failure to follow approved plan 31-5 (f) ❑ h. Graded slopes and fills too steep 31-5 (b)
❑ c. Failure to submit revised plan 31-6 (m) ❑ i. Unprotected exposed slopes 31-5 (b)
❑ d. Failure to provide adequate groundcover 31-5 (d) ❑ j. Failure to maintain erosion control
measures 31-13
❑ e. Insufficient measures to retain sediment on site 31-7 (e) ❑ k. Notice of activity initiation 31-6 (j)
❑ f. Failure to take all reasonable measures 31-4 (d) ❑ I. Other (describe)
PHASE OF GRADING: Final grading complete
POTENTIAL NPDES PERMIT VIOLATION? No
HAS SEDIMENTATION DAMAGE OCCURED? Yes
❑ Lake/natural watercourse on the tract
❑ Lake/natural watercourse off the tract
INSPECTION REPORT IN CASE FILE DUE TO File
DATE GIVEN/SENT
CORRECTIVE ACTIONS NEEDED
DEGREE OF DAMAGE:
❑ Other property
❑ Road/walkway
E9 - rinspsedimentationreport 09/16/2022 1533 Page 1 of 2
$A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
SEDIMENTATION INSPECTION REPORT
" INSPECTION ECINSP-581709
1842 5M In Compliance
CONCLUSION
COMMENTS maintain ground cover
Permanent ground cover sufficient to restrain erosion has been established.
No additional self -monitoring or self -inspections are required.
Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated.
REPORT BY Toni Norton
E9 - rinspsedimentationreport 09/16/2022 15:33 Page 2 of 2