Loading...
HomeMy WebLinkAboutNCC191246_NOT Closeout Documents_20220921$A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT SEDIMENTATION INSPECTION REPORT INSPECTION ECINSP-581709 In Compliance CASE NUMBER: ECPC-08-2019-119883 PROJECT: PARCEL/ADDRESS: 277002985930 1394 HENRY RIVER RD, HICKORY NC 28602 START DATE: 07/12/2022 Tuesday 10:01 am COMPLETION DATE: 07/12/2022 Tuesday 10:01 am CONTACT LIST Financier *KEY BUILDERS, INC., 1459 NORTH ASPEN ST NORTH ASPEN ST, LINCOLNTON NC 28092-3361, H:7047350040B:7046340456C:7042309394 INSPECTIONS@KEYBUIL DERSNC.COM Owner *KEY BUILDER, INC., 1459 N ASPEN ST, LINCOLNTON NC 28092, B:7047350040C:70 44668423 KERRI@KEYBUILDERSNC.COM Contractor *KEY BUILDERS, INC., 1459 NORTH ASPEN ST NORTH ASPEN ST, LINCOLNTON NC 28092-3361, H:7047350040B:7046340456C:7042309394 INSPECTIONS@KEYBUIL DERSNC.COM PICTURES: PRINTS: r SLIDES: ❑ DIGITAL: VIDEO: ❑ WEATHER & SOIL CONDITIONS sunny, warm, soil workable (though damp) PROGRESS INSPECTION ❑ IS SITE CURRENTLY UNDER NOTICE OF VIOLATION? No VIOLATIONS ❑ a. No approved plan 31-4 (c) ❑ g. Inadequate buffer zone 31-5 (a)(1) ❑ b. Failure to follow approved plan 31-5 (f) ❑ h. Graded slopes and fills too steep 31-5 (b) ❑ c. Failure to submit revised plan 31-6 (m) ❑ i. Unprotected exposed slopes 31-5 (b) ❑ d. Failure to provide adequate groundcover 31-5 (d) ❑ j. Failure to maintain erosion control measures 31-13 ❑ e. Insufficient measures to retain sediment on site 31-7 (e) ❑ k. Notice of activity initiation 31-6 (j) ❑ f. Failure to take all reasonable measures 31-4 (d) ❑ I. Other (describe) PHASE OF GRADING: Final grading complete POTENTIAL NPDES PERMIT VIOLATION? No HAS SEDIMENTATION DAMAGE OCCURED? Yes ❑ Lake/natural watercourse on the tract ❑ Lake/natural watercourse off the tract INSPECTION REPORT IN CASE FILE DUE TO File DATE GIVEN/SENT CORRECTIVE ACTIONS NEEDED DEGREE OF DAMAGE: ❑ Other property ❑ Road/walkway E9 - rinspsedimentationreport 09/16/2022 1533 Page 1 of 2 $A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT SEDIMENTATION INSPECTION REPORT " INSPECTION ECINSP-581709 1842 5M In Compliance CONCLUSION COMMENTS maintain ground cover Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. REPORT BY Toni Norton E9 - rinspsedimentationreport 09/16/2022 15:33 Page 2 of 2