Loading...
HomeMy WebLinkAbout_External_ RE_ SAW-2022-01996 (NCDOT Division 7 _ removal of Bridge 233 on SR 1964 _ Mebane Bridge Road _ Dan River _ Eden _ Rockingham County)Carpenter, Kristi From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, September 21, 2022 3:13 PM To: nancy.oberle@threeoaksengineering.com; Parker, Jerry A Cc: Conchilla, Ryan; Carpenter,Kristi Subject: [External] RE: SAW-2022-01996 (NCDOT Division 7 / removal of Bridge 233 on SR 1964 / Mebane Bridge Road / Dan River / Eden / Rockingham County) Attachments: 2021 NWP-6.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. 0 Thank you for the PCN received via email from Three Oaks Engineering, dated 8/31/2022. Please also reference the letter from US Fish and Wildlife Service, dated 8/15/2022, confirming findings of "may affect, not likely to adversely affect" for James Spinymussel and Atlantic Pigtoe. Further, reference the letters sent to the Catawba and Monacan Indian Nations, dated 8/30/2022, referencing earlier coordination letters dated 1/25/2022. Given the demonstration of compliance with Nationwide Permit General Conditions 17, 18, and 20 (the geotechnical borings as described in the PCN will not affect the historic bridge), the above referenced bridge replacement project is authorized under Nationwide Permit (NWP) 6 and does not require further notification. Attached is a copy of the NWP 6 and the applicable permit conditions. Please note that the project must be accomplished in strict accordance with the attached conditions and your submitted description, and any violation of the attached conditions or deviation from your submitted description may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. The Action Identification Number for this project is SAW-2022-01996. Note that NCDOT is still responsible for the following condition pertaining to the Northern long-eared bat, as this project occurs in NCDOT Divisions 1-8: The U.S. Fish and Wildlife Service's (USFWS's) Programmatic Biological Opinion (PBO) titled, "NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8'; dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable agreed upon conservation measures in the PBO, which are incorporated by reference in this permit. Failure to comply with the applicable these conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. Please let me know if you have any questions regarding the above information. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: NCDOT_REG <NCDOT_REG@usace.army.mil> Sent: Wednesday, August 31, 2022 5:03 PM To: nancy.oberle@threeoaksengineering.com Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: SAW-2022-01996 (NCDOT Division 7 / removal of Bridge 233 on SR 1964 / Mebane Bridge Road / Dan River / Eden / Rockingham County) Good afternoon, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Wednesday, August 31, 2022 2:40 PM To: NCDOT_REG <NCDOT REG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Rockingham - DOT A new project has been received on 8/31/2022 2:33 PM for Removal of Bridge No. 780233 on Mebane Bridge Road over the Dan River. The link below will take you to the project folder. https://edocs.deg. nc.gov/Laserfiche/i ndex.aspx?d b=WaterResources#id=2474688;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.