Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-08960_Well Construction - GW1_20220919
WELL CONSTRUCTION RECORD_ GW-1 For Intemal Use Only: j 1.Well Contractor Information: � � 3� Ricky Corriher SEP t. 2n22 - WellContractorName FROM TO DESCRIPTION 2464-A In;;;r :en �r.�c :r: Unil 37 oft 3%Ott lod t/ J��IOi6OG ft ft NC Well Contractor Certification Number MUM — Frank A. Corriher& Sons Well Drilling, Inc. FROM TO DIAMETER TffiCKNESS MATERIAL ft ft I in Company Name �n/,Q Q 2.Well Construction Permit#: +7 V � 0 � FROM I TO DIAMETEn TBIcxivEss MnTERlnI Litt all applicable well construction permits(t.e.UIC,County,State,Variance,etc.) t1 ft ,? fk 1D SDR-21 PVC 3.Well Use(check well use): 5-2—ft- d tt �' � in. f� Water Supply Well: FROM TO DIAMETER SLOTSIIE THICIINFss MATERIAL ❑Agricultural ❑M 'cipal/Public tt ft. in. ❑Geothermal(Heating(Cooling Supply) esidential Water Supply(single) ft ft in ❑IndustriaUCommercial ❑Residential Water Supply(shared) ❑Irri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft 22 ft Bentofiite Hole Plug QMonitoring ❑Recovery ft. ft Injection-Well:- _ it ft ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM I TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft ft ❑Experimental Technology ❑Subsidence Control ft ft ❑Geothermal(Closed hoop) ❑Tracer ❑Geothermal(Heating/Cooling Retam) ❑Other(explain under#21 Remarks) FROM TO DES ON color hardness,wnlroek etc © ft it 4.Date Well(s)Completed: Well ID# ft ft 5a.Well Location: > 'fL ft S �� 40L '7 L Wit e- ��, Facility/OwverName Facility ID#(if applicable) it ft 1 fl UL5/1,6, Rd 6o�,��'vl-110 ft Physical Address,City,and Zip % it zf County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: f 6.1s(are)the well(s): ermaneut or ❑Tempor;OX Signature of led Well Contractor Date By signing thisform,I hereby cemfv that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner repair under#21 remarks section or on the back ofthis form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW 1 is needed Indicate TOTAL NUMBER of wells (add'See Ovee in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft) For multiple wells Cut all depths ifdifferent(example-3©200'and 2@100) Submit this GW-1 within 30 days of well completion per the following: O24a. For All Wells: Original)form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft) Information Processing Unit,1617,MSC,Raleigh,NC 27699-1617 If water level is above casing,use 11.Borehole diameter: 6" 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC;Raleigh,NC,27699-1636 12.Well construction method: Air Drill 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the-, (Le.auger,rotary,cable,direct push,etc.) county envu'Unmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells prodacm' 'over 100,000 GPD:Copy to DWR,CCPCUA Air Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield Wm) 100 Method of test: 13b.Disinfection type:Sterilene Amount Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018