HomeMy WebLinkAboutNC0025496_Approval_20220926DocuSign Envelope ID: DB7D7787-D36D-4946-B557-26EC797DF37B
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
City of Lincolnton
Attn: Daniel Perry, Pretreatment Coordinator
P.O. Box 617
Lincolnton, NC 27093
Email: dperry@lincolntonnc.org
NORTH CAROLINA
Environmental Quality
9/26/2022
Subject: LTMP Approval
Program Name: Lincolnton
NPDES Permit No NC0025496, 3.5 MGD
City of Lincolnton WWTP
Lincoln County, MRO
Dear Permittee,
The Municipal Unit of the Division of Water Resources has reviewed the Long -Term Monitoring Plan (LTMP)
for City of Lincolnton's wastewater treatment plant (WWTP) working under the NPDES Permit No NC0025496
(effective on September 1, 2021). The LTMP was submitted to the Division on August 30, 2022, in response to
the August 29, 2022, DWR's HWA and LTMP Review Letter. LTMP revisions were received on September 16,
2022. The LTMP was updated to include the Revision History section and update lower practical quantitation
limits (PQLs).
The review indicates that the revised LTMP is adequate and meets the requirements needed to establish a site -
specific Headworks Analysis (HWA). Proper implementation of an LTMP is also required by your NPDES
permit. Please refer to the Comprehensive Guidance for North Carolina Pretreatment Programs (Comprehensive
Guide) for additional information and examples. Modifications to the LTMP must be approved by the Division.
Regardless of approval action today, within 180 days of the effective date of any reissued or modified NPDES
permit the Permittee would be required to submit to the Division a written technical evaluation of the need to
revise local limits (i.e., an updated IWS, or documentation of why one is not needed). This action may include
revising, updating, or adding to the list of Significant Industrial Users (SIUs). Pursuant to 15A NCAC 2H
.0907(b) either the Division or the permittee may initiate pretreatment program revisions.
Federal and State pretreatment regulations require the local delegated pretreatment program to effectively control
and document the discharge of wastewater from Significant/ Categorical Industrial Users to the POTW. It is the
POTWs responsibility to ensure these objectives are constantly met.
Thank you for your continued cooperation with the Division's Pretreatment Program. If you have any questions or
comments, please contact Keyes McGee at (919) 707-3626 [email: keyes.mcgee@ncdenr.gov].
Sincerely,
w�1 ""DocuuSigned by:
� L ��
ikt. 61, VLF ( , alb
C464531431644FE...
for Richard E. Rogers Jr., Director
Division of Water Resources
dy/linc olnton. ltmp. 007.2022
Attachments:
Lincolnton.LTMP.2022
cc with attachments:
City of Lincolnton, Superintendent/ Donald Burkey
DWR - Morresville Regional Office — Pretreatment/Wes Bell
Municipal Unit File and Central Files (Laserfiche)