Loading...
HomeMy WebLinkAboutNCC223360_ESC Approval Submitted_20220926ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 14, 2022 LETTER OF APPROVAL WITH MODIFICATIONS The Ervin John Neumaier, III Revocable Trust ATTN: Mr. Ervin Neumaier, III 300 State St., Apt. 256 Knoxville, TN 37902 The Michele Neumaier Revocable Trust Attn: Ms. Michele Neumaier 300 State St., Apt. 256 Knoxville, TN 37902 RE: Project Name: NEUMAIER HOUSE Acres Approved: 1.65 Project ID: HENDE-2023-006 County: Henderson City: Mills River Address: 1020 Tole Allison Rd. River Basin: French Broad Stream Classification: Boylston Creek - Class WS-IV Submitted By: Fusco Land Planning & Design, PLLC - Mr. Matt Fusco, PLA Date Received by LQS: August 15, 2022 Plan Type: Residential Dear Sir or Madam, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at D E Q n North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORT.4 CARCuNh + ova e�ioie�.,o meAM' G al /'� 828.296.4500 Letter of Approval with Modification The Ervin John Neumaier, I1I, Revocable Trust The Michele Neumaier Revocable Trust September 14, 2022 Page 2 of 4 deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Fre Wa ker, P. e. Express Engineer Division of Energy, Mineral, and Land Resources Letter of Approval with Modification The Ervin John Neumaier, III, Revocable Trust The Michele Neumaier Revocable Trust September 14, 2022 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: NEUMAIER HOUSE Project ID: HENDE-2023-006 County: Henderson For final plan approval please provide to this office the requested documents listed below. 1. Provide elevational data on propose contour lines. [G.S. 113A-57.(4)] 2. Add note to E&SC plan that any borrow or waste must come from or go to a permitted site and or facility. Note on plan the waste and or fill site permit number. [15A NCAC 04B .0110] 3. Geotechnical engineer stamp or sign off required for wall design over 4 ft., verify with county building permitting to verify any county requirements. [G.S. 113A- 57.(4)] 4. Provide construction details for swale specified in boulder wall detail, surface preparation, and matting installation. [G.S. 113A-57.(3)] S. When using the Rational Method (only for watersheds smaller than 5 acres) for runoff calculations, use a rational runoff coefficient of 0.60 for bare earth conditions. [15A NCAC 04B .0108] 6. If discharging onto slope 5% or greater increase stone apron length and width and potentially stone size to account for discharge onto grade. [15A NCAC 04B .0108] 7. Revise construction sequence to include the following language: no major grading activities or basin construction are to take place during wet weather or periods of predicted wet weather i.e. Hurricanes; file for NPDES NCGO10000 e-Notice of Termination when final close out inspection report is received from NCDEQ LQS; provide a maximum amount of linear ft that linear projects can have open at one time (500 ft.); install inlet protection by the end of the workday; site must be "storm ready" before any extended breaks in construction activities including weekends. [15A NCAC 04B .0106(a)(2)] 8. Verify with local county authority for post -construction stormwater permitting requirements. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Letter of Approval with Modification The Ervin John Neumaier, I11, Revocable Trust The Michele Neumaier Revocable Trust September 14, 2022 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Mr. Matt Fusco, PLA (matt fuscola.com) Ms. Shawna Riddle - NCDEQ-LQS (shawna.riddle@ncdenr.gov) Mr. Landon Davidson, PG - NCDEQ-DWR (landon.davidson 0)ncdenr.gov) Mr. Andrew Moore, PG - NCDEQ-DWR (andrew.w.moore Oncdenr.goy) cc: Regional Office file