Loading...
HomeMy WebLinkAboutNCC192008_NOT Closeout Documents_20220912North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Robeson Project: River Route 23kV Feeder Rebuild River basin: Lumber Person financially responsible: Duke Energy Progress, LLC - Christopher Project #: ROBES-2020-006 Spangler, Project Manager II, CD Engineer Address: 410 South Wilmington Street NCO2, Raleigh, NC 1. Project Location: NC Hwy 72, Lumberton Pictures: No 2. Weather and soil conditions: Clear Soil Workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Chris Spangler Inspection report: Sent Report 9. Corrective action needed: Title: Project Manager Date given/sent: September 23, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO10000) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Nicholas Mills Others present: Date of inspection: September 23, 2022 Time arriving on site: 10:00 AM Time leaving site: 10:30 AM cc: