HomeMy WebLinkAboutNCC223237_Site Plan or Location Map_20220923fit.
74` It -
-+ y i
�' %
PROJECT EXTENTS
" AkVi :�
VICINITY MAP
NOT TO SCALE
N LATITUDE AND LONGITUDE:
LAT .
35'
10'
35.02"
N
LONG.
79'
23'
48.97"
W
OWNER:
TOWN OF SOUTHERN PINES
125 SE BROAD ST.
SOUTHERN PINES, NC 28387
PROJECT SCOPE:
BANK STABILIZATION AND FLOW DIVERSION
TO PROTECT EXISTING SEWER LINE.
HEADCUT STABILIZATION ADJACENT TO
PARKING LOT.
PROJECT CONTACT INFORMATION:
PROJECT MANAGER: EMILY BROWN, PE
FREESE AND NICHOLS, INC.
EMILY.BROWN@FREESE.COM
919-582-5852
TOWN ENGINEER/ASSISTANT PUBLIC SERVICES DIRECTOR: JAMES MICHEL, PE
TOWN OF SOUTHERN PINES
910-692-1983
JMICHEL@SOUTHERNPINES. NET
TOWN OF SOUTHERN PINES
,_RTEFt
MCDEEDS CREEK
STREAMBANK STABILIZATION
AREA
KEY MAP °
SCALE: 1"=50'
JANUARY 2022
50' 100,
SCALE IN FEET
� FREESE
WIM'<'NICHOLS
531 NORTH LIBERTY STREET
WINSTON-SALEM, NC 27101
PHONE - (336)790-6744
WEB - www.freese.com
SPN20739
SHEET INDEX
GENERAL
G-1 COVER
G-2 GENERAL NOTES
CIVIL
C-1 STA 0+00 TO STA 3+00
DT-1 DETAILS
DT-2
DETAILS
DT-3
DETAILS
DT-4
DETAILS
EROSION AND SEDIMENT CONTROL
ES-1 STA 0+00 TO STA 3+00
ES-2 EROSION CONTROL DETAILS
ES-3 EROSION CONTROL DETAILS
ES-4 EROSION CONTROL DETAILS
ES-5 NCG01 REQUIREMENTS
ES-6 NCG01 REQUIREMENTS
�N. � A R 4�
SEAL
048934 -
ly 0
Freese and Nichols, Inc.
North Carolina Registered Engineering Firm C-3916
100% DESIGN