HomeMy WebLinkAbout10_NCS000544_Bioretention O&M Plan_20220922Permit Number:
(to be provided by DWQ)
Drainage Area Number:
Bioretention Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important operation and maintenance procedures:
— Immediately after the bioretention cell is established, the plants will be watered
twice weekly if needed until the plants become established (commonly six
weeks).
— Snow, mulch or any other material will NEVER be piled on the surface of the
bioretention cell.
— Heavy equipment will NEVER be driven over the bioretention cell.
— Special care will be taken to prevent sediment from entering the bioretention cell.
— Once a year, a soil test of the soil media will be conducted.
After the bioretention cell is established, I will inspect it once a month and within 24
hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblems:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
bioretention cell
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe,
The pipe is clogged (if
Unclog the pipe. Dispose of the
stone verge or swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Stone verge is clogged or
Remove sediment and clogged
covered in sediment (if
stone and replace with clean stone.
applicable).
Form SW401-Bioretention O&M-Rev.3 Page 1 of 4
BMP element:
Potentialproblems:
How I will remediate theproblem:
The pretreatment area
Flow is bypassing
Regrade if necessary to route all
pretreatment area and/or
flow to the pretreatment area.
gullies have formed.
Restabilize the area after grading.
Sediment has accumulated to
Search for the source of the
a depth greater than three
sediment and remedy the problem if
inches.
possible. Remove the sediment and
restabilize the pretreatment area.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand.
The bioretention cell:
Best professional practices
Prune according to best professional
vegetation
show that pruning is needed
practices.
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Tree stakes/wires are present
Remove tree stake/wires (which
six months after planting.
can kill the tree if not removed).
The bioretention cell:
Mulch is breaking down or
Spot mulch if there are only random
soils and mulch
has floated away.
void areas. Replace whole mulch
layer if necessary. Remove the
remaining much and replace with
triple shredded hard wood mulch at
a maximum depth of three inches.
Soils and/or mulch are
Determine the extent of the clogging
clogged with sediment.
- remove and replace either just the
top layers or the entire media as
needed. Dispose of the spoil in an
appropriate off -site location. Use
triple shredded hard wood mulch at
a maximum depth of three inches.
Search for the source of the
sediment and remedy the problem if
possible.
An annual soil test shows that
Dolomitic lime shall be applied as
pH has dropped or heavy
recommended per the soil test and
metals have accumulated in
toxic soils shall be removed,
the soil media.
disposed of properly and replaced
with new planting media.
Form SW401-Bioretention O&M-Rcv.3 Page 2 of 4
BMP element:
Potentialproblems:
How I will remediate theproblem:
The underdrain system
Clogging has occurred.
Wash out the underdrain system.
(if applicable)
The drop inlet
Clogging has occurred.
Clean out the drop inlet. Dispose of
the sediment off -site.
The drop inlet is damaged
Repair or replace the drop inlet.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Annual inspection reports are required as defined in the Town of Butner Ordinance. The
Owner shall keep records of inspections, maintenance and repairs for at least five years
from the date of the creation of the record and shall submit the same upon reasonable
request to the Stormwater Administrator.
Form SW401-Bioretention O&M-Rcv.3 Page 3 of 4
Permit
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Creedmoor O'Reilly Auto Parts
BMP drainage area number:
Print name: Brittney Whitley
Title: Development Project Manager
Address: 736 Cherry Street, Chattanooga, TN 37402
423-771-0304
Signature:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, e-)sZ C k-I 6 n d.0 C a Notary Public for the State of
County of �`o M', { o f�, do hereby certify that
personally appeared before me this
U
day of UDO, cam, �n I to , and acknowledge the due execution of the
forgoing bioretention maintenance requirements. Witness my hand and official seal,
•STATE
TENNESSEE t
= NOTARY ;
TpW 0
4811%,���
SEAL
My commission expires / / -I / ) 9
Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4