HomeMy WebLinkAboutNCG150045_Renewal Issuance Notification Letter_20220906ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Lew Bleiweis
Asheville Regional Airport
61 Terminal Dr Ste 1
Fletcher, NC 28732
NORTH CAROLINA
Environmental Quality
September 6, 2022
Subject: NPDES General Permit Renewal and Electronic Reporting Requirements
Asheville Regional Airport
NPDES Permit Certificate of Coverage (COC) Number: NCG150045
Dear Permittee:
For coverage under Stormwater General Permit NCG150000, issued on July 1, 2022, the Division of
Energy, Mineral, and Land Resources (DEMLR) is notifying you that your reissued Certificate of Coverage
(COC) is available. This permit is reissued pursuant to the requirements of North Carolina General
Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the
U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) You must
do two things:
(1) Request and print a copy of your new Certificate of Coverage (COC) via this website:
https://edocs.deg.nc.gov/Forms/SW-COC-Renewal
(2) Obtain a copy of the new NCG150000 General Permit from our website here:
https://deg.nc.gov/about/divisions/energy-mineral-land-resources/npdes-stormwater-gps.
In addition to the full permit, revised monitoring forms and information about changes from the
previous permit are available at that website.
The General Permit authorizes discharges of stormwater and/or wastewater, and it specifies your
obligations with respect to discharge controls, management, monitoring, and record keeping. Please
review the new permit to familiarize yourself with all changes in the reissued permit. Your facility has six
months from receipt of the permit to update your Stormwater Pollution Prevention Plan (SPPP) to
reflect any new permit requirements.
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA _
uepe nt of Emmnmenmi uennry 919.707.9200
How does the new General Permit affect Tier Status?
The first sampling period in this General Permit began July 1, 2022. Sampling prior to this date may not
be used to satisfy sampling requirements. Also, Tier 3 actions are triggered by benchmark exceedances
on four occasions beginning on the effective date of this permit and do not count prior exceedances.
Likewise, Tier 2 actions are triggered by two consecutive benchmark exceedances beginning on the
effective date of this permit and do not count prior exceedances. However, if your facility is already in
Tier 2 (monitoring stormwater discharges monthly) or Tier 3, you must continue monthly monitoring
until relieved through conditions of the permit or by DEMLR staff approval.
Electronic DMR Reporting Information
We continue to onboard permittees with NPDES stormwater permits into the DEQ's eDMR system. If
you have not yet registered to report through eDMR for this permit, please visit https://deg.nc.gov/sw-
eDMR. For questions about eDMR registration, please contact Kieu Tran at kieu.tran@ncdenr.gov.
As a reminder, until you are reporting monitoring data through eDMR, please follow this revised
process for submitting paper DMRs and uploading a copy to your permit file:
Complete, sign, scan and upload the DMR within 30 days of receiving sampling results with this
form: https://edocs.deg.nc.gov/Forms/SW-DMR.
Mail the original, signed hard copy of the DMR to the appropriate DEMLR Regional
Office (https://deg.nc.gov/contact/regional-offices). Do notsend DMRs to Central Files in
Raleigh! This is a change from past practice.
Once registered and also reporting through eDMR, submitting paper copies or uploading them
through the above form is no longer necessary.
Your coverage under the General Permit is transferable only through the specific action of DEMLR. This
permit does not affect the legal requirements to obtain other permits which may be required by the
N.C. Department of Environmental Quality (DEQ), nor does it relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order,
judgment, or decree.
For questions about the General Permit, please contact Brittany Carson at brittany.carson@ncdenr.gov
or Paul Clark at paul.clark@ncdenr.gov. For questions about on-line COC requests, please contact
Bethany Georgoulias via email at bethany.georgoulias@ncdenr.gov.
Sincerely,
for Brian Wrenn
Director, Division of Energy, Mineral, and Land
Resources
Cc: Stormwater Program Permit File
D�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
EQ
_ 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA
oana�am of auai� F� 919.707.9200