HomeMy WebLinkAboutNCS000589_Renewal Application_20210729DUKE
ENERGY;
PROGRESS
July 22, 2021
Certified Mail # 7019 2280 0001 4397 3037 (2 copies)
Ms. Susan McCoy
North Carolina Division of Energy Mineral and Land Resources
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Subject: Duke Energy Progress, LLC
Weatherspoon Steam Station NCS000589
Industrial Stormwater Permit Renewal
Dear Ms. McCoy,
W. H. Weatherspoon Plant
491 Power Plant Rd
Lumberton, NC 28358
Maifing Address:
Kent Tyndall
L. V. Sutton Energy Complex
801 Sutton Steam Plant Rd
Wilmington, NC 28401
o. 910.341-4775
RPCEJ� -
JUL 2 g 2021
I)EtVP-LA'
IO O�ab TY
STORMb1g TER PER MITTI VG
Duke Energy Progress, LLC requests that the subject permit be renewed and reissued. The
subject permit expires on January 31, 2022. Section III Part B. of this permit requires the
application for renewal be submitted at least 180 days prior to the expiration date of the permit.
If there are any questions, please contact either:
• Mr. Kent Tyndall, EHS Professional for the W. H. Weatherspoon Plant;
phone (910) 341-4775 or e-mail Kent.Tvndall@duke-enerov.com; or
• Ms. Elizabeth Glenn, Environmental Specialist in our Permitting and Compliance Group,
phone (980) 373-0530 or email Elizabeth.Glenn@duke-energv.com.
Sincerely,
Keith Douthit
Interim General Manager
Enclosures:
Renewal Form
Supplemental Information
Site Map from Stormwater Pollution Prevention Plan
Summary of Analytical Monitoring Results
Summary of Visual Monitoring Results
Summary of Best Management Practices
Certification of the Development and Implementation of the SPPP
A
,jZA
NCDENR
Permit Coverage
Renewal AoDlication Form NPDES Permit Number
National Pollutant Discharge Elimination System NCS PermitNu
Stormwater Individual Permit 89
Please provide your
permit number in box in the upper right hand corner, complete the information in the space provided
below and return the completed renewal form along with the required supplemental information to the address indicated.
Owner Information
* Address to which permit correspondence will be mailed
Owner/ Organization Name: Duke Energy Progress, LLC.
Owner Contact:
Jessica Bednarcik - Senior VP EHS Operations Support & CCP
Mailing Address:
PO BOX 1006
Charlotte NC 28201-100-6---
Phone Number:
704-382-8768
Fax Number:
E-mail address:
Jessica.Bednardk@duke-energy.com
Facilitv Informatio
Facility Name:
Weatherspoon Steam Station
Facility Physical Address:
491 Power Plant Road
Lumberton, NC 28358
Facility Contact:
Kent Tyndall
Mailing Address:
801 Sutton Steam Plant Rd
Wilmington, NC 28401
Phone Number:
910-341-4775
Fax Number:
E-mail address:
kent.tyndall@duke-energy.com
Permit Information
Permit Contact:
Elizabeth Glenn
Mailing Address:
526 South Church St ECI-13K
Charlotte, NC 28202
Phone Number:
980-373-0530
Fax Number:
E-mail address:
elizabeth.glenn@duke-energy.com
Discharge Information
Receiving Stream: Lumber River
Stream Class: % w
Basin: Lumber River
Sub -Basin:
Number of Outfalls:
Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a
separate sheet if necessary.
No significant changes
CERTIFICATION
I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief
such information is true, complete and accurate.
%
Signature Date Z2-- 3ui-'-p 7-oZi
Keith Douthit General Manager
Print or type name of person signing above Title
SW Individual Permit Coverage Renewal
Please return this completed application form Stormwater Permitting Program
and requested supplemental information to: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
(Do not submit the site Stormwater Pollution Prevention Plan)
Initials
JEG 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
JEG 2. A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled, and storm event data.
JEG 3. A summary of the Visual Monitoring results. Do not submit individual monitoring
reports. The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
JEG
4. A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
JEG 5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
practices, and/or changes in the raw materials used by the facility.
JEG 6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility (Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to Fling the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal
waiting on lab results)
CATLIN
OVKE ENERGY PROGRESS, LLC
SITE MAP WITH ASH HAULING ROUTE
FIGURE
WEATHEftEPOON PLPNT
AND STORMWATER DISCHARGE OUTFACES
LUMBERTON, NC
�� ....-..e,arumd
NO'' 797255.35 °"" JULY 2017
SCA" AS SHOWN o-g;WF' THW " JRC
s %w ftfgWROJEC➢IN9 I9z2V CPet Mdfft.:MUVan SW PPI69umsftvm 3 MW
Permit Number NCS000589
FACILITY NAME W. H. Weatherspoon Steam Station
arm urs r uun'rcu
vurm,
talena:
r rear:
Date
Nan-
Oulfall
Sample
Total
pH
TSS
Polar
Antimony
Arsenic
Beryllium
Cadmium
Chromium
Copper
lead
Mercury
Nickel
SeleniumFflcr�7t.rB..rn
Thalliium
Oil &
Na.
Coliecled
Rainfall
Grease
Sb
As
Be
Cd
Cr
(a
Pb
H
Ni
Se
7
I.,
mo/dd/ r
`inches
Units
m /L
m L
m /L
m /L
mall.
m 1, _
m L
In
In
n /L
m L
m L
m L
nr
m /L
m
Benchmark
6l0 9
Value
SU
too
15
0.09
0.34
0.065
0.003
0.9
0.01
0.075
12
0.335
0.056
0.0003
0.126
SW-1
3rd Q
2017
No discharge
SW-1
4thQ
er No discharge
g
SW-1
I st Q
2018
No discharge
SW -I
2018
No discharge
SW-1
2018
No discharge
SW-1
4th Q 2018
No discharge
SW-1
Ist9
e No discharge
g
SW-1
2nd Q 2019
No discharge
SW -I
20I9
No discharge
SW-1
2019
No discharge
SW-1
1st Q 2020
No discharge
SW-1
2nd Q 2020
No discharge
SW-1
3rd Q 2020
No discharge
SW1
411Q
2020
No discharge
g
SW-1
IstQ
2021
No discharge
SW-1
2nd Q
2021
No discharge
Permit Number NCS000589
W. 11, Wcsnhttspoon Steam
PACILITYNARIF. Siauon
Samples Collected Durine Calrnda, Year: 'OI ]J0I 1)
Out all
No.
:Date
Sample
Collected
_._.......
Total
Rainfall
..____
pH
-
TSS
Non-
Polar
Oil &
Crease
Antimony
Sb
Arsenic
As
Beryllium
Be
Cadmium
Cd
Chromium
Cr
Copper
Cu
Lead
Pb
Mercury
H
Nickel
Nt
Selenium
Se
Silver
ALn
'Line
13nron
B
Thalliium
TI
mo/d r
inches
Units
m L
m L
m L
m L
m,
m L
m L
m
m L
n L
m L
m
m
m
m
m L
Value k ISe
Value
100
IS
0.09
0.34
0.065
0.003
0.9
0.01
0.075
12
0335
0,056
0.0003
0.126
SW-2
3rd Q 2017
No dischar
e
SW-2
12l82017
283
7.27
55
<4.8
<0.001
0.0018
<U.O01
<0.W1
O.W327
0.0056Y
0.0126
6.15
OAU242
<0.001
<0.0003
OU56
<0.05
<0.0002
SW-2
3/122018
0.51
7.24
3j
<4.8
<0.001
0.0019
<0.001
<0.001
O.U0252
0.0059
0.00916
6.R9
0.00194
<0.001
<0.0003
U.029
c0.05
<0.0002
SW-2
5242018
0.33
7.59
25
<j,2
<0.001
0.0043
c0.001
<p.001
0.00172
0.00599
0.00107
8.7
0.00211
<0.00190
<0.0003
0.024
0014
<0.0002
SW-2
3rd Q2018
No discharge
SW-2
12/14/2018
L29 8.02 110 1 <4.8 <0.001 0.0025 <0.00I <O,OOI4 1 0,00515
10.00975 1 0.0163 1 8.59 1 0.00437 1 <0.001 1 <0.0002 10.077 <0.05 <0.000205
SW-2
Ist Q 2019
No discharge
SW-2
2nd Q2019
No discharge
SW-2
3rd Q 2019
No discharge
SW-2
11/152019
0.82
7.67
22
<5.0
<O.001
0.0017
<0.001
<0.001
0.00299
0.00460,00388
.
<0,.0002
<0..05
<O.O(02
SW-2
12/132019
0.87
7.9
14
<5.00
<0.0
10.005<0.001<0.001
28
<0.001
<0.001
0.00I
0.00804
0.00606
9.93
.
000583
.047
<0.000224
3/52020
1.12
8.2
47
<5
<00SW-2
0.00353
0.00688
0.00495
10
0.004
<0.001
<0.0002
0047
<0.05
<0.0002
SW-2
4202020
92
<5.0
<0.001
0.0039
<0.001
<0.001
0.0050
0009
0.00699
10.5
0.00621
<0.001
0.O00245
0.109
<0
29
SW-2
9/17/2020
2.3
7.12
170
<5.0
<0.001
0.0031
<0.001
<0.001
0.0093
0.01390.0107
11.6
0.0163<.001<0.00020.103<0.050
.000276
SW-2
4h 2020
No i
S2
1st 2021
No discharge
SW-2
I 2nd Q 202I
1 No dischar e
Permit Number NCS000589
FACILITY NAME W. 11 Wealherspoon Steam Snmmn
Samples Collected During Calendar Year:-(117-2-1) 11)
Outfall
No.
Date
Sample
Collected
Total
1 ainfall.
pH
TSS
Non-
Polar
011&
Grease
Antimony
Sb
Arsenic
As
Beryllium
Be
Cadmium
Cd
Chromium
Cr
Copper
Cu
Lead
it
Mercury
14
Nickel
Ni
SeleniumISA.1
Se
ilver
Zinc
Zn
Boron
B
Thalliium
TI
mo/dd r
inches
Units
m L
m
an
m L
m
m L
m L
m L
m
o
m L
m
m
m
m L
m L
Benchmark
Value
b-9
SU
100
I5
0.09
0.34
0.065
0.003
0.9
0.01
0.075
12
0.335
0.056
0.0003
0.126
SW-3
3rd Q 2u17
No discharge
SW-3
41h Q 2017
_
No discharge
SW-3
Ist Q 2018
No discharge
SW-3
2nd Q 2018
No discharge
SW-3
3rd Q 2018
No discharge
SW-3
4th Q 2018
No discharge
SW-3
Ist Q 2019
No discharge
SW-3
2nd Q 2019
No discharge
SW-3
3rd Q 2019
No discharge
SW-3
4th Q 2019
No discharge
SW-3
Ist Q 2020
No discharge
SW-3
2nd 0 2020
No discharge
SW-3
3rd Q 2020
No discharge
SW-3
4th Q 2020
No discharge
SW-3
I Ist 2021
No discharge
SW-3
I 2nd Q 2021
No discharge
DUKE
•: E N E RGY,
Facility Name: Weatherspoon Steam Station
County: Robeson
Site Contact: Kent Tyndall
Individual NPDES Permit No.
Phone Number:
Clutfall Number:
NCS000589
910.341.4775
SW001
Summary of Stormwater Outfall Discharge (SDO) Qualitive Monitoring Reports
Discharge Assessment
Date
Color
Odor
Clarity
Floating
Solids
Suspended
Solids
Foam
Oil Sheen
Erosion/
Deposition
Total Event
Precipitation
(in)
8/14/2017
Light
None
2
1
1
no
no
no
0.94
12/8/2017
No Discharge
no
3.26
3/12/2018
No Discharge
no
0.56
5/24/2018
No Discharge
no
0.33
11/15/2019
No Discharge
no
0.82
12/13/2019
No Discharge
no
0.87
3/5/2020
No Discharge
no
0.72
4/20/2020
No Discharge
no
0.28
9/17/2020
No Discharge
no
2.3
3/16/2021
No Discharge
no
0.81
Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 = Worst Case
i DUKE
vk. ENERGY.,
Facility Name: Weatherspoon Steam Station
County: Robeson
Site Contact: Kent Tyndall
Individual NPDES Permit No.
Phone Number:
Outfall Number:
NC5000589
910.341.4775
SWO02
Summary of Stormwater Outfall Discharge (SDO) Qualitive Monitoring Reports
Discharge Assessment
Date
Color
Odor
Clarity
Floating
Solids
Suspended
Solids
Foam
Oil Sheen
Erosion/
Deposition
Total Event
Precipitation
(in)
8/14/2017
Light
none
2
1
1
no
no
no
0.94
12/8/2017
Light
none
3
1
1
no
no
no
3.26
3/12/2018
Tan/light
none
3
1
1
no
no
no
0.56
5/24/2018
Tan/medium
none
3
1
1
no
no
no
0.33
11/15/2019
Tan/light
none
1
1
1
no
no
no
0.82
12/13/2019
Tan/light
none
2
1
2
no
no
no
0.87
3/5/2020
Gray/medium
none
3
1
1
no
no
no
0.72
4/20/2020
Tan/light
none
2
1
2
no
no
no
0.28
9/17/2020
Tan/light
none
2
1
2
no
no
no
2.3
3/16/2021
Gray/dark
none
5
1
3
no
no
no
0.81
Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 = Worst Case
DUKE
ENERGY=,
Facility Name: Weatherspoon Steam Station
County: Robeson
Site Contact: Kent Tyndall
Individual NPDES Permit No.
Phone Number:
Outfall Number:
NCS000589
910.341.4775
SWO03
Summary of Stormwater Outfall Discharge (SDO) Qualitive Monitoring Reports
Discharge Assessment
Date
Color
Odor
Clarity
Floating
Solids
Suspended
Solids
Foam
Oil Sheen
Erosion Deposition
Total Event
Precipitation
(in)
8/14/2017
Light
none
2
1
1
no
no
no
0.94
12/8/2017
No Discharge
no
3.26
3/12/2018
No Discharge
no
0.56
5/24/2018
No Discharge
no
0.33
11/15/2019
No Discharge
no
0.82
12/13/2019
No Discharge
no
0.87
3/5/2020
No Discharge
no
0.72
4/20/2020
No Discharge
no
0.28
9/17/2020
No Discharge
no
2.3
3/16/2021
No Discharge
no
0.81
Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 = Worst Case
POTENTIAL POLLUTANT SOURCE #1
COAL ASH
(Coal Ash Hauling Route)
BEST MANAGEMENT PRACTICES
2017 PROPOSED BEST
• Trucks will be loaded within the ash basin area
MANAGEMENT PRACTICES:
• Trucks will be equipped with a secure cover to prevent
ash from blowing off during transport
• Trucks will be washed of ash residue within Ash basin
area
• Trucks will obey a 15 mile per hour speed limit while on
Duke property
• Ash Hauling Route clear of ash, fugitive dust or debris
• Ditches, swales, and storm inlets along ash hauling route
clear of ash, fugitive dust or debris
• Any significant erosion or sediment in any stormwater
conveyance systems along ash hauling route
• Stormwater Junction Box # 2 clear of debris or excess
sediment
• Stormwater Junction Box # 1 clear of debris or excess
sediment
Implement Good Housekeenina and Preventative Maintenance
rocedures and erform visual inspections.
*ADDITIONAL COMMENTS:
DEP, LLC; Duke WS SPPP FINAL 2017
CATLIN Project No. 197255.35
CATLIN Engineers and Scientists
15 July 2017
POTENTIAL POLLUTANT SOURCE #2
VEHICLE DRIPS
(Coal Ash Hauling Route)
BEST MANAGEMENT PRACTICES
2017 PROPOSED BEST
• Trucks should be inspected for leaks or drips prior to
MANAGEMENT PRACTICES:
entering property
• Trucks should be inspected for leaks or drips prior to
exiting property
• Fueling operations to be performed off -site
• All vehicle maintenance activities to be performed off -
site
• Ash Hauling route clear of any fluids, spills or drips
from trucks
Vehicles will not be parked on -site overnight. Implement Good
Housekeeping and Preventative Maintenance procedures and
perform visual inspections.
*ADDITIONAL COMMENTS:
DEP, LLC; Duke INS SPPP FINAL 2017
CATLIN Project No. 197255.35
CATLIN Engineers and Scientists
16 July 2017
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
North Carolina Division of Energy, Mineral, and Land Resources - storm water Permitting
Facility Name:
Permit Number:
Location Address:
County:
Steam Station
491 Power Plant Rd
Lumberton NC 28358
Robeson
I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
" I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
Sign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
Signature—
Keith Doulhit
Print or type name of person signing above
Date _Zz 7UC,`i Zazj
General Manager
Title
SPPP Certification 10/13