HomeMy WebLinkAboutNCC223279_ESC Approval Submitted_20220920GREENSBORO
NORTH CAROLINA
LETTER OF APPROVAL
September 15, 2022
Chris Raughley
Pulte Home Company, LLC
1225 Crescent Green Drive, Suite 250
Cary, NC 27518
RE: Project Name: Mackay Pointe Townhouse Construction
Address: 5281 Mackay Rd.
Jamestown, NC 27282
36.021 15,-79.9199
Plan Number: 2022-1 141 Disturbed Acreage: 5.80
Dear Mr. Raughley,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and that requirements have been met to issue a grading
permit. The enclosed grading permit must be posted at the job site. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity
has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction Stormwater General Permit. After the form is
reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is received, you will receive the COC via
email. You must obtain the COC prior to commencement of any land disturbing
activity. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions
about the NOI form to the Stormwater Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party is
required to apply for his/her own COC.
Title 15A NCAC 413 .01 18(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
PO BOX 3136 • GREENSBORO NC 27462-3136 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489)
840
GREENSBORO
NORTH CAROLINA
Letter of Approval
Plan Number: 2022-1 141
9/15/2022
Page 2 of 2
Also, this letter gives the notice required by G.S. 1 13A-61.1 (a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 1 13A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal, State and local water quality laws, regulations, ordinances and rules. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are requested
to file an amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
Cass A. Heaton
Erosion and Sediment Control
City of Greensboro
Enclosures: NCG01 Fact Sheet
City of Greensboro Grading Permit
cc: Ken Binkley, Pulte Group
File
PO BOX 3136 • GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489)
840