Loading...
HomeMy WebLinkAboutNCC191640_Annual Fee NOD Letter_20220916RCY COOPER Gownx ELIZABETH S. BISER 5 , f-Y BRIAN WRENN rxrq�-Xr 9/16/2022 Wynn Construction Attn: Edward Averett 2550 Capitol Drive, Suite 105 Creedmoor, NC 27522 Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC191640-2022 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 8/1/2022 and was due on 9/1/2022. The annual fee applies to the following construction site: Lot Clearing Plan for Lot 122 at Anderson Creek Crossing, Ph 8, Sec 2A 100 Wildlife Bridge Court, Spring Lake, NC Harnett County Certificate of Coverage No. NCC191640 NC Reference No. NCG01-2019-1640 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources Yu„ NIria Utpaffmemor @WVMffleMCd1Qohlity I ❑IVISICM^&gWeal BnALand Rteartes11E 512 NanhSalin6ury &rEI1612 AfH5rVioC&mI "Amigh.1orthCErolin92764-1h12 914.707.9200