Loading...
HomeMy WebLinkAboutGW1-2022-08738_Well Construction - GW1_20220823 Print Form WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1. Well Contractor Information: John Salmon 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION 3497 - A 40 ff 72 ff Shells and grey sand ft. ft. NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) Applied Resource Management FROM TO DIAMETER THICKNESS MATERIAL �V� 0 ft. 42 ft. 4 in. 40 PVC Company Name 2022077085 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit 4: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e. UC,County,State, Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL PI Agricultural [3Municipal/Public 42 ft. 72 fL 4 in. 10 40 PVC Geothermal(Heating/Cooling Supply) [IResidential Water Supply(single) ft B• in. PIIndustrial/Commercial [3IResidential Water Supply(shared) 18.GROUT ipIrrigation FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft. 42 ft Bentonite Poured Monitoring DRecovery Injection Well: LJft. ft. Aquifer Recharge Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ®IAquifer Storage and Recovery Dl Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD [3AquiferTest [:]I Stormwater Drainage 42 ff 72 ff # 2 gravel Poured Experimental Technology [:]I Subsidence Control ft. ft. bGeothermal(Closed Loop) [:IITraeer 20.DRILLING LOG attach additional sheets if necessary) so Geothermal(Heating/Cooling Return)) [:]I Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness, il/rock type,grain size,etc. 0 ft. 10 ff Black top soil 4.Date Well(s)Completed: 7/22/2022 WeIl IDa 10 ft. 40 ft. Fine sand mixed with clay 5a.Well Location: 40 ft. 72 ft. Grey sand with shells Russell May Facility/Owner Name Facility ID#(if applicable) 7260 Alexander Road NE Physical Address,City,and Zip ft. ft. Brunswick 0460000101 2L REMARKS County parcel Identification No.(PIN) Grouted as per the 2 C 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) 22.Certification: 78 5' 45.828" N 34 12' 45.248" w wzl�f-15'C,4Xe0l 7/22/2022 6.Is(are)the well(s):®IPermanent or EITemporary Sig re of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: []IYes or ®No with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a Ifthis is a repair,fill out known well construction information and explain the nature of the copy ofthis record has been provided to the well owner. repair under 421 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 72 (ft-) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3CJ)200'and 2@100') construction to the following: 10.Static water level below top of casing: 13 (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing use'-" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 7 7/8 m. ( ) 24b. For Iniection Wells: In addition to sending the form to the address in 24a 12.Well construction method: Mud Rotary above, also submit one copy of this form within 30 days of completion of well construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 18 Method oftest: Air Lift 24c. For Water Supply& Iniection Wells: In addition to sending the form to o the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: HtH Amount: 20�o completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016