Loading...
HomeMy WebLinkAboutGW1-2022-08613_Well Construction - GW1_20220513 `� `L Cv�NSTRNC'TI+IN��,C RII, 0"IV- i For Internal Use Only: p 1.Well Contractor formation:, ef-at Val 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION S�'I ~/1-- Ott• t � I Slon NC Well Contractor Certification Number 15, UTER CASING for multi-eased W ORLINER U a livable YADKIN WELL COMPANY,INC. FROM To DIAMETER T8It3INEss larA&RIAL ft, ft. in. Company Name 66 ,ag 16.U04ER CASING OR TUBING eothexmal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER I THICIUMS MATERIAL List all applicable well construction permits rLe.E1C,County,State Tlarionce,etc-) l ft ft /' [m in. S V/J r1 e 0 uc_ 3.Well Use(ebeckwell use): % ft D J in. 1 dt r Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE TffiCKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft, io. ❑Geothermal(Heating/Cooling Supply) N(zsidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: t7 ft. Li . ,y { Pau r ❑Monitoring ❑Recovery 11 ft ft. L?fi1�c ,+ C f h7 Injection well: ft. R ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK rf a livable) ❑Aquifer Storage and Recovery ❑Salinity Bamer FROM TO MATERIAL EAU?LACrMENTM=01) ❑Aquifer Test ❑Storrawater Drainage ft' ❑Experimental Technology ❑Subsidence Control ft ft. c ❑Geothermal'(Cltised Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heatiug/Cooling Betum)- ❑Other'(explain under#21 Remarks) FROM xo DESCRIPTION color,hardaess,eoVrock tiu sire ett 6 ft. ft 4.Dattbwell(s)Completed rh� Well W# — lf F It. ft 5a Well Loca`tion: Phone # BaX�- /l/ '7Q 31 fL �a ti �� ft ftIf M Facility/OwnerName Facility ID#(if applicable) ft' ft MAY 1 0 44 P, Pbysieal Aadress,city,aria tip a to pJ� 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: S� (ifwell field,one lat/longis sufficient) 22.Certification: N - �R, 5 73 wqn Lf— 6.Ls(are)the well(s): erm inent or ❑Temporary Signature of Certified Well Contractor Date By signing thisform,l hereby cer*that the well(s)was(were)constructed in accordance with 7.Is this a repair to an eidsting well: ❑Yes or *0 ISANCAC 02C.0100 or 15ANC4Ci02C•0200 Well Construction Standards and that a copy 1phis is a repalr,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair render#21 remarks section or on the back of this form.. 23.5ite diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 OW-1 is needed. Indicate TOTAL NUMBER of wells (add See Over'in Remarks Box).:You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: V O� (ft') Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths(f dierent(example-30a 200'and 2@1001 �0 o% 24a. For All Wells: Original foim to Division of Water Resources (DWR), 10.Static water level below top of easing: (ft.) Information Processing Unit 16 7 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 11.Borehole diameter �s (in.) sit Off' �5. R 5- 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 Ia C� 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open`-Loop Geothermal Return Wells:Copy,to_the (i.e.auger,rotary,cable,direct push,etc.) bounty environmental health department of the county where in§telled A FOR WATER SUPPLY W LLS ONLY: 24d.For`Water.wells producinaiover 100,000 GPD: Copy to DWR,CCPCUA,-- t Permit Program;1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) ✓ 3 Method oftest: / 70%HTH OZ ,, DATE SITE VISITED: ,e2'L 7 Q- I 13b.Disinfection type: Amount: VISITED