Loading...
HomeMy WebLinkAboutGW1-2022-08482_Well Construction - GW1_20220411 �� � .363.'�w'n�.,.z"a'Y+�1 t .7•,x"*',s z 4 t� .�v-�'�b, 'z , _ n x; x a r sr.-n a ic$� '� k.- <ta > n tt r •.d .... ..t'' •'' Mks '' m , t c FROM PTO !FD&SCRIYdTION :i.'"".. +�s a - �l95 Sa So D v _ -1 �!01 NC iWeII Contractor CertifieationNnmber 151KUUTEWCASINIGi r—,xdul64Mediivell`s 10RMV.=!if'lieatil`e `lADK1N 1NELl COMPANY,INC, ytFROMTa fEnIAn�I�Ita TXr�CraysssMATBRIAL. Company Name ' `. W"II4NER1CAS1Ii1GiO ""`4isenrmal closed-loop) � �V �,. 2. Nell Cllnstruction Permit#: *PROMAINN litTTo MDIAMBTER TMCF04ESs I MATERW. List all,pppllaable,well coastructtan usr C Cow' Slatq`*Yarlan'Mr x }..:.. _. 3.Well Use(checkwell use): A. 17.SCREEN Water Supply Well: PP Y FROM TO DIAM TrR SLOT SIZE THICIGitSS MATERIAL ❑Agricultural ❑Mimicipal/Public ft. fr. in. ❑Geothermal(Heating/Cooling Supply) Residential Water Supply(single) ft it in. ❑Industrial/Commercial (❑_Residential Water Supply(shared) 18 GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENTTSETHOD&AMOIINT Nan-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery ft ft. Injection Well: v ft. ffi ❑Aquifer Recharge ❑Groundwater Remediation 19,SAND/GRAVEL PACK da lieable) !� ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPI ACEMENTMETHOD ❑Aquifer Test ❑Storinwater Drainage ft. ft ❑Experimental Technology ❑Subsidence Control fL ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necrssa ❑Geothermal(Heating/Cooling Retum) ❑Other(explain under#21 Remarks) FROM To DESCR=ON(=]or,hardness,soll/mck a grain she,ete Q 3`1 2 ft- -7CP2-yL 4.Date Wells)Completed: y�-Z— Well W# p—! 3 & ft' 5a.Well Location: / ,q�Phone # ?D .S3 • ft. fft ft Facility/OwnerNern Facility ID#(ifapplicable) ft. ft l Y, lip eo &b 6ct(e, 11y'Lf ft. ft Physical Address,City,and Zip sL 020 ft ft -ir'f /1e 21.RE MAFM County Parcel Identification No.(PIN) - 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/longis sufficient) 22.Certification: ,3 g 2 T S-3 N !2 49- 11.l W 6.Is(are)the well(s): Aermanent or ❑Temporary Si#Kre of CediEcdWell Contractor Date By signing thisform,I hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to an eldsting well: t,'.J�I��es or PINo �� 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fdl out known well construction biformation and ex to fhe n ture of the of this record has been provided to the well owner repair under i<21 remarks section of an the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 C}W-1 is needed. Indicate TOTAL NUMBER of wells (add See Over in Remarics Box).You may also attach additional pages if necessary. drilled:_ ( 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 70�' (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths lfdi�erent(example-3(a 200'and 2Q100D 24a. For All Wells: Original form to Division of Water Resources (DWR), f Static water level below top of easing: (ft.) Information Processing Unit,1617'MSC,Raleigh,NC 27699-1617 Tfwater level is above casing,use"+" � Bit Off: ,, 919 24b.For Injection Wells: Copy to DWF-,Underground Injection Control(IUC) 11.Borehole diameter: (in.) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing,over 100,000 GPD: Copy to DWR,CCPCUA � Perini 161 �,Raleigh,IQC 27,�99-I611 13a.Yield(gpm) 7 Method of test: �l�t� qq 'Rol e/ t 2 JIB' 70%HTH OZ SITE VISIT 13b.Disinfection type: Amount: