Loading...
HomeMy WebLinkAboutGW1-2022-08298_Well Construction - GW1_20220822 WELL CONSTRUCTION RECORD For Internal Use ONLY This form can be used for single or multiple wells 1.Well Contractor Information: K�14ewATERZONE$' 'e'Sn. . D.T. CHALMERS, JR. FROM TO I DESCRIPTION Well Contractor Name re fL 4146A NC Well Contractor Certification Numbers;rNivER GasING'oRST[rBfNG'othermalflosed-IT o0 FROM - TO I THICKNESS I MATERIAL. .. CATLIN Engineers and Scientists 0 R -1 n. 1 Sch.40 1 PVC Company Name itlb:{OUTER-CASING'fo'r multi=cased.wells ORiI;INERif.a licable FROM I TO I DIAMETER THICKNESS I MATERIAL 2.Well Construction Permit#: N/A fL ft in. List all applicable well permits(i.e.County,State, Variance,Injection,etc.) fL fL in. 3.Well Use(check well use): W7:4sCREEN 01000111101111 Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public -1 rt. 14 rt. 11 in. SIOt.010 Sch.40 PVC i ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. ft. 1, i in. ❑Industrial/Commercial ❑Residential Water Supply(shared) f s'fGROU t.4' .......... s� FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irri ation ft rL Non-Water Supply Well: ®Monitoring ❑Recovery ft fL Injection Well: n. ft ❑Aquifer Recharge ❑Groundwater Remediation A19ASANDt/GitpVELTPa.CKri(a licable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stomlwater Drainage rL rL ❑Experimental Technology ❑Subsidence Control 0 rt. 16 rL Natural Backfill r20:DRILli1NG�IpOG'attach.ddigfonal s-Th trif necessa ❑Geothermal(Closed Loop) ❑Tracer FROM TO I DESCRIPTION color hardness soiVrock type,wain size etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under 921 Remarks) ft ft. 4.Date Well(s)Completed: 08/09/22 Well ID#: TMW-01 rL rL ft. ft 1 Sa.Well Location: (✓ " NCDEQ-SILVER LAKE RD. UST N/A ft All- Facility/Owner Name Facility ID#(ifapplicable) ft.5002 CAROLINA BEACH RD,WILMINGTON,NC 28412 ft. rL Win l r^:;26&,q Unii Physical Address,City,and Zip fill9 iEMARKS NEW HANOVER N/A County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one lat/long is sufficient) 34.14981 N -77.90341 W 8/10/2022 Signature of Certified Well Contractor Date 6.Is(are)the well(s): O Permanent or M Temporary By signing thisforn,1 herehv certifi,that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction,Standards and that a copy of 7.Is this a repair to an existing well: .O Yes or ®No this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed:• 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you SUBMITTAL INSTRUCTIONS can submit one form. 9.Total well depth below land surface: 14.0 (g,) 24a.For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths in different(example-3@200'and 2@100) construction to the following: 10.Static water level below top of casing: (R,) Division of Water kesources,Information Processing Unit, Ifwaler level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 2.25 (in.) 24b.For Infection Wells ONLY: In addition to sending the form to the address in 24a above,also submit a copy of this form within 30 days of 12.Well construction method: DPT completion of well construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: 24c•For Water Svpuly&Infection Wells: Also submit one copy of this form within 30 days of completion of we11 13b.Disinfection type: Amount: construction to the county t 4ealth department of the county where constructed. Adapted from Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised 2-22-2016 f , CATLIN WELL LOG Engineers and Scientists zzoz,a SHEET 1 OF 1 PROJECT NO.: 220214 STATE, NC COUNTY: NEW HANOVER LOCATION: WILMINGTON PROJECT: LOGGED BY: C FUTRAL WELL ID: SILVER LAKE RD. UST DRILLER: D.T. CHALMERS JR. NORTHING: 147348 EASTING: 2331803 CREW: TMW-01 SYSTEM: NCSP NAD 83 USft BORING LOCATION: In Former UST Basin I T.O.C.ELEV.: DRILL MACHINE: Power Probe METHOD: DPT 10 HOURIDTW: NM TOTAL DEPTH: 16.0 START DATE: 8/9/22 END DATE: 8/9/22 24 HOUR DTW: FIAD WELL DEPTH: 14.0 BLOW COUNT OVA o o SOIL AND ROCK WELL DEPTH 0.5ft 0.5ft 0.5ft 0.5ft (PPm) LAB. s G DEPTH DESCRIPTION DETAIL -1.0 0.0 LAND SURFACE 0.0 0.0 (SWG)-Lt.gray,Sandy/Gravel mixture 1.0 (SP)-Brown grading to tan and gray,F.SAND Direct SOIL: Push NM TMW-01 D (2-3') 4.0 4.0 (CH)-LT.gray with orange mottling,highly plastic CLAY Dark gray from 7.0-7.5'BLS Direct NM Sat. > Push o a oa 7.5 8 0 (SP)-Gray,F.SAND Dark brown from 13.0-16.0'BLS Direct NM W Push f - 12.0 Direct WATER: 114.0 Push NM TMW-01 Sat. 16.0 16.0 16.0 BORING TERMINATED AT DEPTH 16.0 ft in F.SAND 17 I I i Native Backfill I