HomeMy WebLinkAbout20141052_EEP Letter_20141001 )� 4yM
W
�'W�tiCW:unmNk+�ll¢nruN.'NL� 4NMAtl✓kuMi@'MWPaM'MIF➢4'&
NCDENR
No th c,�'arrrlllnd:;1 of E nvirorr.nent tnd Nati.n,-d [:�r�sourc t.,s
wi(?Gll'I"1`10', °R(;( r (•'P'r C. �,i,�r` �(v` '�(ii � �{ie?Pi"1
September 30,2014
Mr, Art King
NC:;DC)'L'Division 8 Environmental Officer
North Carolina Department of"Fransportation
902 N. Sandhills Boulevard
Aberdeen,North Carolina 2831
Dear M1. King:
Sub lc ct: l_UP Mitigation Acceptance Letter:
Division 8 Project: Replace Bridge 440 on SR 2261 over Prong Creek, Randolph County
The purpose of this letter is to notify YOU that the Ecosystem Enhancement Program (ELwP)will provide tile,
compensatory stream mitigation for the subject project. Based on the information supplied by you on Septenrtber 30,
2014,. the impacts are located in C'U 1.13030003 of the Cape Fear River basin in the Central Piedmont (CP;I Eco-Region,
and are as follows:
_ ....
Cape Fear Stream Wetlands Bu Her(Sq. I t)
03030003 _ —_ _.._ ..._ ._
Non- Coastal Cl> Gold Cool Warm fisl�ar�tattt Riparian M< Cone I lone 2
.__
Impacts (fee tj acres) to 0 98.0 0 0 0 0 0
...... _.... .._.m.. _._
__ _ __ ...._. ....� ........ ___.......v_
*ti<nrte of the,steam a nd wetland tarotpacts may be proposed to l)cs Initigated at to V:1 11)itigati€on ratio. Sce permit application 661
dd tar I s.
I'lris impact and associated mitigation need were under projected by the NCDOT in the 2014 impact data. EE:I'
will commit to implement sufficient compensatory.stream mitigation credits to offset the impacts associated with this
project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iit of the.N.C.
Department ofLvnvironmertt and Natural Resotu-ecs' Ec€;rosystem Enhancement Program III-Lieu h`ce Instrument dated
July 28, 2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer
be valid and a:r new mitigation acceptance letter will be required from FTP.
If you have any questions or need additional inf6rmation,please contact Beth Llarmon at 919-707-8420.
Sincerely.
.tar 7 :B. Stanf`all
I'L l'Asset N11anagetnent Supervisor
cc: Ms. Liz hair, USAC;'E -Wilmington Regulatory field Office
Mr. Dave Wainwright– NCDWR Raleigh Office
Ms, Linda Fitzpatrick, NCDO 1` - PDE""A
Mr, Philip Beach, SEPI Engineering
File: SIB 2261 Bridge 440 Division 8