Loading...
HomeMy WebLinkAboutNCC191800_NOT Closeout Documents_20220908Sedimentation/ConstrUCtion Stormwater•Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Lenoir Project: Dan and Sue Myers Pond Addition River basin: Neuse Person financially responsible: Dan and Sue Myers, Owner Project #: LENOI-2020-001 Address: 172 Azalea Lane, Snow Hill, NC 28580 1. Project Location: Falling Creek, Kinston Pictures: No 2. Weather and soil conditions: Sunny, cool, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: February 3, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: February 1, 2022 Time arriving on site: 11:00 AM Time leaving site: 11:20 AM cc: From: West A Donald B Subject: Pond Addition Project ILEI\lf)i-2020-0011), Date: Feb 2, 2022 at 9:51:69 AM TO: sue rmyers @g mail. cory-i Cc: Dan Myers . . .... ... . ...... ...... ... Ms. Myers, You have a project with this office #I-EiNOI-L-20210-001 Dan and Sue Myers Pond Addition. The plans I have are for erosion and sedim--nt control. I visited your site yesterday and noticed that the pond and shooting range have all been completed and are stable. Please contact me at your convenience so we can discuss the project. Have a wonderful day. Thankyou Bradley West Environmental Specialist Division of Energy, Mineral, and Land Resources Department of Environmental Quality 252-946-6481 office donald.westflEcdenr.gj2v 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. �J� J�o 2-- *� 6, YiA �t 11 11/r a(444�le ROY COOPER Governor ELIZABETH S. BISER .Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality February 3, 2022 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Mr. Dan and Mrs. Sue Myers 172 Azalea Lane Snow Hill, North Carolina 28580 Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Bradley West Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report D� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889 om�+ct�m�lmv / f 25294b.b481