Loading...
HomeMy WebLinkAboutGW1-2022-08095_Well Construction - GW1_20220826 WELL CONSTRUCTION RECORD a This form can tie used for single or multiple wells wr .1.Well Contractor Information-:--tf � O�'1N 3.S Y cSlr2Qle I4.waTl:R•z o FROM TO DESCRIPTION Wall Contractor Nano ft. ft. ft. ft. NV Well Contractor Cenification\timber 35.OUTER CAS for mit[ti-evaetF iveFM R LFNER tf a i FR0.�4 TO DL1h1Emat TH1CwT S MATERIAL ••1 V1 1 br'i 11 F t�1G1 rt. ft. I . - at I Pvc Cempam'tamc - 16.ININERCASFN OR TV theriiizd'doseQ-loo FROM TO I DIAMETER 7 1TH[CKtiFSS MATERIAL 2.Well Construction Permit#: ft• ft• in f led all appkwh/r:well cnurtracvion permiar 11.e.Counp•,slate,I"I ianee.el-^./ ft. ft. ia• I 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DTANIETER SLOTSi2E THICK�FESS MATERIAL ft. ft. in. OAgricultural ON unicipal/Public OGeotherinal(I•Ieating/Cooling Supply) csidenual Water Supply(single) ft. ft. Olndustria{iCommerclzi OResidennal Water Supply(shared) 18 GROLtT { it OM TO %1ATER[4,L E'1tPLAC£M&1TMErROD&AMOC'%T {Olrrr¢auan re. a�"fa �'1X Y Nou-Water Supply Well: rt. te, {❑lvionitoring CRecovery Injection Well: uAqulfer Recharge .-Groundwater Remediation 9..SANDIGRAVEL.PACt; if iIAL FROM TO M.4TERIAL E\SPLACEMttYrglErftOD i OAgwfer storage and Recovery OSalinity Barrier ft. ft. {:_,Aquifer"Pest UStonnwater Drainage ft. ft. (=Experimental Technology OSubsidence Control 2G.DRILLING LOG attach additional sheets if neeessary 0Geothermai(Ciused Loop) OTraeer 920M TO DESCRIP770N eaiorhardrfest saithaclt e.-ninrize,e:c.l CGcothernsal(Heatin=Cooling Return) OOther(explain under 421 Remarks) fa ft. ft. fr. 4.Date Welt(s)Completed: V� ft, ft. i.1Yc1!Location: fr. ft. f. ft. fr. iaalii).b%tnc;Va;+sc i� /� Facility to-fifapplicable) ft. ft Pt i 'caI Address.Cm,and Zip 2I.R£hCARKS 1[n3013G C'ount%. P-6.1ldcruilieatioallo(PIN) 56.Latitude and Longitude in degrees/minutes/seconds or deeima!degrees: 22.Certification: (if troll field,one lationg is suffieien) rypp����' Sisnaitire of Cenified%Veil Conttaclar- Date 6.Is(are)the well(s): epermanent or OTemporary yy siVung+his fnrin.1 hereby cerrdy 11ta1 the 61,en;rn,tttratlrrl rr,attrrrrkurre e•ub iSA 4R:'A('!I?t'.(110t1 nr lS.A 4('rt['0$' 0?fill lYiil t buffer cimu.�anulnrrl5 rnnllhur a 7.is this a repair to an existing well: ❑Y!s or iVo caps of thre retnrd hat beau provided to the well n,r nee. It ring 1a to reparr.hll am/klaxa»•ell crmrwr enrul rnformaniol and vrpkdn lift naalre tit the repair under..-2/remark.•.vecitan or ai the back gfilds faun. 23.Site diagram or additional well details: you may use the back of this page to provide additional%cell site details ar well V . 8.Number of wells constructed: construction details You may also attach additional pages if necessary ForFor nurkrple n+lrcl1r:m outgo-ira/rr.rnp/r/t'a t//e 0141 F'w 11F,the.taivta crutarraellaN.1'ou tan l it one/gear 24.Submittal Instructions- �-.•' 9.Total well depth below land surface: W / (ft.) 24a. For All Wells: Submit this form within 30 daYs of completion •: µµµµ.gib2 Ibra+rdul+le isellihrlall depdci Arlrllerent leroulph••3• 200,01111? a 111U'l construction to the following fa is 2�22 _ - -i- -- - ----- - Ur, - 10.Static water level below top of casing: (ft,) Division of Water Quality,Information Processing r;�;;y 5�n : f • ..^-� I!ua1,-r/r:vl r.Awe Laval.rc,e" 1617 Mall Service Center,Raleigh,NC 27699-1617 fit;±; I 24b.For Inieetion Mena: In addition to sending the i'orm to the address in2•4, 11.Borehole diameter: (in.) above, also submit a copy of this form within 30 days of cumolrnoi: of%veil 12.Well construction method:- ,-An far Ll construction to the following. (le auger,rotary.cable.ducct push,ere.) Division of Water Quakily-Onder'oround injection Control Program, 13.FOR WATER SitPPI.1'WELLS ONLY: 1636;Nail Service Center,Raleigh,NC 27699.1636 I t 24c,For Wate,_3¢pjrly&Gaitlterma!Wrfls: In addition to sending the form sa 13a.1'ictd A elfv% Method of test:�+sy' �1(��� ) (e'pm) the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: 1r Amount _ completion of Weil construction to the county health department of the county where constructed. Fomi OW-1 North Carolina Departmmt of Environment and Natural Resources-Division of Wafer Quality, tensed lai:2013