Loading...
HomeMy WebLinkAboutSite Inspection 9.9.22 Br 79 TellicoWetland Inspection Report Project Num: 20201576 Version: 2 Project Name: NCDOT - Replace Bridge 79 on SR 1369 County: Macon Location: NCDOT - Replace Bridge 79 on SR 1369 Latitude: +350 16' 33" SW Plan Location: Site Owner Name: NC DOT Division 14 - Sylva Inspection Date: 9/9/2022 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: On -Site Representative(s): Primary Inspector: Robert K Mitchell Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Status: Issued Project Type: Replace bridge with bridge Region: Asheville Longitude: -83' 30' 30" Phone: Phone: Inspection Summary: Site Inspection was conducted on September 9, 2022 by Kevin Mitchell with the Asheville Regional Office. Parker Williams was present during the inspection. The following are items that need attention: - Cover exposed bank soils between the silt fence and JS. - Recommend cover on exposed slopes that are not protected by the structure(bents). These items were discussed with Parker. NPDES records were up to date. Trout Moratorium - January 1 - April 15. page: 1 Site Number: 20201576 Owner: Blazer, Keith Inspection Date: 9/9/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ page: 2