Loading...
HomeMy WebLinkAboutNCC191949_NOT Closeout Documents_20220907�pE,x OAT O�' h C Peak City Partners LLC Vaibhav Dahwan 1330 Sunday Drive, Ste. 105 Raleigh, NC 27607 Re: Certificate of Completion Project Name: Peak City Business Park Buildings 7 & 8 Project Location: 2201 Energy Drive Project Number: 18-040 Submitted By: Jones & Cnossen Engineering Submitted Date: June 3, 2019 Completion Date: September 2, 2022 WATER RESOURCES September 2, 2022 THIS IS TO CERTIFY that on the above referenced project the grading has been completed, temporary S&E measures have been removed, and permanent ground cover sufficient to restrain erosion has been established as outlined on the approved S&E Plan and in accordance with the Town of Apex S&E ordinance. Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. The owner of the site will be responsible for regular erosion control maintenance after this release to the developer. James Misciagno, CES, CPESC Environmental Field Services Supervisor Town of Apex Stormwater Engineering TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org