Loading...
HomeMy WebLinkAbout20121079 Ver 1_Certification of Completion_20140929DWQ Project No.: z'1 � 1 a ` y. County: VVYSJ+Vt Applicant: Project Name: -- -- - -- Date of Issuance of 401 Water Quality Certification: DgCe-yy lt,� Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the Applicant is required to return this certificate to the 40i Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates' from all of these. Applicant's Certification I, �LCLti'td Viii hereby state'that, to the best of my abilities, due care and diligence was use& in the observation A the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, nd er support g materi s. Signature: Date: ?Z fit` - Agent's Certification I, _ , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that.the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: 1, _ _, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and o er supporting materials. Signature —_ Registration N D V Date _ SEP 9 pv,' 9 1014 TAN OR W E TATIpNPS/ Q O R eS /T