Loading...
HomeMy WebLinkAboutU5710A_Permit Drawings_20190821(Version 2.08; Released April 2018) 50115.1.2 TIP No.:U-5710A County(ies):New Hanover Page 1 of 2 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? Yes Design/Future:Year:2040 Existing:Year: Aquatic T&E Species?No Comments: No N/A N/A Wetlands within Project Limits? High Quality Waters (HQW) None Supplemental Classification: Commercial/Residential UT to Bradley Creek 18-87-24-4-(1) N/A 0.251 miles Project Description Proposed Project White OakRiver Basin(s): City/Town: 4.7 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) Yes mlbass@ncdot.gov Address: 8/15/2019 New HanoverWilmington Michael Bass Castle Hayne, NC 28429 WBS Element: New LocationWBS Element: Joshua MassrockNCDOT Contact: 910-341-2000 Suit 900 Raleigh, NC 27601 Contractor / Designer: 919-232-6631 555 Fayetteville St. North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: 5501 Barbados Blvd.Address: General Project Information U-5710A50115.1.2 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) Project Description: The proposed project (U-5710A) is a new alignment connector between US 74 (Eastwood Road) and SR 1409 (Military Cutoff Road) in New Hanover County, NC. Impact Minimization Efforts: The team has designed a 2' Base Tail Ditch (Detail A) to receive roadway runoff from the project to minimize direct runoff into the adjacent jurisdictional stream. The tail ditch is approximately 42' long with 3:1 side slopes with a ditch slope of 0.6%. N/ABuffer Rules in Effect:SA mercury (Hg) N/A (4) 12'-0" travel lanes with curb and gutter and 33'-0" grass median. Waterbody Information N/A NCDWR Stream Index No.: NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class SCNCDWR Surface Water Classification for Water Body ac. N/A - New Alignment 24,000 joshua.massrock@hdrinc.com Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/A Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) DMH Impacts Wetland & Stream SHEET __ OF __ PERMIT DRAWING SITE 1 SITE 2 VICINITY MAP (NOT TO SCALE) V = = =MPH ADT ADT INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN 0 00 C O N T R A C T : A R T MEN N A S O H D E P T O F TRA SPORT T IO N T A TEOFN RT CAR O LI N A N o r t h _ C a r o li n a _ D e p t _ o f _ T r a n s p o r t a t i o n \ 2 0 1 4 _ 1 6 _ P la n n i n g _ D e s i g n _ L S A \ U _ 5 7 1 0 _ T O _ 4 _ c \ 0 6 . 0 0 _ P r o j e c t _ E n g i n e e r i n g _ a n d _ D e s i g n \ U - 5 7 1 0 A \ H y d r a u li c s \ P E R M I T S _ E n v i r o n m e n t a l\ D r a w i n g s \ U 5 7 1 0 A _ P R M _ T S H . d g n J M A S S R O C 7 / 2 9 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt 4 : 1 7 : 3 8 P M N C D O T _ p e r m i t s _ N O C O N . t b l P E N T A B L E : T I M E : D A T E : P L O T D R I V E R : U S E R : F I L E : DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 Prepared by the Office of: 2020 2040 STATEWIDE TIER PHILLIP E. ROGERS, PE CASEY E. HARRIS, PE PROPOSED TRAFFIC SIGNAL DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. N.C. SHEET 1 P.E. TOTAL SHEETS T I P P R O J E C T : 0 9 / 0 8 / 9 9 See Sheet 1A For Index of Sheets See Sheet 1B For Conventional Symbols NAD 83/NA 2011 NCDOT CONTACT TYPE OF WORK: LOCATION: 2018 STANDARD SPECIFICATIONS LENGTH ROADWAY TIP PROJECT U-5710A = GRADING, PAVING, DRAINAGE AND SIGNALS MILES U-5710A NEW HANOVER COUNTY U - 5 7 10 A 40 URBAN COLLECTOR 4,800 24,000 AND SR 1409 (MILITARY CUTOFF RD.) CONNECTION BETWEEN US 74 (EASTWOOD RD.) NEW LOCATION NORTHWESTERN QUADRANT 74 TO W RIG H TSVILLE BEA C H TO M LK JR PKW Y TO OLEANDER DR. TO MARKET ST. U S 7 4 (EA S TW O O D RD .) MILESTOTAL LENGTH TIP PROJECT U-5710A = 76 GALLEON LN. MICHAEL BASS -Y2- CLIPPER LN. PORTSIDE DR. US 74 ( E AS T W O O D R D.) DRYSDALE DR. SR 14 11 ( W RI G H TSVI LLE AVE.) SR 2782 (WRIGHTSVILLE AVE.) MODIFIED TRAFFIC SIGNAL THERE IS PARTIAL CONTROL OF ACCESS ON THIS PROJECT 50115.1.2 N/A 76 US 74 ( E AS T W O O D R D.) 74 76 -L- STA. 23+68.78 END TIP PROJECT U-5710A -L- STA. 10+44.11 BEGIN TIP PROJECT U-5710A -Y2- STA. 11+51.74 END CONSTRUCTION 5 6 7 D R Y S D A L E D R. 7 5 % P LA N S 20 10 20 40 20 10 20 40 5 2.5 5 10 PEMBROKE JONES DR. AL L E NS L N. AL L E NS L N. R O G E R VI L L E R D. RO G E RV IL L E RD . BAY CREEK DR. VERRAZZANO DR. 0.251 0.251 -L- CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III. LETTING DATE: APRIL 21, 2020 - Y3 - THIS PROJECT IS WITHIN THE MUNICIPLE BOUNDARIES OF WILMINGTON US 17 (MILITARY CUTOFF RD.) U S 17 M ILITARY C U TO FF RD . 17 17 17 JANUARY 21, 2019 4 L N. VI KI N G - Y4 - -Y5- -Y3- STA. 11+94.81 END CONSTRUCTION -Y2- STA. 10+46.41 BEGIN CONSTRUCTION PROJECT END PROJECT BEGIN 1S F D 1S F D 1S F D 1S F D 1S F D1S F D1S F D 80" BLK WALL 80" BLK WALL CLIPPER LN 18' BST CLIPPER LN 18' BST CONC 20.5' CONC 21' CONC 21' 15" C&G 168 TOP=24.42' OUT=19.07'8" PVC 1S F D 1S F D 1S F D C ON C 2 1' C ONC 2 1' CON C 2 1' C ONC 2 1' LT ECM E IP (NW) IN=19.10' (NE) IN=19.12' 48" CHL CONC B K 4 8 " WIRE S 48" WIRE I S F D BL-3 BL-4 80" BLK WALL WOODS WOODS SHEET __ OF __ PERMIT DRAWING F F F F F F F C C C F FF F C -Y3- POT Sta. 10+00.00 -L- POC Sta. 15+12.47 = -Y3- POT Sta. 12+04.82 - Y3 - 15+00 CR CR CR CR CR CR SURFACE WATER DENOTES IMPACTS INSS TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * LEGEND: SITE 1 M A T C H LI N E - L- S T A . 1 9 + 6 0 , S E E S H E E T 7M A T C H LIN E - L- S T A . 1 4 + 0 0 , S E E S H E E T 5 U-5710A 6 NAD 83/ NA 2011 SEE SHEET 9 FOR -Y3- PROFILE SEE SHEET 8 FOR -L- PROFILE PROPOSED SIGNAL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R O W R E V . - J U N E 19 , 2 0 19 - A D D E D TC E TO P A R C E LS 1 & 2 . A D D ITIO N A L P D E A N D TW E A K E D RO W O N P A RC E L 2 . R ED U C E D TC E O N P A RC E LS 6 , 7 , 8 A N D 9 . C E H . E LIM IN A TIN G C LA IM S . P A R C E L 15 A A D D E D F O R EA S TP O R T H O A . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R E D TO P A R C E L 1 . A D D E D RIG H T O F W A Y A N D TC E A R O U N D C E N TER P O IN T S TU B O U T O N P A RC E L 1. RE M O V E D TC E O N P A RC E LS 3 & 5 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S P E N T A B L E : F I L E : N o r t h _ C a r o li n a _ D e p t _ o f _ T r a n s p o r t a t i o n \ 2 0 1 4 _ 1 6 _ P la n n i n g _ D e s i g n _ L S A \ U _ 5 7 1 0 _ T O _ 4 _ c \ 0 6 . 0 0 _ P r o j e c t _ E n g i n e e r i n g _ a n d _ D e s i g n \ U - 5 7 1 0 A \ H y d r a u li c s \ P E R M I T S _ E n v i r o n m e n t a l\ D r a w i n g s \ U 5 7 1 0 A _ P R M _ P S H . d g n U S E R : J M A S S R O C D A T E : 8 / 1 9 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt P L O T D R I V E R : 5 : 4 2 : 2 7 P M T I M E : N C D O T _ p e r m i t s _ N O C O N . t b l HYDRAULICS AC C A AC AC SEE DETAIL 'A' 2' BASE TAIL DITCH POND B 3:13: 1 D ( Not to Scale) 2' BASE TAIL DITCH FROM STA. 19+42 TO STA. 20+00 -L- LT DETAIL A B= 2 Ft. Min. D= 3 Ft. Ground Natural Ground Natural Length = 42 FT Slope = 0.6% CB(F) 15" RCP-IV 15" RCP-IV 15" RCP-III CB(F) CB(G) CB(G) CB(G) EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE CB(G) CB(G) 18" RCP-IV 18" RCP-IV 15" RCP-IV CB(F) CB(G) CB(F) 15" RCP-IV RCP-III 30" 2 4 " RC P - IV 15" RCP-IV 1S F D 1S F D 1S F D 1S F D 1S F D1S F D1S F D 80" BLK WALL 80" BLK WALL CLIPPER LN 18' BST CLIPPER LN 18' BST CONC 20.5' CONC 21' CONC 21' 15" C&G 168 TOP=24.42' OUT=19.07'8" PVC 1S F D 1S F D 1S F D C ON C 2 1' C ONC 2 1' CON C 2 1' C ONC 2 1' LT ECM E IP (NW) IN=19.10' (NE) IN=19.12' 48" CHL CONC B K 4 8 " WIRE S 48" WIRE I S F D BL-3 BL-4 80" BLK WALL WOODS WOODS SHEET __ OF __ PERMIT DRAWING 1 9 2 0 2 1 2 1 22 22 2 2 2 2 2 2 22 23 23 23 2 3 2 3 23 2 3 23 24 24 24 2 4 2 5 2 5 25 F F F F F F F C C C F FF F C -Y3- POT Sta. 10+00.00 -L- POC Sta. 15+12.47 = -Y3- POT Sta. 12+04.82 - Y3 - 15+00 CR CR CR CR CR CR SURFACE WATER DENOTES IMPACTS INSS TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * LEGEND: SITE 1 M A T C H LI N E - L- S T A . 1 9 + 6 0 , S E E S H E E T 7M A T C H LIN E - L- S T A . 1 4 + 0 0 , S E E S H E E T 5 U-5710A 6 NAD 83/ NA 2011 SEE SHEET 9 FOR -Y3- PROFILE SEE SHEET 8 FOR -L- PROFILE PROPOSED SIGNAL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R O W R E V . - J U N E 19 , 2 0 19 - A D D E D TC E TO P A R C E LS 1 & 2 . A D D ITIO N A L P D E A N D TW E A K E D RO W O N P A RC E L 2 . R ED U C E D TC E O N P A RC E LS 6 , 7 , 8 A N D 9 . C E H . E LIM IN A TIN G C LA IM S . P A R C E L 15 A A D D E D F O R EA S TP O R T H O A . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R E D TO P A R C E L 1 . A D D E D RIG H T O F W A Y A N D TC E A R O U N D C E N TER P O IN T S TU B O U T O N P A RC E L 1. RE M O V E D TC E O N P A RC E LS 3 & 5 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S P E N T A B L E : F I L E : N o r t h _ C a r o li n a _ D e p t _ o f _ T r a n s p o r t a t i o n \ 2 0 1 4 _ 1 6 _ P la n n i n g _ D e s i g n _ L S A \ U _ 5 7 1 0 _ T O _ 4 _ c \ 0 6 . 0 0 _ P r o j e c t _ E n g i n e e r i n g _ a n d _ D e s i g n \ U - 5 7 1 0 A \ H y d r a u li c s \ P E R M I T S _ E n v i r o n m e n t a l\ D r a w i n g s \ U 5 7 1 0 A _ P R M _ P S H . d g n U S E R : J M A S S R O C D A T E : 8 / 1 9 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt P L O T D R I V E R : 5 : 4 1 : 4 3 P M T I M E : N C D O T _ p e r m i t s _ C O N . t b l HYDRAULICS AC C A AC AC SEE DETAIL 'A' 2' BASE TAIL DITCH POND B 3:13: 1 D ( Not to Scale) 2' BASE TAIL DITCH FROM STA. 19+42 TO STA. 20+00 -L- LT DETAIL A B= 2 Ft. Min. D= 3 Ft. Ground Natural Ground Natural Length = 42 FT Slope = 0.6% CB(F) 15" RCP-IV 15" RCP-IV 15" RCP-III CB(F) CB(G) CB(G) CB(G) EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE CB(G) CB(G) 18" RCP-IV 18" RCP-IV 15" RCP-IV CB(F) CB(G) CB(F) 15" RCP-IV RCP-III 30" 2 4 " RC P - IV 15" RCP-IV CLEARING LIMITS WETLANDS SHEET __ OF __ PERMIT DRAWING 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 8 / 2 3 / 9 9 PROJ. REFERENCE NO.SHEET NO.0 P E N T A B L E : F I L E : U 5 7 1 0 A _ P R M _ X P L _ L U S E R : _ U S E R N A M E _ D A T E : 7 / 2 9 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt P L O T D R I V E R : 5 : 3 8 : 5 2 P M T I M E : N C D O T _ P F L _ X S C . t b l 20 20 30 30 10 10 15+50.00 20 20 30 30 10 10 16+00.00 20 20 30 30 10 10 16+50.00 20 20 30 30 10 10 17+00.00 20 20 30 30 10 10 17+50.00 20 20 30 30 10 10 18+00.00 X-3U-5710A -L- 5 10 SITE 1 0.0250.025 -Y3- FENCE EXIST. PRIVACY 4:1 2 3 . 0 8 22.15 FENCE EXIST. PRIVACY 0.025 3:1 2 4 . 2 2 2 4 . 0 0 0.025 2 5 . 0 5 2 5 . 4 5 22.03 FENCE EXIST. PRIVACY 0.025 4:1 2 4 . 2 2 2 4 . 1 4 0.025 2 5 . 19 2 5 . 5 9 22.41 0.0254:1 2 4 . 16 2 4 . 16 0.025 2 5 . 2 1 2 5 . 6 1 21.96 FENCE EXIST. PRIVACY FENCE EXIST. PRIVACY 0.0254:1 2 4 . 0 4 2 4 . 0 4 0.025 2 5 . 0 9 2 5 . 4 9 22.56 FENCE EXIST. PRIVACY 0.0254:1 2 3 . 8 4 2 3 . 8 4 0.025 2 4 . 8 8 2 5 . 2 8 23.49 SHEET __ OF __ PERMIT DRAWING U-5710A 6A SEE SHEET 9 FOR -Y3- PROFILE SEE SHEET 8 FOR -L- PROFILE PROPOSED SIGNAL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R O W R E V . - J U N E 19 , 2 0 19 - A D D E D TC E TO P A R C E LS 1 & 2 . A D D ITIO N A L P D E A N D TW E A K E D RO W O N P A RC E L 2 . R ED U C E D TC E O N P A RC E LS 6 , 7 , 8 A N D 9 . C E H . E LIM IN A TIN G C LA IM S . P A R C E L 15 A A D D E D F O R EA S TP O R T H O A . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R E D TO P A R C E L 1 . A D D E D RIG H T O F W A Y A N D TC E A R O U N D C E N TER P O IN T S TU B O U T O N P A RC E L 1. RE M O V E D TC E O N P A RC E LS 3 & 5 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S HYDRAULICS NAD 83/ NA 2011 F F F F -L - P C S ta . 2 0 + 3 1.4 3 -Y 2 - PO T S ta . 1 1+ 7 8 .2 3 20+00 S A LEGEND: SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS SITE 2 24" RCP-III SEE DETAIL 'A' 2' BASE TAIL DITCH R ELO CAT IO N CHAN N EL SEE D ETA IL 'C' ( Not to Scale) DETAIL C CHANNEL RELOCATION Type of Liner= CL I Rip-Rap EST. 110 SY GEO-TEXTILE EST. 80 TONS STA. 19+80 -L- LT ONLY ON BANKS GEOTEXTILE1.5' Ground Natural Ground Natural B D 3:13:1 B= 5 Ft. Min. D= 3 Ft.Length = 60 FT Slope = 0.3% B 3:13: 1 D ( Not to Scale) 2' BASE TAIL DITCH FROM STA. 19+42 TO STA. 20+00 -L- LT DETAIL A B= 2 Ft. Min. D= 3 Ft. Ground Natural Ground Natural Length = 42 FT Slope = 0.6% 15" R C P-I V 15" RCP-IV CB(G) CB(G) EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE C B (F ) C B (E ) C B (F ) C B (G ) 15 " RC P -IV RC P-I V 15" 15" RCP-IV w /M H JB JB w /M H 18 " RC P-IV 60" R CP-III CB(G) HW 15" RCP-IV RCP-III 30" 60" RCP - II I 60" RCP-III 2 4 " R C P - I V 15" RCP-IV 48" 3SB W 48" 3SBW 48" 3SB W 48" 3SB W BL-4 BL-5 B L -6 WOODS WOOD S WOOD S SHEET __ OF __ PERMIT DRAWING U-5710A 6A SEE SHEET 9 FOR -Y3- PROFILE SEE SHEET 8 FOR -L- PROFILE PROPOSED SIGNAL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 R O W R E V . - J U N E 19 , 2 0 19 - A D D E D TC E TO P A R C E LS 1 & 2 . A D D ITIO N A L P D E A N D TW E A K E D RO W O N P A RC E L 2 . R ED U C E D TC E O N P A RC E LS 6 , 7 , 8 A N D 9 . C E H . E LIM IN A TIN G C LA IM S . P A R C E L 15 A A D D E D F O R EA S TP O R T H O A . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R E D TO P A R C E L 1 . A D D E D RIG H T O F W A Y A N D TC E A R O U N D C E N TER P O IN T S TU B O U T O N P A RC E L 1. RE M O V E D TC E O N P A RC E LS 3 & 5 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S HYDRAULICS NAD 83/ NA 2011 F F F F -L - P C S ta . 2 0 + 3 1.4 3 -Y 2 - PO T S ta . 1 1+ 7 8 .2 3 20+00 S A 17 17 17 18 18 18 18 18 19 19 19 19 19 20 20 20 20 20 2 0 2 0 20 20 20 20 21 21 2 1 21 21 2 1 2 1 2 1 21 22 22 2 2 22 22 2 2 22 2 2 22 2 2 2 2 2 3 23 23 23 2 3 23 23 23 2 4 LEGEND: SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS SITE 2 24" RCP-III SEE DETAIL 'A' 2' BASE TAIL DITCH R ELO CAT IO N CHAN N EL SEE D ETA IL 'C' ( Not to Scale) DETAIL C CHANNEL RELOCATION Type of Liner= CL I Rip-Rap EST. 110 SY GEO-TEXTILE EST. 80 TONS STA. 19+80 -L- LT ONLY ON BANKS GEOTEXTILE1.5' Ground Natural Ground Natural B D 3:13:1 B= 5 Ft. Min. D= 3 Ft.Length = 60 FT Slope = 0.3% B 3:13: 1 D ( Not to Scale) 2' BASE TAIL DITCH FROM STA. 19+42 TO STA. 20+00 -L- LT DETAIL A B= 2 Ft. Min. D= 3 Ft. Ground Natural Ground Natural Length = 42 FT Slope = 0.6% 15" R C P-I V 15" RCP-IV CB(G) CB(G) EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE C B (F ) C B (E ) C B (F ) C B (G ) 15 " RC P -IV RC P-I V 15" 15" RCP-IV w /M H JB JB w /M H 18 " RC P-IV 60" R CP-III CB(G) HW 15" RCP-IV RCP-III 30" 60" RCP - II I 60" RCP-III 2 4 " R C P - I V 15" RCP-IV 48" 3SB W 48" 3SBW 48" 3SB W 48" 3SB W BL-4 BL-5 B L -6 WOODS WOOD S WOOD S CONC 21'1SFD RIP RAP 24" C&G 8 0 " B L K W A L L 80" BLK WALL 30" C&G SR 1409 MILITARY CUTOFF RD 85' BST CONC ISL DR YS D ALE DR 18' BST 120" BST CONC21' CONC21' 15" C&G W HH HH S HH HH HH E M TRAFFIC 170 176 177 178179 180 181 S TOP=24.22'OUT=19.28'OUT=21.10' TOP=24.24' NO FLOW RISER FULL OF WATER FLOW LINE OUT=20.40'TOP=23.70' IS UNDER PAVEMENTPOSSIBLE JB8" PVC 36" RCP 48" RCP 24" RCP INV=20.24' BOT. BOX 2 4 " R C P 12" CMP 2 4 " R C P 2 4 " C M P 5 4 " RC P 1SFD 1SFD 1SFD 1SFD 1SFD BOT. OF BOX INV=21.60' TOP=24.86' BOT. OF BOX INV=16.66' DMH WOODS WOODS WOODS WOODS TOP=25.35' 24" RCP IN=20.63' 36" RCP IN=19.00' 48" RCP IN=16.25' OUT=16.20'FES OUT=15.05' DMHIN=18.48'OUT=17.83' GRATE TOP=19.50' RISER TOP=19.69' RIP RAP TOP=24.33' IN=20.11' OUT=20.08'DI THROAT OF BOX GRATE ELEVATED ABOVE TOP=22.53' OUT=20.76' PLASTIC DI TOP=23.37' OUT=19.67' TRAFFIC DI CB POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC MARKERUTILITYCARSONITER/W TRAFFIC SPIKE DIP DIP 10' DRAINAGE EASEMENT R/W MON R/W MON ECM ECM EIP 100.00' EXISTING R/W EXISTING R/W 72.3' K1856G W K1857G W K1858G W K1859G WK1860G W K1861G W IN=20.40' 12" CMP 12" CMP 12" CMP END NOT FOUND (SW) IN=19.78' BL-5 80" BLK WALL 48" WIRE 48 " 3 S B W 4 8" 3 S BW 15" C & G CONC CLIPPER LN 18' BST 21' CONC 2 1' CONC 19' CONC (UNABLE TO TRACE) APPROX. WATER LOCATION BL-5 BL-6 U5710-5 80" BLK WALL WOODS WOODS WOODS SHEET __ OF __ PERMIT DRAWING F F F F F F F F F -L- POT Sta. 24+06.05 -L- PT Sta. 23+10.34 -Y2- POT Sta. 10+00.00 -L- PC Sta. 20+31.43 -Y2- POT Sta. 11+78.23 -Y2- 20+00 SURFACE WATER DENOTES IMPACTS INSS TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: SITE 2 M A T C H L I N E - L - S T A. 1 9 + 6 0 , S E E S H E E T 6 NAD 83/ NA 2011 U-5710A 7 MODIFIED SIGNAL SEE SHEET 9 FOR -L- PROFILE 13 14 ETHEL L. REYNOLDS THOMAS HERGA DB 5654 PG 0358 MB 32 PG 295 DB 4902 PG 0969 MB 32 PG 295 DB 2288 PG 544 EASTPORT HOA INC R O W R E V . - J U N E 19 , 2 0 19 - R E V IS E D P D E A N D A D D E D TC E TO P A R C E L 2 . R E V IS E D T C E TO S TA Y O F F O F H O U S E O N P A RC E L 10 . C E H . P U E O N P A RC E L 12 C H A N G ED TO D U E A N D M O D IF IE D . P D E A D D E D TO P A R C E LS 12 & 13 . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R D TO P A RC E L 1. RO W A D D E D TO P A R C E L 11. RO W A D J U S TE D A N D RE D U C E D O N P A R C E LS 12 & 13 . HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S P E N T A B L E : F I L E : N o r t h _ C a r o li n a _ D e p t _ o f _ T r a n s p o r t a t i o n \ 2 0 1 4 _ 1 6 _ P la n n i n g _ D e s i g n _ L S A \ U _ 5 7 1 0 _ T O _ 4 _ c \ 0 6 . 0 0 _ P r o j e c t _ E n g i n e e r i n g _ a n d _ D e s i g n \ U - 5 7 1 0 A \ H y d r a u li c s \ P E R M I T S _ E n v i r o n m e n t a l\ D r a w i n g s \ U 5 7 1 0 A _ P R M _ P S H . d g n U S E R : J M A S S R O C D A T E : 8 / 2 1 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt P L O T D R I V E R : 8 : 3 3 : 1 5 A M T I M E : N C D O T _ p e r m i t s _ N O C O N . t b l DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS CHORD AC AC FUTURE ROW 176.43' RT -L- +48.83 176.42' RT -L- +57.53 C H O RD C H O R D POND 24" RCP-III SEE DETAIL 'B' CHANNEL IMPROVEMENTS RELOCATION CHANNEL SEE DETAIL 'C' ( Not to Scale) DETAIL C CHANNEL RELOCATION Type of Liner= CL I Rip-Rap EST. 110 SY GEO-TEXTILE EST. 80 TONS STA. 19+80 -L- LT ONLY ON BANKS GEOTEXTILE1.5' Ground Natural Ground Natural B D 3:13:1 B= 5 Ft. Min. D= 3 Ft.Length = 60 FT Slope = 0.3% B 3:13: 1 D ( Not to Scale) CHANNEL IMPROVEMENTS FROM STA. 22+81 TO STA. 23+24 -L- LT DETAIL B Min. D= 3 Ft. B= 5 Ft. Ground Natural Ground Natural Length = 80 FT Slope = 0.3% REM O VE REMOVE RETAIN RETAIN R E TA IN 15" R C P- I V RCP-IV 15" RETAIN RETAIN CB(F) CB(G) CB(G) CB(E) CB(E) CB(F) w/MH TB JB CB(G) CB(E) 15" RCP-IV CB(E) RETAIN RETAIN CB(G) REMOVE REMOVE 24" RCP-III 15" R C P- I V 15" RCP-IV RCP-IV 15" w/MH JB HW w/MH JB JB w/MH 18 " RC P- IV w/MH JB 60" R C P-III 60" RCP-III HW STORMWATER BASIN EASTPORT HOA STRUCTURE DRAWDOWN 60" RCP-III 60" R CP-III 3 6 " RC P-IV RCP-IV 15" RETAIN 12" CMP REMOVE H D P E 1 5 " CONC 21'1SFD RIP RAP 24" C&G 8 0 " B L K W A L L 80" BLK WALL 30" C&G SR 1409 MILITARY CUTOFF RD 85' BST CONC ISL DR YS D ALE DR 18' BST 120" BST CONC21' CONC21' 15" C&G W HH HH S HH HH HH E M TRAFFIC 170 176 177 178179 180 181 S TOP=24.22'OUT=19.28'OUT=21.10' TOP=24.24' NO FLOW RISER FULL OF WATER FLOW LINE OUT=20.40'TOP=23.70' IS UNDER PAVEMENTPOSSIBLE JB8" PVC 36" RCP 48" RCP 24" RCP INV=20.24' BOT. BOX 2 4 " R C P 12" CMP 2 4 " R C P 2 4 " C M P 5 4 " RC P 1SFD 1SFD 1SFD 1SFD 1SFD BOT. OF BOX INV=21.60' TOP=24.86' BOT. OF BOX INV=16.66' DMH WOODS WOODS WOODS WOODS TOP=25.35' 24" RCP IN=20.63' 36" RCP IN=19.00' 48" RCP IN=16.25' OUT=16.20'FES OUT=15.05' DMHIN=18.48'OUT=17.83' GRATE TOP=19.50' RISER TOP=19.69' RIP RAP TOP=24.33' IN=20.11' OUT=20.08'DI THROAT OF BOX GRATE ELEVATED ABOVE TOP=22.53' OUT=20.76' PLASTIC DI TOP=23.37' OUT=19.67' TRAFFIC DI CB POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC POSTPLASTIC MARKERUTILITYCARSONITER/W TRAFFIC SPIKE DIP DIP 10' DRAINAGE EASEMENT R/W MON R/W MON ECM ECM EIP 100.00' EXISTING R/W EXISTING R/W 72.3' K1856G W K1857G W K1858G W K1859G WK1860G W K1861G W IN=20.40' 12" CMP 12" CMP 12" CMP END NOT FOUND (SW) IN=19.78' BL-5 80" BLK WALL 48" WIRE 48 " 3 S B W 4 8" 3 S BW 15" C & G CONC CLIPPER LN 18' BST 21' CONC 2 1' CONC 19' CONC (UNABLE TO TRACE) APPROX. WATER LOCATION BL-5 BL-6 U5710-5 80" BLK WALL WOODS WOODS WOODS SHEET __ OF __ PERMIT DRAWING 1 9 20 20 20 21 21 22 22 2 2 22 22 22 2222 2 32323 23 23 2 3 23 23 23 2 4 2 4 2 4 24 2 4 24 25 2 5 2 5 2 5 2 5 2 5 F F F F F F F F F -L- POT Sta. 24+06.05 -L- PT Sta. 23+10.34 -Y2- POT Sta. 10+00.00 -L- PC Sta. 20+31.43 -Y2- POT Sta. 11+78.23 -Y2- 20+00 SURFACE WATER DENOTES IMPACTS INSS TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: SITE 2 M A T C H L I N E - L - S T A. 1 9 + 6 0 , S E E S H E E T 6 NAD 83/ NA 2011 U-5710A 7 MODIFIED SIGNAL SEE SHEET 9 FOR -L- PROFILE 13 14 ETHEL L. REYNOLDS THOMAS HERGA DB 5654 PG 0358 MB 32 PG 295 DB 4902 PG 0969 MB 32 PG 295 DB 2288 PG 544 EASTPORT HOA INC R O W R E V . - J U N E 19 , 2 0 19 - R E V IS E D P D E A N D A D D E D TC E TO P A R C E L 2 . R E V IS E D T C E TO S TA Y O F F O F H O U S E O N P A RC E L 10 . C E H . P U E O N P A RC E L 12 C H A N G ED TO D U E A N D M O D IF IE D . P D E A D D E D TO P A R C E LS 12 & 13 . C E H . R O W R E V . - A U G U S T 16 , 2 0 19 - P A R C E L 2 RE - N U M B E R D TO P A RC E L 1. RO W A D D E D TO P A R C E L 11. RO W A D J U S TE D A N D RE D U C E D O N P A R C E LS 12 & 13 . HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. RE VIS IO N S P E N T A B L E : F I L E : N o r t h _ C a r o li n a _ D e p t _ o f _ T r a n s p o r t a t i o n \ 2 0 1 4 _ 1 6 _ P la n n i n g _ D e s i g n _ L S A \ U _ 5 7 1 0 _ T O _ 4 _ c \ 0 6 . 0 0 _ P r o j e c t _ E n g i n e e r i n g _ a n d _ D e s i g n \ U - 5 7 1 0 A \ H y d r a u li c s \ P E R M I T S _ E n v i r o n m e n t a l\ D r a w i n g s \ U 5 7 1 0 A _ P R M _ P S H . d g n U S E R : J M A S S R O C D A T E : 8 / 2 1 / 2 0 1 9 N C D O T _ p d f _ c o lo r _ e n g _ 1 0 0 . p lt P L O T D R I V E R : 8 : 3 2 : 4 1 A M T I M E : N C D O T _ p e r m i t s _ C O N . t b l DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS CHORD AC AC FUTURE ROW 176.43' RT -L- +48.83 176.42' RT -L- +57.53 C H O RD C H O R D POND 24" RCP-III SEE DETAIL 'B' CHANNEL IMPROVEMENTS RELOCATION CHANNEL SEE DETAIL 'C' ( Not to Scale) DETAIL C CHANNEL RELOCATION Type of Liner= CL I Rip-Rap EST. 110 SY GEO-TEXTILE EST. 80 TONS STA. 19+80 -L- LT ONLY ON BANKS GEOTEXTILE1.5' Ground Natural Ground Natural B D 3:13:1 B= 5 Ft. Min. D= 3 Ft.Length = 60 FT Slope = 0.3% B 3:13: 1 D ( Not to Scale) CHANNEL IMPROVEMENTS FROM STA. 22+81 TO STA. 23+24 -L- LT DETAIL B Min. D= 3 Ft. B= 5 Ft. Ground Natural Ground Natural Length = 80 FT Slope = 0.3% REM O VE REMOVE RETAIN RETAIN R E TA IN 15" R C P- I V RCP-IV 15" RETAIN RETAIN CB(F) CB(G) CB(G) CB(E) CB(E) CB(F) w/MH TB JB CB(G) CB(E) 15" RCP-IV CB(E) RETAIN RETAIN CB(G) REMOVE REMOVE 24" RCP-III 15" R C P- I V 15" RCP-IV RCP-IV 15" w/MH JB HW w/MH JB JB w/MH 18 " RC P- IV w/MH JB 60" R C P-III 60" RCP-III HW STORMWATER BASIN EASTPORT HOA STRUCTURE DRAWDOWN 60" RCP-III 60" R CP-III 3 6 " RC P-IV RCP-IV 15" RETAIN 12" CMP REMOVE H D P E 1 5 " Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 15+80 to 16+30 -L- Roadway Fill 0.038 0.007 2 19+50 to 23+68.78 -L-60" RCP 0.094 372 Channel Improvements 0.015 0.004 91 25 Channel Relocation 0.010 0.002 62 9 TOTALS*:0.038 0.000 0.000 0.007 0.000 0.119 0.006 525 34 0 *Rounded totals are sum of actual impacts NOTES: Revised 2013 10 24 SHEET OF 50115.1.2 08/19/2019 NEW HANOVER NC DEPARTMENT OF TRANSPORTATION U-5710A WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS