Loading...
HomeMy WebLinkAboutNCC191704_NOT Closeout Documents_20220906SEDIMENTATION INSPECTION REPORT New Hanover County Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910)-798-7139 Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist Email: bwetherill@nhcgov.com Project Name & Location: Bennett Village Apartments — 719 Piner Road Grading Permit #: 03-19 Financially Responsible Party & Address: GL & SM Limited Partnership — 1406 Castle Hayne Road, Wilmington, NC 28401/ Bennett Village Apartments, LLC— PO BOX 15025 Wilmington, NC 28408 Pictures: ❑ Yes ❑X No Weather & Soil Conditions: Sunny, Dry soil conditions, 95F Inspection Type: ❑ Initial ❑ Periodic ® Final ❑ Complaint Date Report Sent: 8/11/2022 Contact Made With: N/A Inspection report to be sent/given, including financially responsible party: Stephanie Norris — snorris@norcomanagement.com / Marcus Reynolds — marc.reynoIds@wynnefieldproperties.com / Michael Freeman — mfreeman@lmmclamb.com / Benny Doby — bdoby@lmmclamb.com / Oliver Maxwell — omaxwell@lmmclamb.com / John Lickteig — iickteig@lmmclamb.com / Bruce Carpenter- bcarpenter@lmmclamb.com / David L. Menius- Imenius@stroudengineer.com Has this project been issued a NOV? ❑ Yes ❑X No Potential NPDES violation? ❑ Yes ❑X No Degree: Choose an item. NPDES Type: Choose an item. Is there offsite sediment? El Yes ❑X No Degree: Choose an item. Location: Click or tap here to enter text. Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: N N/A Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: ® N/A Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. The New Hanover County Land Disturbance Permit is now closed. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Report by: Beth Furr Date of Inspection: 8/10/2022 Others Present: N/A Bfurr@nhcgov.com Contact this office with any questions and/or comments about this report and/or project. SEDIMENTATION INSPECTION REPORT Pictures: N/A Contact this office with any questions and/or comments about this report and/or project.