Loading...
HomeMy WebLinkAbout20071522 Ver 1_More Info Letter_20070918~~~ WATFR p ~~ y ~? r -~ v '~ September 18, 2007 EXPRESS REVIEW NOTIFICATION LETTER Mr. Rob Bailey 442 %2 East Main St. Clayton, NC 27520 Project Name: Porto Fino Residential Subdivision Dear Mr. Bailey: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Johnston County EXP# 07-1522 On September 17, 2007, the Express Review Program of the Division of Water Quality (DWQ) received your application for the above referenced project. The DWQ has determined that your application will require additional information. Please provide the following information so that we may continue to review your project and prevent denial of your application as required by 15A NCAC 2H .0506: 1. Please provide one (1) copy of a comuleted PCN Addendum as requested in the Express Review acceptance letter. As per the attached PCN Addendum, please provide all the items that were missing from your September 17, 2007 submittal (pre-construction/existing conditions map for all phases of the project (please include culvert sizing); drainage plan; level spreader worksheets; etc.) 2. Diffuse Flow Provisions as required by the Neuse Riparian Buffer Rule: a. All proposed level spreaders must be designed according to the DWQ Level Spreader Design Guidance (January 1, 2007) or the 2007 NC DWQ Stormwater BMP Manual. b. Please provide details on your pre-treatment method (i.e. vegetated Swale details, supporting calculations, etc.). c. All level spreaders must include a forebay. d. Please provide details on your bypass method (typical details and supporting calculations). e. Please revise the level spreader length (or redesign utilizing a more appropriate BMP) that you have proposed for level spreaders 3, 5-11, as they are too short. f. Most areas where level spreaders have been proposed appear to have a higher slope g. Please provide 1:50,000 scale drawing of level spreaders 13, 14, and 15. h. Please include construction notes/instructions for installation of the level spreaders. 3. Approved Stormwater Management Plans: a. Please provide one (l) copy of the approved (by Johnston County) Stormwater Management Plans for the entire project. b. Please provide a written response to DWQ regarding how the stipulations in the Johnston County Stormwater Management Approval have been addressed. 4. Stub Roads: a. DWQ has concerns regarding cumulative impacts. Please explain the two stubbed out roads located on the eastern property boundary. The proposed thoroughfare road seems to have riparian buffer and stream impacts that are not shown on this application. 401 Oversight /Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: h~://h2o.enr.state.nc.us/ncwetlands No°ChCarolina ~aturally An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper Please respond within five (5) days of the date of this letter by sending three (3) copies of this information. The Express Review Program is a process that requires all parties to participate in a timely manner. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please contact Lia Myott at (919) 733-9502 if you have any questions. Sincerely CBK/lem Cyndi Karoly, Supervisor 401Bxpress Review Oversite Unit cc: DWQ Raleigh Regional Office DLR Raleigh Regional Office USACE Raleigh Field Office Central Files File copy Kevin Yates, John R. McAdams Company, 2905 Meridian Pkwy., Durham, NC 27713