Loading...
HomeMy WebLinkAboutBR.0102_Start of Study Letter_signedSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR MEMORANDUM August 26, 2022 FROM: Daniel Dagenhart NCDOT Division 9 — Division Bridge Program Manager J. ERIC BOYETTE SECRETARY SUBJECT: Replace Bridge No. 37 on NC 268 (Lynchburg Road) over Big Creek in Stokes County, North Carolina, Project No. BR-0102 NCDOT Division 9 is beginning the project development, environmental, and engineering studies for the proposed replacement of Bridge No. 37 on NC 268 (Lynchburg Road) over Big Creek in Stokes County. Right of way acquisition is scheduled for fiscal year 2023, and construction is scheduled for fiscal year 2024. The attached figures show the vicinity, study area and topography maps for the proposed project. The project is currently state funded; however, NCDOT is preparing a Categorical Exclusion document and has made a preliminary determination that the project will not proceed through the NEPA/404 Merger Process. In lieu of holding an in -person scoping meeting, NCDOT is providing the attached project information and map. We welcome your input on the proposed project, and we would appreciate any information that may be helpful in evaluating the potential environmental effects. If applicable, please identify any permits or approvals which may be required by your organization. Please provide your input by October 1, 2022. If you have any questions concerning the project, please contact me at (336) 747-7800 or by email at drda eg nhartkncdot.gov. Please include the Project Number BR-0102 in all correspondence and comments. Thank you for your cooperation. Sincerely, Daniel R. Dagenhart T cuue� T c�e,r�cc�t- Attachments Project Data Sheet & maps Mailing Address: Location: NC DEPARTMENT OF TRANSPORTATION Telephone: (919) 220-4600 375 SILAS CREEK PARKWAY HIGHWAY DIVISION 9 Customer Service: 1-877-368-4968 WINSTON-SALEM, NC 27127 375 SILAS CREEK PARKWAY WINSTON-SALEM, NC 27127 Website: www.ncdot.gov North Carolina Department of Transportation Project Data Sheet Essential Proiect Information STIP Project Name Bridge No. 37 on NC 268 (Lynchburg Rd) over Big Creek near Danbury. STIP Number BR-0102 WBS No. 67102.1 County Stokes NCDOT Division 9 ROW Date 2023 LET Date 2024 Schedule Considerations N/A ROW: $320,000 Cost Estimates LET: $3,200,000 Total: $3,520,00 Funding Type I State Proposed Project Details Project Description Replacement of Bridge No. 37 on NC 268 (Lynchburg Rd) over Big Creek From the bridge, the study area covers approximately 500' south of Project Limits the bridge on NC 268 and approximately 500' north to NC 89 on NC 268. Typical Section Two 11-foot travel lanes with 4-foot paved shoulders. Access Control Design Speed Right -of -Way Width Physical or Engineering Constraints Other Considerations Survey Request Date Design Plan Construction Recommendation Consultant Involvement Project History Planning Studies SPOT Description Feasibility Studies Problem Statement Alternatives Previously Dismissed and Whv No control of access 40 mph (Design Exception required) Varies, but maintain existing ROWS as minimum width Low: Aerial Power and underground telecom. Lynchburg Rd has a T-intersection with NC 89 approximately 80 feet north of Bridge No. 37, Potential Off -site detour over 10 miles long and not recommended by local officials. Summit Design and Engineering Services — designs Three Oaks Enaineerina, Inc. — Nannina I Ground Disturbinq CE N/A none Bridge is structurally deficient due to substructure rating of 4; sufficiency rating is 49.99. Replace in -place with offsite detour not feasible due to 10 mile shortest Dossible detour route. 7/2022 Purpose &_Need Purpose Re lace Bridge No. 37 Need(s) Bridge is structurally deficient and needs to be replaced. Supporting Data Substructure rating of 4: sufficiencv rating is 49.99. Alternatives Currently Under Consideration Alternative 1 Replace structure on new alignment to the west of the Alternative 2 Public and cy Coordination 10 Anticipated Permits Section 404/401 nationwide permit Federal Agency Involvement USACE, USFWS Public Involvement Strategy Landowner notification letters Merger Screening Date Project will not enter the Merger Process. Potential Merger Triggers None Existing Conditions Functional Classification Strategic Highway Corridor AADT Access Control Typical Section Right -of -Way Width Posted Speed Structures (bridges, etc.) Railroad Involvement Minor collector No 2023 ADT = 1,000 vpd 2043 ADT = 1,545 vpd None Two 11 ft lanes with 1-2 ft shoulders 60 ft Statutory 55 MPH(posted ad RCBC, One structure, Bridge No. 37 No Other Adjacent STIP Projects I N/A Preliminary Resource Inven Utilities Hazardous Materials _ Known Potentially -Eligible National Register of Historic Places Sites/Districts Other Cultural Resources Wetlands Streams FEMA Floodplain Detailed Study Area Water Supply Watersheds Riparian Buffer Rules Active Agriculture 35 MPH for horizontal curve Table Low: Aerial Power and underground telecom 1 UST & 1 AST No TBD No Big Creek 1 % annual chance flood zone No No No 7/2022 Parks, Greenways, Game Lands, Section 4(f) & Section 6(f) Properties Environmental Justice Populations Other Resources (i.e., Wild and Scenic Rivers, TVA, Scenic Bvways, etc.) [Me TBD Riverweed Darter occurrence, planned multi -use path 500 ft east along Dan River. Project Management Approval Project Manager Name Daniel Da enhart — Division 9 Signature Date Supervisor Name Signature Date 7/2022 Legend = Project Study Area eRt I (n z 11111 ey ep ep n s c n Project Location 89 CL 0. s tip•.. yr - ¢a y u Hanging Rock Slate Park n O F n$00rh� a Rd �1 - 0 0.25 0.5 1 Miles NORTH C4 VICINITY MAP County: STOKES 'O REPLACE BRIDGE 37 yaw w NORTH CAROLINA Div: 9 STIP#BR-0102 Figure DEPARTMENT ON NC 268 (LYNCHBURG RD) o OF TRANSPORTATION OVER BIG CREEK WBS: 67102.1 9 �Q DIVISION OF HIGHWAYS 'OF TNPNSQ�� STOKES COUNTY NORTH CAROLINA I Date: JULY 2022 Legend , Project Study Area NCDOT Bridge' N Streams - NHD •4 Parcel Boundary k :sF Bridge 37 F� A- « - C89 0 150 300 600 Feet NORTH STUDY AREA MAP County: STOKES Cq 'O REPLACE BRIDGE 37 yaw w NORTH CAROLINA Div: 9 STIP#BR-0102 Figure DEPARTMENT ON NC 268 (LYNCHBURG RD) o OF TRANSPORTATION OVER BIG CREEK WBS: 67102.1 9 �Q DIVISION OF HIGHWAYS 9?4jFNT °F TNPNSQ�� STOKES COUNTY NORTH CAROLINA I Date: JULY 2022 Legend Project Study NCDOT Bridge 0 250 500 1,000 Feet 2A N Fu SGS Topo Quad - Hanging Rock NORTH Cq USGS TOPO MAP County: STOKES 'O REPLACE BRIDGE 37 yaw w NORTH CAROLINA Div: 9 STIP#BR-0102 Figure DEPARTMENT ON NC 268 (LYNCHBURG RD) o OF TRANSPORTATION OVER BIG CREEK WBS: 67102.1 9 �Q DIVISION OF HIGHWAYS 9?4jFNT °F TNPNSQ�� STOKES COUNTY NORTH CAROLINA I Date: JULY 2022 Legend Project Study Area NCDOT Bridge Streams - NHD ® Wetlands - NWI `a Flood Hazard - FEMA ifs Bridge 37 4 r 0 150 300 600;i Feet 1,'� i' fiM, °,NpRTH,4 ENVIRONMENTAL FEATURES MAP County: STOKES 'O REPLACE BRIDGE 37 yaw w NORTH CAROLINA Div: 9 STIP#BR-0102 Figure DEPARTMENT ON NC 268 (LYNCHBURG RD) o OF TRANSPORTATION OVER BIG CREEK WBS: 67102.1 9 �Q DIVISION OF HIGHWAYS 9?4jFNT °F TNPNSQo� STOKES COUNTY NORTH CAROLINA I Date: JULY 2022