Loading...
HomeMy WebLinkAbout20221185 Ver 1_Riparian Buffer Authorization Request_20220831Buffer Authorization Application Form 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Water Reources ENVIRONMENTAL QUALITY Original Submittal 8/31/2022 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* 1. Property Owner Information: la. Name on Recorded Deed: * 1b. Responsible Party: lc. Mailing Address:* 1d. Telephone:* 919-448-4505 rtrone@withersravenel.com Please list the contact person's email for questions or payment on this project if needed. Owner Applicant other than Owner Agent Neuse Crossing HOA Inc. Blake King (for Corporations) Street Address 7905 Old Mill Ridge Court Address Line 2 City State / Province / Region Raleigh NC Postal / Zip Code Country 27616 USA 2. Applicant's Information (if different from owner): 1 e. Email Address: * twovse64@icloud.com 2a. Name: T. Glenn Zeblo 2b. Company Affiliation: Alpha & Omega Group 2c. Mailing Address: Street Address 4601 Lake Boone Trail Address Line 2 Suite 3C City State / Province / Region Raleigh NC Postal / Zip Code Country 27607 USA 2d. Telephone: 919-981-0310 2e. Email Address: tgzeblo@aogroup.com 2f. Attach a signed and dated copy of the authorization granting the applicant owner approval. An agent authorization form is acceptable. Click the upload button or drag and drop files here to attach document signed_Agent Authorization_Alpha&Omega Group.pdf PDF only 3. Agent Information: 3a. Name: 3b. Company Affiliation: 1.47MB 3c. Mailing Address: Street Address Address Line 2 City Postal / Zip Code 3d. Telephone: 3e. Email Address: State / Province / Region Country 3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document authorization form. PDF Only B. Project Information and Prior Project History 1. Project Information la. Name of Project:* Neuse Crossing Trail Bridge Replacements (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No Id. Subdivision Name: le. Nearest Municipality: Raleigh, NC If. Property Size: 29.66 acres 1g. County (or Counties) where the project is located:* Wake Ih. Property ID# 1747057138 Tax PIN or Parcel id 1747067411 Tax PIN or Parcel id 1747051996 Tax PIN or Parcel id 1747064114 Tax PIN or Parcel id Date of Purchase 1i. Deed Information Type of Book Deed Map Book# 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1k. How would you like to provide the Latitude and Longitude information?* Address Lookup • Manually Latitude* 35.882538 Longitude * 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes • No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * Neuse River 2b. Water Quality Classification of nearest receiving water: C;NSW Page# -78.525568 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 235 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project sites consist of existing greenway trails and wooded areas. General land use in the vicinity is residential with large vacant areas. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document PDF only 3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * The project consists of replacement of two existing walking trail bridges within four parcels located near 3427 Beaux Court in Raleigh. The only proposed impacts will be to riparian buffers for the proposed replacement bridges. Bridge 1 will cross Stream 1 just east of the current bridge which is to be removed. The Bridge 2 replacement will cross Stream 2. The existing greenway bridge will be removed, and a new bridge constructed west of the old bridge location. Segments of new trail will be added to connect the new bridges to the existing trails. These new segments of trail will just be simple foot paths with no built -upon area and no removal of trees. These impacts are "deemed allowable" but because they overlap with impacts for site access, they are included in the impact totals. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Agent/Consultant WithersRavenel (Name if known) 07/27/2021 I , pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: WR requested a Preliminary Jurisdictional Determination from the USAGE for the project locations. Lyle Phillips with USACE concurred with the delineation performed by WR for the review area via an email sent October 21, 2021 (see attached). No wetlands were identified at either location. Both streams are depicted on the USGS topo map and the Wake County Soil Survey and therefore are subject to the Neuse buffer rules. Subjectivity to the buffer rules for Streams 1 and 2 is conceded by WR and a buffer determination from DWR will not be required. 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* Yes • No 7. Future Project Plans 7a. Is this project a phased project?* C. Proposed Impacts Inventory ..................................................................................................................................... Buffer Impacts Yes • No Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 B1: Bridge 1 construction Map label (e.g. Road Crossing 1) Stream 1 Temporary I (T) Perm or Temp Allowable 1,849. 00 Square Feet 0.00 Square Feet B2: Bridge 1 access Map label (e.g. Road Crossing 1) Stream 1 Temporary (T) Perm or Temp Allowable 5,963. 00 Square Feet 1,729. 00 Square Feet B3: Bridge 1 Footers Map label (e.g. Road Crossing 1) Stream 1 Permanent (P) Perm or Temp Allowable 60.00 Square Feet 0.00 Square Feet B4: Bridge 2 construction Map label (e.g. Road Crossing 1) Stream 2 Temporary (T) Perm or Temp Allowable 1,580. 00 Square Feet 0.00 Square Feet B5: Bridge 2 access Map label (e.g. Road Crossing 1) Stream 2 Temporary (T) Perm or Temp Allowable 1,652. 00 Square Feet 1,658. 00 Square Feet B6: Bridge 2 Footers Map label (e.g. Road Crossing 1) Stream 2 Permanent (P) Perm or Temp Allowable 72.00 Square Feet 0.00 Square Feet Total Zone 1 Impacts: 11,176.00 Total Zone 2 Impacts: 3,387.00 Total Buffer Impacts: 14,563.00 Comments: The proposed impacts for the Bridge 1 replacement consist of 60 sq ft of permanent Zone 1 impacts to riparian buffers for bridge footers. Additionally, 9,541 sq ft of temporary buffer impacts are proposed (Zone 1: 7,812 sq ft; Zone 2: 1,729 sq ft). Temporary buffer impacts are necessary for site access, bridge construction, and for the creation of the new trail segments to connect the new bridges to the existing trails. Note that these new trail segments overlap with the temporary impacts for access and have been included in this application but are considered "deemed allowable" in the Neuse Buffer Rules because they do not include removal of any trees or the addition of any built -upon area, they are simply foot paths a couple feet in width. Proposed impacts for the Bridge 2 replacement consist of 72 sq ft of permanent impacts to buffers for bridge footers. Temporary buffer impacts for Bridge 2 total 4,890 (Zone 1: 3,232 sq ft; Zone 2: 1,658 sq ft) and are for the same reasons as Bridge 1. D. Impact Justification and Mitigation .................................................................................................................................................................... 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. The proposed bridge replacements have been designed to cross streams and riparian buffers at a perpendicular angle to minimize impacts to buffers. Replacement bridges will be installed in a top -down construction method to avoid disturbance to streams. The existing greenway trails are adjacent to buffered streams and impacts to riparian buffers are unavoidable. No new built -upon area is proposed, and existing trails will remain as unimproved foot paths. Additionally, new segments of trail necessary to connect the replacement bridges to the existing trails have been designed to also consist of no built -upon area and no removal of trees.. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Existing trails will be utilized for site access with only temporary impacts proposed. No wetlands or streams will be impacted at either site. Typical erosion control measures will be implemented and maintained at both bridge sites (see attached diffuse flow documentation). E. Diffuse Flow Plan la. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach document Bridge Replacement_Diffuse Flow Doc.pdf 76.6KB PDF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: Click the upload button or drag and drop files here to attach document Appendix.pdf PDF only 7.49MB Please see attached documentation. H. Sign and Submit By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name: * Rick Trone Signature Rcc¢ litou Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* • Yes No Yes • No ID#* 20221185 Version:* 1 Select Reviewer: * Colleen Cohn:eads\cmcohn Select Reviewing Office* Raleigh Regional Office - (919) 791-4200 Is this project a public transportation project?* Has payment been received?* • No Payment Needed Fee Received Need Fee - send electronic notification %. WithersRavenel IN/ Our People. Your Success. AUTHORITY FOR APPOINTMENT OF AGENT The undersigned contract purchaser, Alpha & Omega Group (Client) does hereby appoint WithersRavenel, Inc. as his, her, or it's agent for the purpose of petitioning the appropriate local, state and federal environmental regulatory agencies (US Army Corps of Engineers, NC Division of Water Quality, NC Division of Coastal Management, local municipalities, etc.) for: a) review and approval of the jurisdictional boundaries of onsite jurisdictional areas (wetlands, streams, riparian buffers, etc.) and/or; b) preparation and submittal of appropriate environmental permit applications/requests for the following parcels: • Wake Co. PIN: 1747057138, ±14.68-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747067441, ±1.81-acre parcel, located near 3453 Singleleaf Lane in Raleigh, NC. • Wake Co. PIN: 1747051996, ±10.58-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747064114, ±2.59-acre parcel, located near 3427 Beaux Court in Raleigh, NC. The Client does hereby authorize that said agent has the authority to do the following acts on behalf of the owner: (1) To submit appropriate requests/applications and the required supplemental materials; (2) To attend meetings to give representation on behalf of the Client. (3) To authorize access to subject property for the purpose of environmental review by appropriate regulatory agencies. This authorization shall continue in effect until completion of the contracted task or termination by the Client. Agent's Name, Address & Telephone: WithersRavenel, Inc. 115 MacKenan Drive Cary, NC 27511 Tel. (919)-469-3340 Date: 22 Sept 2021 Signature of Client: T. Glenn Zeblo / Vice President Digitally*, yet T. Glenn Zeblo DN: cn= 4- I Zeblo, o=Alpha & Omega Group, ou, email=tgzeblo@aogroup.com, c=US Date: 2021.09.22 13:58:47 -04'00' 4601 Lake Boone Trail, Ste 3C Mailing Address Raleigh, NC 27607 City State Zip Phone: 919-981-0310 ext 204 Email: tgzeblo@agoroup.com 115 MacKenan Drive 1 Cary, NC 27511 t: 919.469.3340 1 f: 919.467.6008 1 www.withersravenel.com 1 License No. C-0832 Asheville 1 Cary 1 Greensboro 1 Pittsboro 1 Raleigh 1 Wilmington 11 WithersRavenel Our People. Your Success. August 31, 2022 NC -Division of Water Resources 401 & Buffer Permitting Unit Attn: Mr. Paul Wojoski 1617 Mail Service Center Raleigh, North Carolina 27699 Re: Bridge 1 & Bridge 2 Replacement - Diffuse Flow Documentation Garner, Wake County USACE AID: SAW-2021-02056 WR Project #02210291.00 Mr. Wojoski, The proposed bridge project consists of the replacement of two existing bridged greenway crossings over Stream 1 and Stream 2. The proposed bridge replacements project will not result in concentrated stormwater flow through the riparian buffer. Temporarily disturbed areas adjacent to the project will be stabilized with appropriate measures to prevent stormwater flow through the buffer in both the near and long term. Please feel free to call if you have questions or require additional information. Sincerely, WithersRavenel /1-/7---r Rick Trone Permitting Specialist 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I f: 919.467.6008 I www.withersravenel.com I License No. F-1479 Asheville I Cary I Charlotte I Greensboro I Lumberton I Pittsboro I Raleigh I Southern Pines I Wilmington %. WithersRavenel 41 Our People. Your Success. August 31, 2022 NC -Division of Water Resources 401 & Buffer Permitting Unit Attn: Mr. Paul Wojoski 1617 Mail Service Center Raleigh, North Carolina 27699 Re: Neuse Crossing Trail Bridge Replacements Raleigh, Wake County USACE AID: SAW-2021-02056 WR Project #02210291.00 Mr. Wojoski, On behalf of Alpha and Omega Group, we are requesting a Buffer Authorization from the NC DWR for 132 sq ft of permanent buffer impacts and 14,431 sq ft of temporary buffer impacts for the replacement of two adjacent bridged stream crossings on portions of the Neuse River Greenway Trail system. Bridge 1 is between Forest Mill Court and Singleleaf Lane in Raleigh (35.882538°N; - 78.525568°W). Bridge 1 will cross Stream 1 just east of the current bridge which is to be removed. The project area is in the Neuse River basin and onsite waters drain to the Neuse River. The Water Quality Classification for the Neuse River is C;NSW and the Stream Index Number is: 27-(22.5). The cataloging unit for the site is 03020201. The Bridge 2 project area is in Raleigh, just north of Duveneck Drive (35.879006°N; - 78.528047°W). The Bridge 2 replacement will cross Stream 2 The existing greenway bridge will be removed, and a new bridge constructed west of the old bridge location. The project area is in the Neuse River basin and onsite waters drain to the Neuse River. The Water Quality Classification for the Neuse River is C;NSW and the Stream Index Number is: 27-(22.5). The cataloging unit for the site is 03020201. Proposed Project The project consists of replacement of two existing walking trail bridges within four parcels located near 3427 Beaux Court in Raleigh. The only proposed impacts will be to riparian buffers for the proposed replacement bridges. Bridge 1 will cross Stream 1 just east of the current bridge which is to be removed. The Bridge 2 replacement will cross Stream 2. The existing greenway bridge will be removed, and a new bridge constructed west of the old bridge location. Segments of new trail will be added to connect the new bridges to the existing trails. These new segments of trail will just be simple foot paths with no built -upon area and no removal of trees. These impacts are "deemed allowable" but because they overlap with impacts for site access, they are included in the impact totals. 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I f: 919.467.6008 I www.withersravenel.com I License No. F-1479 Asheville I Cary I Charlotte I Greensboro I Lumberton I Pittsboro I Raleigh I Southern Pines I Wilmington ■■ WithersRavenel .. Our People. Your Success. Project History The proposed locations for the bridge replacements were reviewed for water resources by WR in July 2021. The review of the proposed alignment determined the proposed bridges are near the confluence of two unnamed perennial streams adjacent to the Neuse River (Stream 1 and Stream 2). WR requested a Preliminary Jurisdictional Determination from the USACE for the project locations. Lyle Phillips with USACE concurred with the delineation performed by WR for the review area via an email sent October 21, 2021 (see attached). No wetlands were identified at either location. Both streams are depicted on the USGS topo map and the Wake County Soil Survey and therefore are subject to the Neuse buffer rules. Subjectivity to the buffer rules for Streams 1 and 2 is conceded by WR and a buffer determination from DWR will not be required. Proposed Impacts The proposed impacts for the Bridge 1 replacement consist of 60 sq ft of permanent Zone 1 impacts to riparian buffers for bridge footers. Additionally, 9,541 sq ft of temporary buffer impacts are proposed (Zone 1: 7,812 sq ft; Zone 2: 1,729 sq ft). Temporary buffer impacts are necessary for site access, bridge construction, and for the creation of the new trail segments to connect the new bridges to the existing trails. Note that these new trail segments overlap with the temporary impacts for access and have been included in this application but are considered "deemed allowable" in the Neuse Buffer Rules because they do not include removal of any trees or the addition of any built -upon area, they are simply foot paths a couple feet in width. Proposed impacts for the Bridge 2 replacement consist of 72 sq ft of permanent impacts to buffers for bridge footers. Temporary buffer impacts for Bridge 2 total 4,890 (Zone 1: 3,232 sq ft; Zone 2: 1,658 sq ft) and are for the same reasons as Bridge 1. The proposed buffer impacts are noted in the table below: Proposed Buffer Impact Table Impact # Feature Permanent Temporary Zone 1 (sf) Zone 2 (sf) Zone 1 (sf) Zone 2 (sf) Bridge 1 Stream 1 60 - 7,812 1,729 Bridge 2 Stream 2 72 - 3,232 1,658 Buffer Totals 132 - 11,044 3,387 Page 2 of 3 ■■ WithersRavenel .. Our People. Your Success. Avoidance and Minimization The proposed bridge replacements have been designed to cross streams and riparian buffers at a perpendicular angle to minimize impacts to buffers. Replacement bridges will be installed in a top - down construction method to avoid disturbance to streams. The existing greenway trails are adjacent to buffered streams and impacts to riparian buffers are unavoidable. No new built -upon area is proposed, and existing trails will remain as unimproved foot paths. Additionally, new segments of trail necessary to connect the replacement bridges to the existing trails have been designed to also consist of no built -upon area and no removal of trees. Existing trails will be utilized for site access with only temporary impacts proposed. No wetlands or streams will be impacted at either site. Typical erosion control measures will be implemented and maintained at both bridge sites (see attached diffuse flow documentation). The current request is for 132 sq ft of permanent impacts to riparian buffers and 14,431 sq ft of temporary buffer impacts for the bridge replacement project. Proposed impacts for the Bridge 1 replacement consist of 60 sq ft of permanent impacts to buffers. Temporary impacts for the Bridge 1 replacement consist of 9,541 sq ft. Proposed impacts for the Bridge 2 replacement consist of 72 sq ft of permanent impacts to buffers. Temporary impacts for the Bridge 2 replacement consist of 4,890 sq ft. (see the attached maps and Buffer Authorization Form for details). Please feel free to call if you have questions or require additional information. Sincerely, WithersRavenel Rick Trone Environmental Scientist Attachments: • Riparian Buffer Authorization Form • Agent Authorization • Aerial Exhibit • USGS Quad Maps • Wake County Soil Survey • USACE Concurrence Email/Delineation Exhibit • Impact Exhibits Page 3 of 3 aOur WithersRavenel People. Your Success. AGENT AUTHORIZATION %. WithersRavenel IN/ Our People. Your Success. AUTHORITY FOR APPOINTMENT OF AGENT The undersigned contract purchaser, Alpha & Omega Group (Client) does hereby appoint WithersRavenel, Inc. as his, her, or it's agent for the purpose of petitioning the appropriate local, state and federal environmental regulatory agencies (US Army Corps of Engineers, NC Division of Water Quality, NC Division of Coastal Management, local municipalities, etc.) for: a) review and approval of the jurisdictional boundaries of onsite jurisdictional areas (wetlands, streams, riparian buffers, etc.) and/or; b) preparation and submittal of appropriate environmental permit applications/requests for the following parcels: • Wake Co. PIN: 1747057138, ±14.68-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747067441, ±1.81-acre parcel, located near 3453 Singleleaf Lane in Raleigh, NC. • Wake Co. PIN: 1747051996, ±10.58-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747064114, ±2.59-acre parcel, located near 3427 Beaux Court in Raleigh, NC. The Client does hereby authorize that said agent has the authority to do the following acts on behalf of the owner: (1) To submit appropriate requests/applications and the required supplemental materials; (2) To attend meetings to give representation on behalf of the Client. (3) To authorize access to subject property for the purpose of environmental review by appropriate regulatory agencies. This authorization shall continue in effect until completion of the contracted task or termination by the Client. Agent's Name, Address & Telephone: WithersRavenel, Inc. 115 MacKenan Drive Cary, NC 27511 Tel. (919)-469-3340 Date: 22 Sept 2021 Signature of Client: T. Glenn Zeblo / Vice President Digitally*, yet T. Glenn Zeblo DN: cn= 4- I Zeblo, o=Alpha & Omega Group, ou, email=tgzeblo@aogroup.com, c=US Date: 2021.09.22 13:58:47 -04'00' 4601 Lake Boone Trail, Ste 3C Mailing Address Raleigh, NC 27607 City State Zip Phone: 919-981-0310 ext 204 Email: tgzeblo@agoroup.com 115 MacKenan Drive 1 Cary, NC 27511 t: 919.469.3340 1 f: 919.467.6008 1 www.withersravenel.com 1 License No. C-0832 Asheville 1 Cary 1 Greensboro 1 Pittsboro 1 Raleigh 1 Wilmington %. WithersRavenel 110 Our People. Your Success. AUTHORIZATION FOR PROPERTY ACCESS The undersigned owner(s), Neuse Crossing HOA Inc, do(es) hereby authorize WithersRavenel, Inc. to access the following parcels for the purpose of environmental regulatory agency review (US Army Corps of Engineers, NC Division of Water Quality, NC Division of Coastal Management, US Fish and Wildlife Service, local Municipalities, etc.) and approvals (i.e. wetland delineation, stream/buffer determination, environmental permitting, etc.) at the request of the contract purchaser: • Wake Co. PIN: 1747057138, ±14.68-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747067441, ±1.81-acre parcel, located near 3453 Singleleaf Lane in Raleigh, NC. • Wake Co. PIN: 1747051996, ±10.58-acre parcel, located near 3427 Beaux Court in Raleigh, NC. • Wake Co. PIN: 1747064114, ±2.59-acre parcel, located near 3427 Beaux Court in Raleigh, NC. This authorization does not bind the current property owner(s) to financial responsibility for services rendered on the subject property by WithersRavenel, Inc. This agreement shall continue in effect until completion/termination of the purchase contract for the subject property. Date: 9/22/2021 Contract Purchaser's Agent Info: Signature of Owner(s): Blake King President WithersRavenel, Inc. 115 MacKenan Drive Name - Print Title Cary, NC 27511 Signature Tel. (919)-469-3340 7905 old Mill Ridge Ct Mailing Address Raleigh Nc 27616 City State Zip 9194484505 Phone: Twovse64@icloud.com Email: 115 MacKenan Drive 1 Cary, NC 27511 t: 919.469.3340 1 f: 919.467.6008 1 www.withersravenel.com 1 License No. C-0832 Asheville 1 Cary 1 Greensboro 1 Pittsboro 1 Raleigh 1 Wilmington ::WithersRavenel Our People. Your Success. AERIAL EXHIBIT a 4 GRAPHIC SCALE 0 110 220 1 inch = 220 ft. i I REVIEW AREA I /./..-,0,_____.- - (BRIDGE 2) 101 REVIEW AREP1111 (BRIDGE 1) 2`�c Nm O NN ZC BA�D\E RED �PF 21 NAS REET NEUSE CROSSING HOA BRIDGES AERIAL (2017) 1!WithersRavenel Engineers Planners Surveyors ALEIGH WAKE COUNTY NORTH CAROLINA ::WithersRavenel Our People. Your Success. USGS QUADS RALEIGH NEUSE CROSSING HOA BRIDGES WAKE COUNTY NORTH CAROLINA SINGLiiELEAF04���oo di REVIEW AREA ,- (BRIDGES 1&2) ✓i1 0Lp C0UN TRy- USGS (2019) - WAKE FOREST pip WithersRavenel Engineers Planners Surveyors 1 inch = 500 ft. RALEIGH NEUSE CROSSING HOA BRIDGES WAKE COUNTY NORTH CAROLINA REVIEW AREA (BRIDGE 1) REVIEW AREA (BRIDGE 2) USGS (2019) - WAKE FOREST 4iWithersRavenel! Engineers I Planners I Surveyors Lill WithersRavenel Our People. Your Success. WAKE COUNTY SOIL SURVEY 1 inch = 500 ft. RALEIGH NEUSE CROSSING HOA BRIDGES WAKE COUNTY NORTH CAROLINA REVIEW AREA (BRIDGE 1) REVIEW AREA (BRIDGE 2) WAKE CO. SOIL SURVEY (1970) - SHEET 30 1!WithersRavenel Engineers Planners Surveyors aOur WithersRavenel People. Your Success. USACE CONCURRENCE EMAIL From: Phillips, George L CIV USARMY CESAW (USA) To: Ricci. Alvssa Subject: Neuse Crossing HOA Bridges / Raleigh / Wake County / SAW-2021-02056 / Jurisdictional Determination Request Date: Thursday, October 21, 2021 3:07:56 PM Attachments: Preliminary Jurisdictional Determination Request Exhibit.pdf Ms. Ricci, I do not need to make a site visit for the above referenced project, and concur with the delineation within the solid red outlined "Review Area" depicted on the attached "Preliminary Jurisdictional Determination Request Exhibit" exhibit. Due to workload volume it may take 90-120 days for the issuance of a standalone JD, however, you may use the delineation for planning and permitting purposes. Should the need for a permit arise the JD can be issued with the permit verification. The AID for this project is SAW-2021-02056. I have attached the "Preliminary Jurisdictional Determination Request Exhibit" exhibit for reference. Please let me know if you have any questions/concerns. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.PhillipsPusace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service- survey/ . Thank you for taking the time to visit this site and complete the survey. • 2 iv RALEIGH GRAPHIC SCALE 0 135 270 1 inch = 270 ft. STREAM 2 PERENNIAL POTENTIALLY NON -WETLAND WATERS OF THE US NEUSE CROSSING HOA BRIDGES WAKE COUNTY NORTH CAROLINA REVIEW AREA (BRIDGE 2) STREAM 1 PERENNIAL POTENTIALLY NON -WETLAND WATERS OF THE US PARCEL BOUNDARY NOTES: 1) WETLAND DELINEATION PERFORMED BY WR ON 07/27/2021. 2) NO WETLANDS WERE IDENTIFIED WITHIN THE REVIEW AREA. 3) LOCATIONS ARE APPROXIMATE, BASED ON GPS LOCATION, WAKE COUNTY GIS DATA, AND TOPOGRAPHIC INTERPRETATION. PRELIMINARY JURISDICTIONAL DETERMINATION REQUEST EXHIBIT 1!WithersRavenel Engineers Planners Surveyors ::WithersRavenel Our People. Your Success. IMPACT EXHIBITS I° o 4 BUFFER PERMANENT IMPACT ZONE 1: 36 SF END BENT 2 FOOTING PROPOSED BRIDGE #2 ss ///� %— BUFFER TEMPORARY IMPACT ZONE 1: 843 SF BRIDGE CONSTRUCTION z / EXISTING CITY OF RALEIGH PAVED 10FT WIDE NEUSE RIVER GREENWAY TRAIL O -3- BUFFER TEMPORARY IMPACT ZONE 1: 737 SF BRIDGE CONSTRUCTION 1 PROPOSED 10' WIDE TEMPORARY CONSTRUCTION ACCESS BETWEEN FENCING PROPOSED TREE PROTECTION FENCE CENTER OF RICER BUFFER TEMPORARY IMPACT ZONE 2: 348 SF ACCESS & SOIL FOOT PATH PROPOSED 4FT WIDE PRIMITIVE SOIL FOOT PATH EXISTING 4FT WIDE PRIMITIVE SOIL FOOT PATH TO REMAIN UNIMPROVED so. •�RR20�F2 REMNANTS OF EXISTING WOOD BRIDGE \ ��� � TO BE REMOVED \ 1 1 AMA F<o �• \�'� 1 1 /1 ) BUFFER PERMANENT IMPACT �� \.\ 1 \ \ \ ZONE 1: 36 SF END BENT 1 FOOTING 1 — __W _ 7 _,V) �- / y _ CONSTRUCTION — — / STAGING AREA — ss ss ss- Try.................�._ BUFFER TEMPORARY IMPACT ZONE 2: 534 SF ACCESS & SOIL FOOT PATH ss sS BUFFER TEMPORARY IMPACT ZONE 1: 1652 SF ACCESS EXISTING 4FT WIDE PRIMITIVE SOIL FOOT PATH TO REMAIN UNIMPROVED Ss END PROPOSED 4FT WIDE — — PRIMITIVE SOIL FOOT PATH BUFFER TEMPORARY IMPACT ZONE 2: 341 SF ACCESS & SOIL FOOT PATH SS EXISTING 4FT WIDE PRIMITIVE SOIL FOOT PATH TO REMAIN UNIMPROVED • PROPOSED SILT FENCE OUTLET FIELD LOCATE IN NATURAL LOW AREAS. (TYP.) NEUSE RIVER ./ / I / /j // EXISTING 20FT CITY OF RALEIGH PUBLIC UTILITY EASEMENT / • \ / \ \\ CONSTRUCTION \ \ STAGING AREA • • BRIDGE #1 BUFFER IMPACT PLAN 0 30 60 90 SCALE: HORIZONTAL 1" = 30' SS EXISTING 4FT WIDE PRIMITIVE SOIL FOOT PATH TO REMAIN UNIMPROVED BUFFER TEMPORARY IMPACT ZONE 2: 435 SF ACCESS • / ti / • c,6 _z • 1 BUFFER TEMPORARY IMPACT ZONE 2: 806 SF ACCESS • — 1 20' NRRB ZONE 2 30' NRRB ZONE 1 • 1 BUFFER TEMPORARY IMPACT ZONE 1: 5963 SF ACCESS & SOIL FOOT PATH CENTER OF RIVER NEUSE CROSSING HOMEOWNERS ASSOC INC PO BOX 99149 RALEIGH NC 27624-9149 \ • D. NEUSE RIVER RIPARIAN BUFFER IMPACT TEMPORARY IMPACTS PERMANENT IMPACTS DESCRIPTION ZONE 1 (SF) ZONE 2 (SF) ZONE 1 (SF) ZONE 2 (SF) BRIDGE 1 CONSTRUCTION 1849 BRIDGE 1 ACCESS 5963 1729 END BENT 1 - FOOTING 30 END BENT 2 - FOOTING 30 BRIDGE 1 TOTALS 7812 1729 60 BRIDGE 2 CONSTRUCTION 1580 BRIDGE 2 ACCESS 1652 1658 END BENT 1 - FOOTING 36 END BENT 2 - FOOTING 36 BRIDGE 2 TOTALS 3232 1658 72 0'\\// PROPOSED SILTATION FENCE ON DOWN SLOPE SIDE SS ss PROPOSED TREE PROTECTION FENCE ON UP SLOPE SIDE BRIDGE #2 BUFFER IMPACT PLAN SCALE: HORIZONTAL 1.3' = 30' \ ss SS EXISTING SANITARY SEWER MAN -HOLE (TYP.) SS / PROPOSED SILT FENCE OUTLET 0 (r- - , , _ • BUFFER PERMANENT IMPACT ZONE 1: 60 SF END BENT 1 FOOTING & END BENT 2 FOOTING L_J BUFFER TEMPORARY IMPACT ZONE 2: 923 SF ACCESS & SOIL FOOT PATH • BUFFER TEMPORARY IMPACT ZONE 1: 859 SF BRIDGE CONSTRUCTION I,/ 1 BUFFER TEMPORARY IMPACT ZONE 1: 990 SF BRIDGE CONSTRUCTION BRIDGE #1 EXISTING 4FT WIDE PRIMITIVE SOIL FOOT PATH TO REMAIN UNIMPROVED PERMANENT IMPACTS ZONE 1 TEMPORARY ACCESS IMPACTS ZONE 1 TEMPORARY ACCESS IMPACTS ZONE 2 TEMPORARY CONSTRUCTION IMPACTS ZONE 1 PROPOSED 6' WIDE TEMPORARY CONSTRUCTION ACCESS PATH PROPOSED 10' WIDE TEMPORARY CONSTRUCTION ACCESS BETWEEN FENCING Ss Ss • • cc z • LLJ 161 • LT 0 0 0 0 co Ce RALEIGH, NORTH CAROLINA LJ— LI— ll;roject No.: 2021.042 Issued For: REVIEW Issued Date: 8/19/2022 Drawn By: WSN Checked By: TGZ Sheet No.: Know what's below. Call before you dig. No. Description: Date: Revision C2.0 8+00 9+00 FILL FACE END BENT 1 10+00 FIELD SURVEY CONTOURS FILL FACE END BENT 1 STA. 10+00.00 -L- WORK POINT 1 N 776446.4656 E 2140499.4113 • O STA. 10+00.00 -L- GRADE POINT EL 185.40 co ) 1'-6" STRUCTURE EXCAVATIO N (TYP.) FILL EL=185.0± BOTTOM OF 10+10 NC FRIS 100-YR EL=193.6± 0 -5% (MAX.) 10+20 PROPOSED FOOT BRIDGE GRADE BEAM EL=181.43 c cb END BENT 1 WSE 8/11/21 EL=178.2± PROFILE MCP CP O GRADE BEAMS ARE NORMAL TO EACH OTHER. • • o \,/cr) o• 10+30 1 10+40 FILL FACE END BENT 2 10+50 STA. 10+30.00 -L- GRADE POINT EL 184.89 EL=182.0± FILL EL=182.2± BOTTOM OF END BENT 2 PROPOSED FOOT BRIDGE 1 1 1 I \\ >^ a I I \ VS <N N n J n \ n n n r II \ / _ c I 1 1 1 1 II _ /, \ \ \ N . \ /�D J I U LJ \ LJI LJ LJ \ LJ I \ I \ 2'-6" \ i \ . LJ \\ / / ) 1 i // i- / / I / / - (TYR) / \ \ // \ \ BRIDGE LENGTH = 30'-0" (FILL FACE TO FILL FACE) , x \ - / GIS CONTOURS PLAN GRADE BEAM EL=180.06 1 FILL FACE END BENT 2 STA. 10+30.00 -L- WORK POINT 2 N 776468.8946 E 2140519.3347 .00 NOTES 1. FOUNDATION IS PRELIIMINARY AND SIZED TO ELIMINATE BOUYANCY. GEOTECHNICAL EXPLORATION WILL BE PROVIDED TO VERIFY STRUCTURE FOUNDATIONS. 2. THIS BRIDGE IS LOCATED IN THE BACKWATER OF THE NEUSE RIVER AND IS ORIENTED PARALLEL TO THE FLOW OF WATER WITHIN THE NEUSE RIVER. 3. THE EXISTING WATER SURFACE ELEVATION IS ESTIMATED BASED ON THE ACTUAL CONDITIONS AT THE TIME OF THE FIELD SURVEY PERFORMED BY WITHERSRAVENEL AUGUST 18, 2021. 4. THE 100 YEAR WATER SURFACE ELEVATION IS BASED ON THE REPORTED DATA FROM NC FRIS WEBSITE. 5. SEE CIVIL SHEETS FOR TREE REMOVAL. r h O 2 a m OW r,oUti a U Uo00 . 2 m O O cc z wHuu ° O z CC aw m 0 w • a 0 z 0 0 a r Z 0 i wo CD m C m i11 Z 0 Z o V) cn 0 w c 0 U 0_ Li] w Z RALEIGH, NORTH CAROLINA 1 a 0 Project No.: 2021.042 Issued For: REVIEW Issued Date: 8/19/2022 J Drawn By: JJL Checked By: TGZ Sheet No.: Know what's below. Call before you dig. No. Description: Date: Revision J S1.1 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 NOTES r 195 190 185 180 175 170 cb '� FILL FACE END BENT 1 STA. 9+98.63 —L— GRADE POINT EL 188.00 +5% 1'-6" STRUCTURE EXCAVATION (TYP.) MAX.) / PROPOSED � FOOT BRIDGE SPAN A FILL FACE END BENT 2 0.00% STA. 10+48.63 —L— GRADE POINT EL 188.00 PROPOSED GRADE FILL BOTTOM OF CAP EL=180.95 2.5'WIDE X 4' DEEP CONCRETE GRADE BEAM W/ TURN BACK WINGS (TYP.) FILL FACE END BENT 1 STA. 9+98.63 —L— WORK POINT 1 N 775159.6487 E 2139780.2537 UM 26" CD N END BENT 1 I I I I I 11\ I I // //1' // 1// V NC FRIS 100—YR LOW CHORD EL=185± EL=182.84± WSE 8/18/21 EL=175± PROFILE NEUSE RIVER 175 \ BRIDGE LENGTH = 50'-0” (FILL FACE TO FILL FACE(/7 • PLAN EXISTING GROUND AD PROPOSED END BENT 2 37 FILL BOTTOM OF CAP / FILL FACE END BENT 2 STA. 10+50 —L— WORK POINT 2 N 775205.5489 E 2139800.0823 Know what's below. Call before you dig. 1. THIS BRIDGE IS LOCATED IN THE BACKWATER OF THE NEUSE RIVER AND IS ORIENTED PARALLEL TO THE FLOW OF WATER WITHIN THE NEUSE RIVER. 2. THE EXISTING WATER SURFACE ELEVATION IS ESTIMATED BASED ON THE ACTUAL CONDITIONS AT THE TIME OF THE FIELD SURVEY PERFORMED BY WITHERSRAVENEL. 3. THE 100 YEAR WATER SURFACE ELEVATION IS BASED ON THE REPORTED DATA FROM NC FRIS WEBSITE. 4. SEE THE "NOTES" SHEET FOR ADDITIONAL NOTES. Founded 1998 LL Lil ce co ce • co ce Lil Lil RALEIGH, NORTH CAROLINA GENERAL DRAWING CD CCI 0 2021.042 Issued For: REVIEW Issued Date: 8/19/2022 Checked By: TGZ Sheet No.: S1.4 No. Description: Date: Revision