HomeMy WebLinkAboutU-2579B Temp Impact Sites 3a and 3b Closeout Request .pdfSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR August 29, 2022 Mr. Dave Wanucha 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Re: Temporary Impact Sites 3A and 313, Forsyth County, TIP No. U-2579B DWR Project No. 20140090v2; COE SAW-2008-03183 Mr. Wanucha: J. ERIC BOYETTE SECRETARY As you are aware, the Department has monitored the Temporary Impact Sites 3A and 3B since construction was completed in 2018. Located in Forsyth County at the intersection of Winston- Salem Northern Beltway and US 158 (Reidsville Rd), the sites were monitored for temporary stream impacts associated with the U-2579B project. According to permit conditions, NCDOT was required to visually monitor the sites using Level II monitoring for vegetative success and stream stability. Hydrologic monitoring was not required for this project. As previously discussed in the restoration plan, the streams are in temporary drainage and construction easements. The site was not used for Compensatory Mitigation purposes and is not held in NCDOT Right of Way or in a Conservation Easement. During the monitoring period, annual monitoring reports were submitted to the appropriate regulatory agencies via the Environmental Analysis Unit (EAU) website: https:llconnect.ncdot.gov/resources/Environmental/EAU/Monitoring-Stewardship/Pa esldefault.aspx After two years of Level II monitoring, the stream is stable and vegetation has met survival the planted species are surviving. Individual annual monitoring data is provided within the monitoring reports available on EAU'S website for years 2019 and 2020 Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH, NC 27699-1598 Telephone: (919) 707-6000 Fax: (919) 212-5785 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: CENTURY CENTER BUILDING A 1020 BIRCH RIDGE DRIVE RALEIGH, NC 27610 On October 1, 2020, a site visit with DWR and other regulatory agency staff was conducted. It was determined that the site success criteria had been met and that no further monitoring would be required. It was requested at the time that the excess geotextile fabric be removed from the stream. NCDOT has completed removal of that material. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 707-6121. Sincerely, DocuSigned by: W. G4q� J4. BSBFC9470D9E461... For Philip S. Harris, III, P.E., Unit Head Environmental Analysis Unit cc: Ms. Amy Chapman, NCDWR Mr. Monte Matthews, USACOE Mr. Eric Alysmeyer, USACOE Mr. Dave McHenry, NCWRC Ms. Amanetta Sommerville, USEPA Ms. Holland Youngman, USFWS Mr. David Harris, P.E., NCDOT-REU Ms. Amy Euliss, NCDOT- Division 9 Mr. Randy Griffin, NCDOT-EAU