Loading...
HomeMy WebLinkAboutWQ0043705_Application (FTSE)_20220831TRANSMITTAL DATE: TO: COMPANY: ADDRESS: PHONE: COPY TO: PROJECT: PROJECT NO: BILL GROUP: WQROS MOORESVILLE REGIO August 23, 2022 Division of Water Resources NCDEQ Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 704-663-1699 Central Avenue Townhomes 00844.04 SO4 DELIVERED VIA: E] Federal Express Mail FOR YOUR: THE FOLLOWING: QUANTITY 1 1 1 REMARKS Messenger Overnight Information/Use Review/Comment O Drawing Specifications DESCRIPTION FTA 06-21 APPLICATION (ORIGINAL) FTA 06-21 APPLICATION (COPY) REVIEW FEE CHECK ($480.00) BY: NICHOLAS T. VESELY, PE P: 917-842-2233 E: NVESELY@V3CO.COM SOUTHEAST RECEIVEDINCDEOIDWR AUG 2 5 2022 WOROS MOORESVILLE REGIONAL OFFICE E V3 Delivery LI Pick Up 121 Approval LI Disk r] UPS Other DATE 08.18.22 08.18.22 08.18.22 2923 South Tryon Street, Suite 320, Charlotte, North Carolina 28203 I 704.940.2883 V3 1 Visio, Vertere, Virtute ... The Vision to Transform with Excellence August 18, 2022 North Carolina Department of Environment and Natural Resources Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 RE: Central Avenue Townhomes 1 Sewer System Extension (FTA 06-21) To whom it may concern, /NCDEQ/DWR AUG 2 4 2022 S VIOORESVILLE REGIONAL OFFICE The referenced project includes thirty (30) townhome units fronting private alleys on the property within the rights -of -way of Carolyn Drive, Central Drive, and Cyrus Drive in the City of Charlotte. The development will be served by a proposed private sanitary sewer main extensions. An anticipated peak flow to the proposed private sanitary sewer system will be 5,700 gallons per day. The design flow has been reviewed and approved by Charlotte Water under Tracking #: 20217051. The private system will consist of 436 linear feet of 8 inch line, 126 linear feet of 4 inch line, and 4 manholes. The private sewer system will serve all 30 townhome rental units. This package includes the completed FTA 04-16 form, statement of Business Registration, Flow Tracking forms, USGS topographic map and aerial. Upon your review of the enclosed information, please feel free to contact me for further discussion. Sincerely, V3 Companies Nicholas Vesely, PE Project Engineer II, Charlotte 2923 South Tryon Street, Suite 320, Charlotte, North Carolina 28203 V3 1 Visio, Vertere, Virtute ... The Vision to Transform with Excellence Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: V V QNn4,..37W (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: RECEIVED/NCDEO/DWR AU4 2 5 2022 WOROS MOORESVILLE REGIONAL OFFICE 1. Applicant's name: MSDD Central, LLC (company, municipality, FIOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ['Municipal ❑ Other 3. Signature authority's name: Kristian Kellogg per 15A NCAC 02T .0106(b) Title: Managing Member 4. Applicant's mailing address: 1029 North Lake Park Boulevard City: Carolina Beach State: NC Zip: 28428- 5. Applicant's contact information: Phone number: (704) 575-0323 Email Address: kris@phoenixdevpartners.com II. PROJECT INFORMATION: 1. Project name: Central Avenue Townhomes 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.21549° Longitude: -80.78518 5. Parcel ID (if applicable): 12906135 and 12906134 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Nicholas Vesely License Number: 047011 Firm: V3 Southeast, PC Mailing address: 2923 South Tryon Suite 320 City: Charlotte State: NC Zip: 28203- Phone number: (917) 842-2233 Email Address: nvesely(ai1v3co.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Sugar Creek Permit Number: NC0024937 Owner Name: CMUD V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: inch ❑ Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 06-21 Page 1 of 5 er Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: WQROS MOORES 'LLEREGIONAL OFFICE 1. Applicant's name: M5DD Central, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ►1 Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal El State/County ❑ Municipal ❑ Other 3. Signature authority's name: Jesse McInerney per 15A ICAC 02T .01 06(b) Title: Managing Member 4. Applicant's mailing address: 1029 North Lake Park Boulevard City: Carolina Beach State: NC Zip: 28428- 5. Applicant's contact information: Phone number: (917) 647-3872 Email Address: iesse@phoenixdevpartners.com REC II. PROJECT INFORMATION: 1. Project name: Central Avenue Townhomes 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.21549° Longitude: -80.78518 5. Parcel ID (if applicable): 12906135 and 12906134 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Nicholas Vesely License Number: 047011 Firm: V3 Southeast, PC Mailing address: 2923 South Tryon Suite 320 City: Charlotte State: NC Zip: 28203- Phone number: (917) 842-2233 Email Address: nvesely@v3co.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Sugar Creek Permit Number: NC0024937 Owner Name: CMUD V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: inch ❑ Gravity 0 Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ►5 N/A 2, If the Applicant is a Developer of lots to be sold, has a Developer's Ot}erational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOAII'OA Operational Aei7t (FORM: 1-IOAI and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No 11 N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) Residential (Leased) 0 School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories 0 Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities 0 Church 0 Nursing Home ❑ Car Wash ❑ Hotel and/or Motels 0 Swimming Pool/Clubhouse 0 Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? 0 Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .01 14(f)? ❑ Yes ® No > If ves, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow 190 gal/Unit 30 5700 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 5700 GPD a See 15A NCAC 02T .01 14(b), (d), (e)(1) and (e)'2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15 A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5,700 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: 0 Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .030 & IDC "Gravit T Sewe:°s): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 6 128 DIP 6 308 PVC 4 126 DIP > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARA FE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A\ NCAC 02T .0305 h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): 0 Portable power source with manual activation, quick -connection receptacle and telemetry - or 0 Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305ft & (r)? 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(f) or (g.), see Section X.1 of this application *15A NCAC 02"I'.0305{ l contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaae 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A > If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? 0 Yes 0 No 1 N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft searation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? 0 Yes Basin name: r1 No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? 0 Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits 0 Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0 1 05f c)(6) (additional permits/certifications)? 0 Yes 0 No Per 15A NCAC 02T.0105{cl(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15ANCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Fore e Mains (latest version) and the Gravi .' Sewer Minimum Design Criteria (latest version) as applicable? ►1 Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: I, NJ IG140LP VE.S L'1 PE , attest that this application for (Professional Engineer's name from Application Item III.1.) C.ENTP . ANI JUG ToWN WWI S (Project Name from Application Item II.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version . Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: ‘. GAR 3. Applicant's Certification per 15A NCAC 02T .0106(b): K 54,.k.1Iu9 I, "' `..°' , attest that this application for (Signature Authority Name from Application Item 1.3.) — .a SEAL p4101� ; 41.11:77r Central Avenue Townhomes (Project Name from Application Item 11.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 14.-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10f000 as well as civil penalties up to $25,000 per violation. / Signature: FORM: FTA 06-21 415 el Date: Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Bloc Design Project Name for which flow is being requested: Central Ave Town Homes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 10.730 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 72.083 0.0057 82.814 83.7% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Central Avenue Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: I Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 11/9/2021 Signing Official Signature Date Chief Engineer Title of Signing Official Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) Design Firm Average Pump Station Capacity Daily Flow (Name or Number) MGD (Fiini / pf) Approx. Current Avg. Daily Flow, MGD Kaw Creek PS 0.800 0.320 0.252 Valley Road PS 1.895 0.758 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.080 0.332 -0.012 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18 CHARLOTTE November 10, 2021 Mr. Mark J. Caspar Bloc Design 2023 South Tryon Street Suite 320 Charlotte, NC 28203 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE CENTRAL AVE TOWN HOMES 3512 CENTRAL AVENUE, CHARLOTTE, NC 28205 CLTWATER TRACKING# 20217051 After an analysis of the sanitary sewer associated with the proposed design of project, 20217051, CENTRAL AVE TOWN HOMES, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 5,700 gallons per day (30 units x 190 gpd/unit) at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NCDEQ-FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained construction has not started within two (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded, and a new flow acceptance request must be made. The CAP analysis performed determines available capacity within the existing public gravity sewer system. The developer is responsible for any additional private or public sewer infrastructure required to convey flow from the proposed development to the existing public gravity sewer. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Gwi W s-w o- Awzc a. Guillermo Anzola / Engineering Assistant CHARLOTTE WATER P: 704-432-5801 / charlottewater.orq Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org Operated by the City of Charlotte USGS SeleOLd U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY eEl By Ole 11SNO:-.Geological Survey timo SCALE 124 000 J 5 1.1 ENT CHARLOTTE EAST QUADRANGLE NORTH CAROLINA • MECKLENBURG COUNTY 7..5.MINUTE SERIFS F-GLLICLAWMATV. A:ad CHARLOTTE EAST, NC 2019 NO TH CA- sLIN Department of the Secretary of State To all whom these presents shall come, Greetings: I, ELAINE F. MARSHALL, Secretary of State of the State of North Carolina, do hereby certify the following and hereto attached to be a true copy of ARTICLES OF ORGANIZATION OF M5DD CENTRAL, LLC the original of which was filed in this office on the 8th day of October, 2021. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 8th day of October, 2021. 0i' Scan to verify online. Certification# C202128001149-1 Reference# C202128001149-1 Page: 1 of 5 Verify this certificate online at https://www.sosnc.gov/verification Secretary of State State of North Carolina Department of the Secretary of Stat Limited Liability Company ARTICLES OF ORGANIZATION SOSID: 2284498 Date Filed: 10/8/2021 1:02:00 PM Elaine F. Marshall North Carolina Secretary of State C2021 280 01149 Pursuant to §57D-2-20 of the General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a limited liability company. 1. The name of the limited liability company is: MSDD Central, LLC (See Item 1 of the Instructions for appropriate entity designation) 2. The name and address of each person executing these articles of organization is as follows: (State whether each person is executing these articles of organization in the capacity of a member, organizer or both by checking all applicable boxes.) Note: This document must be signed by all persons listed. Name Business Address Capacity Jesse McInerney - 6394 Temple Rd. Franklin TN, 37069-7139 United States E1Member DOrganizer Kristian Kellogg - 108 Mary Mack Ln. Fort Mill SC, 29715-9774 United States Member DOrganizer ❑Member ❑Organizer 3. The name of the initial registered agent is: Geoff Kirby 4. The street address and county of the initial registered agent office of the limited liability company is: Number and Street 1029 North Lake Park Blvd City Carolina Beach State: NC ZipCode: 28428-4161County: New Hanover 5. The mailing address, if different from the street address, of the initial registered agent office is: Number and Street City State: NC Zip Code: County: 6. Principal office information: (Select either a or b.) a. The limited liability company has a principal office. The principal office telephone number: (917) 647-3872 The street address and county of the principal office of the limited liability company is: Number and Street: 6394 Temple Rd. City: Franklin State: TN Zip Code:37069-7139 County: Williamson BUSINESS REGISTRATION DIVISION P.O. BOX 29622 Raleigh, NC 27626-0622 (Revised August. 2017) Form L-01 The mailing address, if different from the street address, of the principal office of the company is: Number and Street: City: State: Zip Code: County: b. The limited liability company does not have a principal office. 7. Any other provisions which the limited liability company elects to include (e.g., the purpose of the entity) are attached. 8. (Optional): Listing of Company Officials (See instructions on the importance of listing the company officials in the creation document. Name Title Business Address Jesse McInerney Managing Member 6394 Temple RD. Franklin TN, Kristian Kellogg Managing Member 108 Mary Mack Ln. Fort Mill SC, 9. (Optional): Please provide a business e-mail address:privacy Redaction The Secretary of State's Office will e-mail the business automatically at the address provided above at no cost when a document is filed. The e-mail provided will not be viewable on the website. For more information on why this service is offered, please see the instructions for this document. 10. These articles will be effective upon filing, unless a future date is specified: This is the 7th day of October , 2021 . Jesse McInerne Signa Jesse McInerney Member/Organizer Type or Print Name and Title The below space to be used if more than one organizer or member is listed in Item #2 above. Kristian Kellogg Signature Signature Kristian Kellogg Member/Organizer Type or Print Name and Title Type or Print Name and Title NOTE: 1. Filing fee is $125. This document must be filed with the Secretary of State. BUSINESS REGISTRATION DIVISION P.O. BOX 29622 Raleigh, NC 27626-0622 (Revised August. 2017) Form L-01 (Continued) Persons executing these articles - M5DD Central, LLC Kristian Kellogg - 108 Mary Mack Ln. Fort Mill SC, 29715-9774 United States - Member/Organizer (Continued) Officials executing these articles - MSDD Central, LLC Kristian Kellogg - 108 Mary Mack Ln. Fort Mill SC, 29715-9774 United States 8/17/22, 3:33 PM North Carolina Secretary of State Search Results • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name M5DD Central, LLC Information Sosid: 2284498 Status: Current -Active 0 Date Formed: 10/8/2021 Citizenship: Domestic Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Kirby, Geoff Addresses Reg Office Reg Mailing Mailing 1029 North Lake Park Blvd 1029 North Lake Park Blvd 108 Mary Mack Ln Carolina Beach, NC 28428-4161 Carolina Beach, NC 28428-4161 Fort Mill, SC 29715 Principal Office 108 Mary Mack Ln Fort Mill, SC 29715 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member Managing Member Kristian Kellogg Jesse McInerney 108 Mary Mack Ln. 6394 Temple RD. Fort Mill SC 29715-9774 Franklin TN 37069-7139 https://www.sosnc.gov/online_services/search/Business_Registration_Results 1/1 North Carolina Secretary of State Search Results Page 1 of 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name M5DD Central, LLC Information Sosld: 2284498 Status: Current -Active Date Formed: 10/8/2021 Citizenship: Domestic Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Kirby, Geoff Addresses Reg Office Reg Mailing Mailing 1029 North Lake Park Blvd 1029 North Lake Park Blvd 108 Mary Mack Ln Carolina Beach, NC 28428-4161 Carolina Beach, NC 28428-4161 Fort Mill, SC 29715 Principal Office 108 Mary Mack Ln Fort Mill, SC 29715 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member Managing Member Kristian Kellogg Jesse McInerney 108 Mary Mack Ln. 6394 Temple RD. Fort Mill SC 29715-9774 Franklin TN 37069-7139 https://www.sosnc.gov/online_services/search/Business_Registration_Results 8/25/2022