Loading...
HomeMy WebLinkAboutGW1-2022-07813_Well Construction - GW1_20220819 i WELL CONSTRUCTION RECORD For Internal Use ONLY: I This form can be used for single or multiple wells i I 1.Well Contractor Information: 14.Todd Muench FROM WATER Z ONES DESCRIPTION Well Contractor Name ft. 3371 ft. e. 1 , NC Well Contractor Certification Number 15.OUTER CASING for multi-casedwells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL Parratt-Wolff, Inc. ft. ft. in. Company Name 16.INNER CASING OR TUBING(geothermal dosed-loop) FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: 0 10 ft. in• sch40 PVC List all applicable well permits(i.e.County.State, Variance,Injection,etc.) ft. ft. in. 3.Well Ilse(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public 10 ft' 20 ft- 2 in. .010 sch40 PVC ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) IS.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irri ation 0 ft. 10 ft- Portland Cem Tremie Non-Water Supply Well: 10 r` 16 rr• Bentonite Chi Tremie ❑Monitoring ❑Recovers Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK ifa licible FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑ f-Salinity Barrier 16 20 ft. #1 Sand Tremie ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soil/rock e, rain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) ft. ft. 4.Date Well 6-22-22 s)Completed: Well ID# MW-2R f`• ft. ft. ft. 5a.Well Location: ft. ft. Lanxess Corporation ft. ft. „ h ro..e1 t 5 Y/ Facility/Owner Name Facility IDti(ifapplicable) ft. ft. 520 Broome Road, Greensboro 27604 ft. ft. Ali 202? Physical Address,City,and Zip 21.REMARKS infermaAjeiq Guilford ' ',"O Flush mount J'at"r'� County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (ifwell field one lat/long is sufficient) 36.039655 N -79.777943 w� Signature oftertified Well Contractor Date 6.Is(are)the well(s): ©Permanent or ❑Temporary RV signing this form,I herebv certify that the we/l(s)was(here)constnicied in accordance With 15A NCAC 02C.0100 or 1 SA NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ONo copy o/this record has been provided io the well owner. 1f this is a repair,Jill out known well construction information and explain the nature of the repair under=21 remarks section or on the back of'1his.form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may alsojattach additional pages if necessary. For multiple injection or non-waler supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 20 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdijjereni(example-3@200'and 2@100') construction t0 the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, 1J water level is above casing,use" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 2 (in.) 24b. For Infection Wells ONLV:II In addition to sending the form to the address in 24a above. also submit a copy of.this form within 30 days of completion of well 12.Well construction method: construction to the following: i (i.e.auger,rotary,cable,direct push,etc.) ' Division of Water Resources;Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m Method of test: 24c.For Water Supply&Injection Wells: (gP ) Also submit one copy of this form;within 30 days of completion of 13b.Disinfection type: Amount: well construction to the county health department of the county where constructed. I Form GW-I North Carolina Department of'Environment and Natural Resources-Division of Water Resources Revised August 2013