HomeMy WebLinkAboutNCG550038_Compliance Evaluation Inspection_20220830DocuSign Envelope ID: EDDB846D-70ED-4A58-A110-2A49ECC4F62D
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Donna Bradley
2904 Asheville Hwy
Pisgah Forest, NC 28768
NORTH CAROLINA
Enwroninenta(Quanry
August 30, 2022
SUBJECT: Compliance Inspection Report
2904 Asheville Highway SFR System
NPDES WW Permit No. NCG550038
Transylvania County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the 2904 Asheville Highway
on 8/30/2022. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in NPDES WW Permit No. NCG550038. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
ATTACHMENTS
Ec: LF
Sincerely,
DocuSigned by:
082B1105A3CA418...
Tim Heim P.E., Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
North Caroltna Department of Environmental Quaky 1 D11sion ofWater Resources
Mhollee Regional Office 12C90 US Highway 70 15•amlama. North Carolina 28ti8
DocuSign Envelope ID: EDDB846D-70ED-4A58-A110-2A49ECC4F62D
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 IL I 3 I NCG550038 111 121 22/08/30 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
21IIIIII IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 70I I 711 172 I N I 73I 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
2904 Asheville Highway
2906 Asheville Hwy
Pisgah Forest NC 28768
Entry Time/Date
11:OOAM 22/08/30
Permit Effective Date
20/11/20
Exit Time/Date
12:OOPM 22/08/30
Permit Expiration Date
25/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Donald A Bradley,2904 Asheville Hwy Pisgah Forest NC 28768///
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenar Self -Monitoring Progran Facility Site Review
Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Timothy H Heim DWR/ARO WQ/828-296-4665/ 8/30/2022
�ooassea ny:
ilmottui him
�oaza,05A30H019_.
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
�ooass eaev: 8/30/2022
L—E397192oAUNFF
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: EDDB846D-70ED-4A58-A110-2A49ECC4F62D
3I
NPDES yr/mo/day
NCG550038 111 121 22/08/30
I17
Inspection Type
18LI
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Tim Heim of the Asheville Regional Office performed a Compliance Inspection of the Single Family
Residence (SFR) system Permit NCG550038 on August 30, 2022. The system was found to in
compliance with permit requirements. The original property owner/permittee is now deceased. His
daughter (Donna Bradley) was present and had a good understanding of how the system worked and
its requirements. The septic tank was reported pumped as required. Structure served by the SFR
system is not occupied.
The system was not observed to be discharging at the time of the inspection. No issues of concern
were observed in the area of the filter field or the receiving stream.
Continue to perform regular maintenance and sampling as required by the permit if discharge occurs.
Ms. Bradley was given a Change of Ownership form and indicated that the structure served by the
SFR system might be condemned and removed in the future. She was advised to contact the ARO if
this is the case and request the permit be rescinded.
Page# 2
DocuSign Envelope ID: EDDB846D-70ED-4A58-A110-2A49ECC4F62D
Permit: NCG550038
Inspection Date: 08/30/2022
Owner - Facility: 2904 Asheville Highway
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable El El El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El ❑ ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment:
Septic Tank
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Comment:
Disinfection -Tablet
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Comment:
Yes No NA NE
❑ ❑ • ❑
❑ ❑ • ❑
Yes No NA NE
• ❑ ❑ ❑
1
Page# 3