Loading...
HomeMy WebLinkAboutSAW-2019-01257 PJD FormAppendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 8/24/2022 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Parker, Jerry NCDOT 1584 Yanceyville Street P.O. Box 14996 Greensboro, NC 27415 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: SAW, NCDOT / Bridge 183 / SR2710 / Running Creek Road / Guilford County / Greensboro NC, SAW- 2019-01257 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Guilford County City: Center coordinates of site (lat/long in degree decimal format): Lat.: 36.2334340 Long.:-79.561191 Universal Transverse Mercator: 17 Name of nearest waterbody: Haw River E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): X] Office (Desk) Determination. Date: 7/13/2022 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude (decimal Longitude Estimated amount Type of aquatic Geographic degrees) (decimal degrees) of aquatic resource (i.e., authority to which resource in review wetland vs. non- the aquatic area (acreage and wetland waters) resource "may be" linear feet, if subject (i.e., applicable) Section 404 or Section 10/404 Stream SA i 36.232992 -79.561046 122 feet 1 Non -wetland waters Section 404 UT to Haw River 136.233266 -79.561107 1288 feet I Non -wetland waters Section 404 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Page 1 of 3 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the.JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Page 2 of 3 SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Aerial, soils, and topo maps (Axiom) ® Data sheets prepared/submitted by or on behalf of the applicant/consultant. ❑x Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Ossipee, NC (1970) 7.5-minute topographic quadrangle. ® USDA Natural Resources Conservation Service Soil Survey. Citation: Web Soil Survey (online at http://websoilsurvey.nres.usda.gov), and Soil Survey of Guilford County (1977) ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): NC OneMap 2014 Orthoimagery. or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑x Other information (please specify): QL2.LiDAR (NC SDD website) IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Date: T 2022.08.24 13:11:25-04'00' Signature and date of Regulatory Project Manager (REQUIRED) Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) MNI r' •� rV. •, ..t ,ice' . . .. . Nt Al I • • � + ; ,. t M �• r" +. �7 i� Ike - IN n9reok 4 T to lHawlRiver Stream �� ' � , tip. �< �� `• �,- _ fi r:. ^iF4r:y �1 1��.• �V'tar� ..v � ki•% � d4 � � ,� :.A. ;�r. •. � r_r :itr'+ Legend . .. , - O Study area ��' _ � '�` ��,�a'ti='•: •; �` � �: � 0 Potential non -wetland waters(perennial) , r,._.;:, ,'�`•���ti\.�;' •, � NON- Directionofflow -,. tit, '�•'�'' `� Stream data form location 100 50 0 100 200 ;x Y �� t31� ' 3a` NCDOT roads Feet 1 Prepared for: Project: Title: Drawn by: AEK �.. WBS 17BP.7.R.134 Replace Bridge No. 183 on NRCS Date: Dec 2018 Running Creek Road over UT to Haw River Soil Survey Map Scale: 1:2700 Project No.: 18-007.11 FIGURE QP Guilford County, INC Axiom E"Irnnmenlal, Inc. Background Imagery: Soil Survey of Guilford County (1977), map6, provided by the Natural Resources Conservation Service (NRCS).