HomeMy WebLinkAbout20001195 Ver 15_Corps of Engineer Correspondence_20140916REPLY TO
ATTENTION OF.
DEPARTMENT OF THE ARMY
WiLMINGTON DISTRICT, CORPS OF ENGINEERS
151 PATTON AVENUE
ROOM 208
ASHEVILLE, NORTH CAROLINA 28801-5006
September 16, 2014
Action ID.- SAW-2014-00839
Ms. Courtney Nolan
Federal Aviation Administration
Terminal Engineering Center
1500 Centre Park-way
East Point, Georgia 30344
Dear Ms. Nolan:
"'F"J` . ...... . . . . ... .... .
5", Pi T'
On September 2, 2014, this Office received your request for Department of Army (DA)
authorization for the discharge of fill material into 1,178 linear feet stream channel (595 If
intermittent and 583 If ephemeral stream) and 0.2 acres of wetlands for the Charlotte Douglas
International Airport (CLT), Airport Traffic Control Tower project (ATCT). The project
proposes to replace an existing Air Traffic Control Tower (ATCT) with a new ATCT to support
plans for further airport expansion. The project is located on the southern portion of the CLT site,
located northwest of the intersection of West Boulevard with Billy Graham Parkway, in
Charlotte, Mecklenburg County, North Carolina (N 35.204046, W -80.946237). The project area
is adjacent to unnamed tributaries of Coffee Creek.
Upon review of your Individual Permit application, this Office has determined that the
application is incomplete and we cannot process the permit request until we receive the
following information.
1. Please provide the names and the address of adjacent landowners outside of the Charlotte
Airport and associated properties.
2. The application states that the purpose of the project is to replace the existing ATCT with
a new ATCT due to future plans for further airport expansion. In order to be considered
complete an application must include all activities which the applicant plans to undertake
which are reasonably related to the same project and for which a DA permit would be
required. As such, please provide additional information on what the future airport
expansion includes, including all proposed work associated with this project that would
result in additional impact to waters of the Unites States.
-2-
Please provide this information within (2) weeks of the receipt of this correspondence and if
you have any questions regarding this request, contact Crystal Amschler at (828)-271-7950
extension 231.
Sincerely,
Crystal Anischler
Project Manager
Asheville Regulatory Field Office
cc:
Mr. Chris Petterson
URS Corporation
6000 Fairview Road, Suite 200
Charlotte, North Carolina 28210
(I/Ms. Karen Higgins
NCDENR - Division of Water Resources
Wetland/401 Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617