Loading...
HomeMy WebLinkAboutSW5220201_Plansheet CE-22 - SCM Detail_20220517BEFORE YOU DIG, CALL 0 0 Q NORTH CAROLINA ONE CALL CENTER www.ncocc.org TOP OF DAM 242.50 3 1.87 FT. 1-YR STORM 240.90 � 1 FREEBOARD WQV y TEMP. POOL 240.63 FOREBAY SEDIMENT 10-YR STORM 241.55 V PERMANENT POOL 239.00 -2 4 2 1 /FOREBAY 2 STORAGE ELEVATION 235.0 LAI I /_.)e.0 FOREBAY ENTRANCE 234.0 WET DETENTION POND PROFILE NOT TO SCALE VEGETATED SHELF LANDSCAPE PLAN VEGETATED SHELF = 2202 S.F. ALL PLANTS SHALL BE 3" CONTAINER PLANTS, THERE SHALL BE A MINIMUM OF 3 PLANT SPECIES, AND A MINIMUM OF 50 PLANTS PER 200 SF OF VEGETATED SHELF. ABOVE PERMANENT POOL Botanical Name Common Name QTY. Eupotoriodelphus dubius Dwarf Joe Pye Weed 184 Lobelia cardinalis Cardinal flower 184 Lobelia siphilitica Great blue Lobelia 184 POND SIDE SLOPES Vegetate w/Centipede Seed @ a rate of 60 lbs./Ac. MOTE: CONTRACTOR TO COMPACT BOTTOM OF POND TO =NSURE INFILTRATION IS LESS THAN 0.01 IN./HR. MOTE: A PORTABLE PUMP SHALL BE USED FOR PUMP DOWN AND MAINTENANCE. MOTE: VEGETATED SHELF MUST HAVE 6 IN OF TOPSOIL AS THE TOP LAYER OF MATERIAL BOTTOM POND 232.00 3 1� 6:1 VEGETATED SHELF MAIN POOL SEDIMENT STORAGE ELEVATION 233.0 STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0 239.00 13,080 0 0 1.00 240.00 16,265 14,673 14,673 1.63 240.63 17,265 10,562 25,234 2.00 241.00 18,031 6,530 31,764 3.00 242.00 19,910 18,971 50,735 3.50 242.50 21,809 10,430 61,164 / 0 20 40 50 C \ / \\ Conversion Procedure Sediment Basin to Wet Detention Pond 1. After the site is completely stabilized, contact Stocks Engineering @ 252-459-8196 for verification of completion and stabilization. 2. Contact DEQ for approval to remove all temporary erosion control measures. 3. Upon approval from NC DEQ, begin the conversion of the wet pond from a temporary sediment trap to a permanent BMP as follows. 4. If standing water is in the basin, contractor shall pump the water out discharging through a silt bag. 5. Remove the skimmer which is connected to the riser and convert to the permenent orifice as shown below in detail. 6. Bring the side slopes surrounding the pond and vegetated shelf to the proposed grade. 7. Contractor shall verify pond depth and muck out sediment to the design depth of the pond. 8. Excavated material must be disposed of in an approved off -site location. 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as sediment deposits in the bottom of the pond may affect the depth. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering @ 252-459-8196 to inspect excavated pond before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing pond per details. Establish appropriate permanent vegetation around pond as soon as possible. 12. Upon completion of pond construction, remove sediment from silt fence and dispose of at an approved off -site location. Plant vegetated shelf and seed and mulch side slopes. 13. Contact Stocks Engineering @ 252-459-8196 to inspect completed pond before placing pond in service. * SCM maintenance will be the responsibility of the HOA once turned over by the developer. C�' 70 \ \\7D X X CONCRETEb�E/R OUTLETSTRUCTU/�E NOT TO SCALE P� F O P� 1O 18" CLASS B RIP RAP OUTLET PROTECTION S72037' 0"E 69.27' \ � i 2,3�\ 242 S 242 242� TOP OF DAM 242.5 :TOP OF WEIR 240.9 CR,SSSECT/ON POND W 4" THICK CONCRETE WEIR STRUCTURE 34 LF 4" DIP @ 1.0% 4" PVC CAP WITH SCREW TYPE PLUG TOP ELEV. 240.00 N NORMAL POOL = N V. ELEV. 239.00 BOTTOM ELEV. 238.50 DIP CAP W/2.5" HOLE DRILLED IN CAP. 1 1 /8" RADIUS N N 5' 1 5' EXPANSION JOINT EDGE DETAIL 0M -00 XI 0 m� o^ N 0- LO w Z 0 _ a_ 0 U CD Z Of W W z Z W Z Cn � U o Cn WF- 3: W 3: W W� ZZ00 0LQ � Z N M = U Z Z �W J W (n w> Cn oa co Z BLN=C-1874 CARp HAEL 11-12-21 WET POND SCM # 1 REVISIONS 5/10/22 - DEQ COMMENTS FILE NO. 2021-028 HORZ. SCALE: 1"=100' VERT. SCALE: NONE BUT GOD, WHO IS RICH IN MERCY, BECAUSE OF HIS GREAT LOVE THAT HE HAD FOR US, MADE US ALIVE WITH CHRIST EVEN THOUGH WE WERE DEAD IN TRESPASSES. YOU ARE SAVED BY GRACE! EPH. 2:4-5 CE-22