HomeMy WebLinkAbout20151065 Ver 2_RE_ _External_ RE_ SAW-2022-00680 (NCDOT _ HE-0005_20220826Strickland, Bev
From: Parker, Jerry A
Sent: Friday, August 26, 2022 10:32 AM
To: David.E.Bailey2@usace.army.mil; nancy.oberle@threeoaksengineering.com
Cc: Conchilla, Ryan
Subject: RE: [External] RE: SAW-2022-00680 (NCDOT / HE-0005 / Boom Roadway Access and
Connectivity Project / Greensboro / Guilford County / Div 7)
Dave,
NCDOT is not requesting verification of the use of a Nationwide Permit from USACE. The electronic PCN would not allow
submittal unless the question about Nationwide permits was answered with a type of USACE permit.
Jerry
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Friday, August 26, 2022 10:23 AM
To: nancy.oberle@threeoaksengineering.com
Cc: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; Parker, Jerry A <japarker3@ncdot.gov>
Subject: [External] RE: SAW-2022-00680 (NCDOT / HE-0005 / Boom Roadway Access and Connectivity Project /
Greensboro / Guilford County / Div 7)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Nancy. We received the PCN for the Boom site at PTI. As you know we just issued a No Permit Required letter for this
project based on Div. 7's request earlier this month. The PCN does not appear to propose any 404 impacts, but does
request Section 404 authorization from the Corps via Nationwide Permit 14 in Section A.
Please confirm that you are not requesting verification of the use of a Nationwide Permit from the Corps, and that
instead this PCN is only to request authorization of buffer impacts from NCDWR.
Thanks.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Email: David.E.Bailey2@usace.army.mil
1
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: NCDOT_REG <NCDOT REG@usace.army.mil>
Sent: Friday, August 26, 2022 8:50 AM
To: nancy.oberle@threeoaksengineering.com
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Matthews, Monte K CIV USARMY
CESAW (USA) <Monte.K.Matthews@usace.army.mil>
Subject: SAW-2022-00680 (NCDOT / HE-0005 / Boom Roadway Access and Connectivity Project / Greensboro / Guilford
County / Div 7)
Good morning,
We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave
Bailey for further processing.
Thank you,
Josephine Schaffer
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Thursday, August 25, 2022 3:31 PM
To: NCDOT_REG <NCDOT REG@usace.army.mil>
Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil>
Subject: [Non-DoD Source] PCN - Guilford - DOT
A new project has been received on 8/25/2022 3:27 PM for Piedmont Triad International Airport Manufacturing Site.
The link below will take you to the project folder.
https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2467102;view=browse
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses aren't monitored.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2